Loading…
Loading…
Tender Value
₹42.0 L
EMD Value
₹84,100
Closing Date
25 Jun 2026, 5:00 pm3d left
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER
EE RDSD HAZARIBAG
Construction of four Additional Class Room of middle School Kood under Block Katkamdag
2026_RDSPL_115339_1
RDSPL/SD/HZB/10/2026-27
Open Tender
Civil Works
180 days
KATKAMDAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹84,100
Yes
18 Jun 2026
18 Jun 2026
27 Jun 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Labour for site clearance and cleaning old wall,surface,roof etc. all complete job. | 30 | Nos. | 326.85 | ₹9,805.5 | Item 1 |
| 2 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 24.07 | Cum. | 1,993.04 | ₹47,972.47 | Item 2 |
| 3 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 58.6 | Cum. | 541.67 | ₹31,741.86 | - |
| 4 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 37.96 | Cum. | 167.33 | ₹6,351.85 | - |
| 5 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 37.96 | Cum. | 55.28 | ₹2,098.43 | - |
| 6 | Providing coarse clean sand in filling in foundation trenches or in plinth including thick with all leads and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. | 28.89 | Cum. | 589.51 | ₹17,030.94 | - |
| 7 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.. | 158.47 | Sqm. | 330.34 | ₹52,348.98 | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 11.63 | Cum. | 4,598.23 | ₹53,477.41 | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 10.24 | Cum. | 4,961.73 | ₹50,808.12 | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level of grade 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 3.92 | sq.m | 5,218 | ₹20,454.56 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
SBD.pdf
Tender Documents • 1.07 MB
BOQ_155944.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid