Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.7 LAccepted-AOC 13 1 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | ₹19.7 L Quoted ₹19.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹21.2 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹21.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KUMAR ERECTORS L1 | THIAGARAJAN ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting the HRH header connection tube of size OD 47.63mmx 5mm thick removal of existing defective boiler tube from the header stub by grinding, the new tube edge preparation, positioning and tube welding includes two layer tig welding and 4 layer arc welding by IBR welder | 80 | Nos. | 8,137 ₹6.5 L | 9,081 ₹7.3 L |
| 2.00 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test | 160 | joints | 7,291 ₹11.7 L | 8,138 ₹13.0 L |
| 3.00 | Charges for Post heating and Stress relieving of defective area of HRH header and connecting bends, this work involves welding joints pre heating, post heating and stress relieving | 1 | Time | 25,749 ₹25,749 | 28,738 ₹28,738 |
| 4.00 | Welding electrode Cromotherme-1/cromotherme-2 2.5mm | 1,680 | Nos. | 8.14 ₹13,675.20 | 9.27 ₹15,573.60 |
| 5.00 | Cutting gas Oxygen & Acetylene | 3 | set | 4,134 ₹12,402 | 4,614 ₹13,842 |
| 6.00 | Argon gas for Tig welding | 3 | Nos. | 3,304 ₹9,912 | 3,688 ₹11,064 |
| 7.00 | T & Ps and consumables | 1 | LS | 19,040 ₹19,040 | 21,250 ₹21,250 |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
16 Jun 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM AOH 2025 Unit I Boiler pressure parts Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
2025_EB_564088_1
CE / MTPS-I / SE / M-I / BM /OT.115/ 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹16,000
Yes
27 May 2026
2 Jun 2025
17 Jun 2025
2 Jun 2025
16 Jun 2025
2 Jun 2025
Amount
Charges for cutting the HRH header connection tube of size OD 47.63mmx 5mm thick removal of existing defective boiler tube from the header stub by grinding, the new tube edge preparation, positioning and tube welding includes two layer tig welding and 4 layer arc welding by IBR welder
Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test
Charges for Post heating and Stress relieving of defective area of HRH header and connecting bends, this work involves welding joints pre heating, post heating and stress relieving
Welding electrode Cromotherme-1/cromotherme-2 2.5mm
Cutting gas Oxygen & Acetylene
Argon gas for Tig welding
T & Ps and consumables
THIAGARAJAN ENGINEERING CONTRACTOR (BID ID -1366738)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid