| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.8 LAccepted-Finance NAYAPURWA POST BAHARPUR SHUKUL BAZAR DISTRICT AMETHI | ₹81.8 L | L1 | Accepted-Finance Accepted due to lowest quoted rate |
| 2 | L2₹82.2 LRejected-Finance | ₹82.2 L | L2 | Rejected-Finance Rejected due to higher quoted rate |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-non responsive in technical bid |
Tender Value
₹79 L
EMD Value
₹6.0 L
Closing Date
18 Mar 2026, 12:00 pmClosed
OFFICE OF SE AYO-AMB CIRCLE, PWD AYODHYA
OFFICE OF SE AYO-AMB CIRCLE, PWD AYODHYA
Construction of Niduri Tikuri road to mallahanpurwa link road (missing) km1,2(300)
2026_CEUFZ_1124779_1
1479/2yataAyo0A0circle/2025-26 Date-10.03.2026
Open Tender
Civil Works - Roads
180 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.0 L
Yes
OFFICE OF SE AYO-AMB CIRCLE, PWD AYODHYA
30 Apr 2026
13 Mar 2026
18 Mar 2026
13 Mar 2026
18 Mar 2026
13 Mar 2026
16 Mar 2026
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with a all lifts and leads, transporting to site. Spreading, grading to required slpoe and compacting to meet required of table 300.1 and 300.2 as per Technical specification clause 303.1
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical specification clause 405
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405
Brick edging on both sides of roads of 1st class bricks 8cm (3") wide & 12 cm (4.50") deep laid with mud mortor including labour & suplly of bricks finished to required templete and in proper alignment and also including dressing & ramming the excavated earth including all labour T & P sudries required for completion of work with material.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per MORD Technical Specification Clause 502 and direction of Engineer-in-charge
Providing and applying tack coat with Bitumen VG-10 using Prassur distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MORD specification Clause 503 and as per direction of Engineer-in-charge to completion of work.
Providing, laying and rolling of open-graded premix carpet of 20 mm thick compacted composed of 13.2 mm to 5.6 mm aggregates of approved quarry using bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing by Mixol, laying and rolling with a three wheel 80-100 kN static roller, finished to required level and grades as per MORD Specification Clause 508 and as per direction of Engineer-in-charge to completion of work
Providing and laying seal coat Type-C to sealing the voids in a bituminous surface with 6.7 mm aggregates of approved quarry using bitumen (VG-10) to required laid to the specified levels, grade and cross fall as per MORD Specification Clause 510 and as per direction of Engineer-in-charge to completion of work.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete (1:3:6) in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203
Brick masonry work in cement mortar (1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
Providing and laying of 1000mm hume pipe with collar in position including supply of materials , T & P required for proper completion of work as per direction of Engineer in charge.
Providing and laying of 600mm dia hume pipe with collar in position including supply of materials , T & P required for proper completion of work as per direction of Engineer in charge.
Providing and laying of 350mm dia hume pipe with collar in position including supply of materials , T & P required for proper completion of work as per direction of Engineer in charge.
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.0%
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405
Construction of un-reinforced, dowel jointed, at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.20 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plats including leveling the formwork as drawing), spreading the concrete with shovels, rakes, compacted using needls, screed and plate vibrators and finshed in contunuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approadch to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14days curing compound(where specified) and water finishing to lines and grades as per drawing and Techincal specification clause 1501.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete (1:3:6) in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.0%
Note- GST will be paid extra for above all items as per Govt. Norms.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_2.pdf
PDF • 0.80 MB
Tendernotice_3.pdf
PDF • 1.11 MB
BOQ_2096162.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid