Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-Finance | L1 | Accepted-Finance Lowest Bid | |
| 2 | L2₹6.1 Cr+₹6,452.61 (0.01%)Rejected-Finance | L2 | Rejected-Finance Higher Bid |
| Sl No | Description | Qty | Unit | Lunkhoneh L2 | Minboi Vaiphei L1 |
|---|---|---|---|---|---|
| 1.00SH: Construction of Gallery | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m -All kinds of soil | 742.5 | cum | 529.19 ₹3,92,923.58 | 529.12 ₹3,92,868.63 Lowest |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m. | 245.04 | cum | 222.41 ₹54,500.33 | 222.38 ₹54,492.49 Lowest |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level in 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 88.65 | cum | 10,194.85 ₹9,03,773.19 | 10,193.42 ₹9,03,646.68 Lowest |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding cost of centering, shuttering,fininshing and reinforcement - all work upto plinth level in 1:1.5:3 (1 Cement: 1.5 Coarse Sand: 3 graded stone aggregate 20 mm nominal size). | 115.38 | cum | 14,189.3 ₹16,37,160.97 | 14,187.31 ₹16,36,931.71 Lowest |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost ofcentering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 278.31 | cum | 16,275.14 ₹45,29,535.05 | 16,272.87 ₹45,28,901.06 Lowest |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, butresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding the cost of centering, shuttering.finishing and reinforcement (a) 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 50.4 | cum | 15,675.14 ₹7,90,027.26 | 15,672.95 ₹7,89,916.63 Lowest |
| 1.07 | Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Above Plinth level (a) TMT bars. | 36,685.15 | kg | 125.42 ₹46,01,161.32 | 125.41 ₹46,00,537.67 Lowest |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for (i) Foundation footings, bases of column etc. and mass concrete | 174.72 | Sqm | 519.95 ₹90,846.19 | 519.88 ₹90,833.43 Lowest |
| 1.09 | d) suspended floors, roofs, landings, balconies and access platform. | 1,121.28 | Sqm | 842.56 ₹9,44,743.43 | 842.44 ₹9,44,611.12 Lowest |
Tender Value
Refer Docs
EMD Value
₹12.2 L
Closing Date
11 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA, Churachandpur, Manipur
Conference Hall, Mini-Secretariat/DC Office, Chura
Development of Public Ground to International Standards with Turf at Churachandpur
2026_RDnPR_3560_1
03/04/DRDA-EE/ONGC/2026
Open Tender
Civil Works
Item Rate
Churachandpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12.2 L
Yes
16 Nov 2026
4 Nov 2026
11 Nov 2026
4 Nov 2026
11 Nov 2026
4 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH: Construction of Gallery | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m -All kinds of soil | 742.5 | cum | - | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m. | 245.04 | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level in 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 88.65 | cum | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding cost of centering, shuttering,fininshing and reinforcement - all work upto plinth level in 1:1.5:3 (1 Cement: 1.5 Coarse Sand: 3 graded stone aggregate 20 mm nominal size). | 115.38 | cum | - | - |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost ofcentering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 278.31 | cum | - | - |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, butresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding the cost of centering, shuttering.finishing and reinforcement (a) 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 50.4 | cum | - | - |
| - | Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Above Plinth level (a) TMT bars. | 36,685.15 | kg | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for (i) Foundation footings, bases of column etc. and mass concrete | 174.72 | Sqm | - | - |
| - | d) suspended floors, roofs, landings, balconies and access platform. | 1,121.28 | Sqm | - | - |
stage.json
RAW_JSON
tech_eval.pdf
Technical Evaluation • 0.16 MB
boq_comp_chart.xlsx
BOQ Comparative
fin_eval.pdf
Financial Evaluation • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.json
RAW_JSON
Tendernotice_1.pdf
NIT • 0.25 MB
TenderDocuments.pdf
Tender Documents • 7.59 MB
BOQ_3872.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .