Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC GALI NO 5 SUNAROWALI VINOD NAGAR MILL GATE HISAR | ₹1.9 L | L1 | Accepted-AOC ok |
| 2 | L2₹2.0 L+₹18,164.32 (9.76%)Rejected-Finance GALI NO 24 SURYAN NAGAR HISAR HARYANA 125005 | HISAR | HISAR | HARYANA | 125005 | ₹2.0 L+₹18,164.32 (9.76%) | L2 | Rejected-Finance ok |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
6 Jul 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
A/mtc estimate of water supply and sewerage scheme of sector- MGA, Hisar for the year 2025-2026.
2026_HBC_532450_1
2026F509E65C 7760 4DC1 9C22 11A8D711ADD4259HSV
Open Tender
Civil Works
Works
60 days
Hisar
Construction of RCC wall around underground tank and repair of boundary wall with brickwork and plaster at Boosting station, Sector-21P, MGA Hisar and all other works contingent thereto
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
30 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) | 58.5 | Sqm | 139 | ₹8,131.5 |
| 2 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | 8.74 | cum | 4,464 | ₹39,015.36 |
| 3 | [6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 85.5 | Sqm | 282 | ₹24,111 |
| 4 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,550 | Kg. | 66 | ₹1,02,300 |
| 5 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 5.18 | cum | 4,404 | ₹22,812.72 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_611513.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .