Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
5 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CWE Agra
HQ CWE Agra, 112 Taj Road, Agra Cantt
COMPREHENSIVE MAINTENANCE OF CENTRAL AC PLANTS, MONOBLOCK PUMPS, AHUS COOLING TOWER and CONNECTED WORKS UNDER GE (EAST) AGRA
2026_MES_798737_1
84451/E8
Open Tender
Civil Works
Item Rate
270 days
Agra
MES contractors enlisted for Class D and above and category c(i) for unenlisted contractors meeting the enlistment criteria corresponding to value class and category of work
8 documents required · 8 mandatory
₹500
GE (East) Agra
₹80,000
14 Nov 2026
14 Nov 2026
12 Dec 2026
14 Nov 2026
5 Dec 2026
28 Nov 2026
14 Nov 2026 - 21 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair / maintenance of 9 Central AC plants of following capacities :- (a) Central AC Plant of 2 x 65 TR water cooled chiller type.Location-TL Gp 509 ABW.Make-Voltas (b) Central AC Plant of 3 x 150 TR water cooled chiller type.Location-509 ABW.Make-Bluestar (c) Central AC Plant of 3 x 39 TR water cooled chiller type.Location-Old Fly Catcher 509 ABW.Make-Voltas (d) Central AC Plant of 3 x 65 TR water cooled chiller type.Location-New Clean Room 509 ABW.Make-Bluestar (e) Central AC Plant of 3 x 25 TR water cooled chiller type.Location-AATS.Make-Bluestar (f) Central AC Plant of 3 x 13 TR water cooled chiller type.Location-Missile Shed .Make-Voltas (g) Central AC Plant of 2 x 52 TR water cooled chiller type.Location-23 Para Hanger .Make-Bluestar (h) Central AC Plant of 1 x 60 TR water cooled chiller type.Location-Bgd Mess.Make-Voltas (j) Package AC Plant 15 TR Air Cooled.Make-Bluestar (Description of item Contd....) | |||||
| 1.01 | Item No.1 Contd...
Repair, maintenance and servicing of central air-conditioning plants at various locations, including daily operational check-ups and periodical servicing by authorised representatives of the original equipment manufacturer (OEM), to maintain the plants in a reliable, safe and efficient operating condition. The work shall include planned preventive maintenance carried out systematically by qualified and experienced personnel, comprising regular inspection, testing, lubrication, adjustment, fault diagnosis, repair and replacement of defective mechanical and electrical components, as required, including testing and commissioning after completion of the work, complete all as specified and as directed
(i) Descaling and cleaning of condenser tubes by opening both end covers, circulating an approved descaling solution using a suitable circulation pump, and manually cleaning the tubes using nylon brushes of size 1/4, 3/8, 1/2 and 5/8 inch, descaling rods of suitable sizes, as required, without damaging the copper tubing, including refixing the end covers and 3 mm thick side cover sheets, replacement of rusted nuts, bolts, complete all as specified and as directed.
(ii) Descaling and flushing of the cooling coil, including chemical cleaning and brushing of the fins and bends, complete all as specified and directed.
(iii) M&L for servicing and cleaning of FRP cooling tower of the specified capacity, including dismantling the top cover, fan and fan motor, removing the honeycomb frills, cleaning the base tray, frills, pot strainer and other components, servicing the fan motor, including replacement of bearings and greasing, refixing the fan, frills and top cover, testing and commissioning to ensure satisfactory operation.
Description of item Contd.... | - | - | - | - |
| 1.02 | Item No.1 Contd....
(iv) Cleaning the cooling coil and air filters of air handling units (AHUs) of the specified capacity, including removing the air filters, cleaning them using an air blower, water and suitable cleaning agent, and refixing them in position after cleaning. Cleaning the cooling coil using wire brushes, an air blower and a water spray pump after applying Scal Gun AL or equivalent chemical cleaner suitable for aluminium fins, straightening the bent fins of the cooling coil using suitable fin-straightening brushes and rewiring all strip heaters installed in the air conditioning plant, including testing for satisfactory operation.
(v) Any defects in the chiller, including sensor faults, repair of the microprocessor card and electrical faults, shall be rectified by the contractor at no extra cost, and the cost of such repairs shall be deemed to be included in the rate. (vi) All electrical faults in the chiller plant control panel, including faults in contactors, single-phase preventers and overload relays, shall be rectified by the contractor. Replacement of defective components, wherever required, shall be carried out by the contractor at no extra cost, except for MCCB replacement. Note: The duration for completion of each job shall be one month from the date of commencement of the job. | - | - | - | - |
| 1.03 | 13 TR to 60 TR (Total - 12 Water Cooled Chiller & 1 Air Cooled Chiller ) | 9 | Each Job | 10 | ₹90 |
| 1.04 | 65 TR to 150 TR (Total- 8 Water Cooled Chiller) | 9 | Each Job | 10 | ₹90 |
| 1.05 | SCOPE OF WORK:-
(a) The detailed AC mechanics of the firm shall report to the JE Concerned for receiving the complaints at round the clock daily including sunday and holiday.
(b) The AC mechanics deployed for the work shall be experienced in the repair and maintenance of AC plants and shall be fully equipped with the required tools and plant (T&P).
(c) The contractor shall display safety instructions inside the cabins of all AC plants, along with the contact numbers of the operator/mechanic, as directed by the Engineer-in-Charge, at no extra cost to the department.
(d) The contractor shall submit the Annual Maintenance Contract (AMC), along with the tax invoice, to the GE for approval within 10 (ten) days of acceptance of the contract. The AMC shall be approved by the competent authority before commencement of the work. No payment shall be made to the contractor without submission of the valid AMC and its approval.
(e) The contractor shall attend to and rectify any breakdown of the AC plant, including faults relating to the compressor, condenser, cooling tower, air handling unit (AHU), control panel, etc., and restore the plant to working condition within 3 (three) hours of receipt of the complaint, round the clock. In case of failure to attend to the complaint and restore the plant within the stipulated time, a penalty of ₹500 per hour shall be levied, and the amount shall be recovered from the RAR.
Description of item Contd.... | - | - | - | - |
| 1.06 | Item No.1.05 Contd....
(f) The Engineer-in-Charge shall maintain a complaint register and call log recording the receipt and rectification of complaints. Complaints requiring major repairs or replacement of major parts shall be rectified within 24 hours. In case rectification is delayed beyond 24 hours and up to 10 (ten) days, a penalty of ₹2,000 per AC plant per day or part thereof shall be levied. For delays exceeding 10 (ten) days, the penalty shall be ₹4,000 per AC plant per day or part thereof.
(g) The decision of the GE as to particular repair is minor/major and a particular AC plant has been maintained or not on a particular day, will be final and biding.
(h) The penalties specified above shall be in addition to the provisions of Clause 50 of IAFW-2249. In the event of burning of a motor, a period of 7 (seven) days shall be allowed to the contractor for rectification of the fault. Failure to rectify the fault within the stipulated period shall attract a penal recovery of ₹2,000 per day for each day of delay
(j) The contractor shall arrange transportation, both to and from the site or E/M yard, for all equipment, tools and plant (T&P) required for carrying out the work. No extra payment shall be admissible on this account. Complaints shall be lodged telephonically. The contractor shall provide valid contact telephone/mobile numbers and a functional email ID for communication..
Description of item Contd.... | - | - | - | - |
| 1.07 | Item No.1.05 Contd....
(k) Repair and maintenance of AC plants shall be carried out through the Original Equipment Manufacturer (OEM) or its authorised representative only. The scope of repair and maintenance shall cover all components of the AC plants. Any component found defective shall be repaired or replaced by the OEM or its authorised representative within the stipulated timelines, as directed by the Engineer-in-Charge.
(l) The compressor shall be checked and tested to ensure proper functioning.
(m) All safety controls, including pressure cut-outs, shall be checked and tested for proper functioning. Any defective safety control shall be replaced with a suitable component, complete all as specified and as directed by the Engineer-in-Charge.
(n) Air filters shall be inspected and cleaned as directed by the Engineer-in-Charge. Cooling coils shall also be inspected and cleaned, complete all as specified and as directed.
(o) The blower motor shall be checked for proper functioning. Any defects noticed shall be attended to and rectified by the contractor without any extra cost to the department.
(p) The drive set of the blower section shall be inspected, belt tension adjusted and worn-out or defective belts replaced, complete all as specified and as directed.
Description of item Contd... | - | - | - | - |
| 1.08 | Item No.1.05 Contd....
(q) Any defects in electrical items, control equipment and wiring shall be attended to and rectified by the contractor, complete all as specified and as directed
(r) Refrigerant gas shall be topped up in the system whenever necessary and as directed by the Engineer-in-Charge. The cost of refrigerant gas shall be measured and paid for separately under relevant items in this schedule.
(s) Condenser water pumps, along with their motors, shall be checked for satisfactory functioning. Any minor repairs required shall be carried out by the contractor without any extra cost to the department.
(t) Cooling tower nozzles shall be inspected and checked to ensure proper water spray. Defective or damaged nozzles shall be replaced, complete all as specified and as directed
(u) The cooling tower sump shall be cleaned regularly, complete all as specified and as directed.
(v) The condenser coil shall be inspected and cleaned, complete all as specified and as directed
(w) Any repairs required to the condenser coil shall be carried out by the contractor without any extra cost to the department.
(x) Any repairs required to the refrigerant piping shall be carried out by the contractor without any extra cost to the department. | - | - | - | - |
| 2 | Supply and charging of refrigerant gas R-22/R-407C in chillers after carrying out evacuation (vacuum) and pressure testing for leakage, including necessary soldering/brazing for rectification of detected leaks, fincluding re-testing and charging the refrigerant to the required quantity as per manufacturer's recommendation, complete all as specified and as directed | 375 | Kg | 10 | ₹3,750 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tenderdocuments.pdf
Tender Documents • 0.51 MB
AppxG.pdf
Additional Documents • 0.06 MB
BOQ_896057.xls
BOQ • 1.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .