Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10,279.80Admitted-Finance | -26.61% | ₹10,279.80 | L1 | Admitted-Finance |
| 2 | L2₹10,925.52Admitted-Finance | -22.00% | ₹10,925.52 | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
17 Apr 2026, 6:00 pmClosed
Executive Engineer
ER. Tilak Raj Rajwal Executive Engineer PMGSY Division Marwah
Restoration of road under the jurisdiction of PMGSY Division Marwah on emergency basis i.e Motorable Path only by way of clearance of snow slips etc for the year 2026 27 likely to occur on. Mulwarwan to Nowpachi
2026_JKRRD_147250_1
EOINo02of2026-27 PMGSY MARWAH
Open Tender
CIVIL
1 days
Marwah
Restoration of road under the jurisdiction of PMGSY Division Marwah on emergency basis i.e Motorable Path only by way of clearance of snow slips etc for the year 2026 27 likely to occur on. Mulwarwan to Nowpachi
2 documents required · 2 mandatory
₹600
Executive Engineer
₹40,000
9 May 2026
11 Apr 2026
18 Apr 2026
11 Apr 2026
17 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Snow Clearance by Mechanical Means using Machines as specified or equivalent Snow Plough or equivalent. | - | cum | - | - |
| 2 | Galla Cutting in compressed snow including all carriages (1200mm deep and 4mtr wide) | - | cum | - | - |
| 3 | Clearing Snow ( with Frost) from Roads Snow Depth upto 150 mm | - | sqm | - | - |
| 4 | Polygonal/ Random Masonry/Rubble Masonry, uncoursed brought to course, laid dry, with Nallah stone in foundation and plinth including cost of through/ bond stones. | - | cum | - | - |
| 5 | Clearance of slips by mechanical means in ordinary soils disposal lead upto 50 m and lift upto 1.5 m. | - | cum | - | - |
| 6 | Clearance of slips by mechanical means in soils mixed with moorum Kankar/ shingle/boulders, disposal lead upto 50 m and lift upto 1.5 m. | - | cum | - | - |
| 7 | Clearance of slips by mechanical means in soils, mixed with Decomposed rocks: by blasting or ay other means. | - | cum | - | - |
| 8 | Clearance of slips by mechanical means in medium hard rocks; by blasting. | - | cum | - | - |
| 9 | Maintenance of road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical specification Clause 1906. | - | cum | - | - |
| 10 | Backfilling behind abutment, wing wall and return wall complete as per drawings &
technical specification Clause 1204.3.8 Granular material | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_229400.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid