Tender Value
₹37.9 L
EMD Value
₹75,800
Closing Date
13 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ELECTRICAL
14 conditions · 3 needing a document upload
As per IRSGCC 2022 (including correction slips and amendments) as on date of publishing of tender
As per IRSGCC 2022 (including correction slips and amendments) as on date of publishing
Electrical License : The tenderer should have minimum valid 'A' Grade Electrical Contractor's License issued by State Electrical Licensing Board. The License should have been issued on a date prior to the date of Tender opening. Clear scanned copy is to be submitted along with the tender
47 conditions · 16 needing a document upload
The Tenderer shall submit self attested copy of Bank details of the firm in the format attached (as per Annexure-XII document section of of this tender. (NOTE: Please note that the bank detail of the firm submitted in the Annexure- XII shall be considered as valid bank account of the firm all transactions till the successful completion of work.)
The Tenderer shall submit self attested copy of the GSTIN certificate as issued against the firm by the Govt. authority mentioning GST No., Name of Firm and Address etc.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall submit along with the tender document, documents in support of his/their claim to fulfill the eligibility criteria as mentioned in the tender document. Each page of the copy of documents/certificates in support of credentials, submitted by the tenderer, shall be self-attested/digitally signed by the tenderer or authorized representative of the tendering firm. Self attestation shall include signature, stamp and date (on each page). Only those documents which are declared explicitly by the tenderer as "documents supporting the claim of qualifying the laid down eligibility criteria", will be considered for evaluating his/their tender.
The entire work is required to be completed in all respect within 04 months from the date of issue of Work Order. Time is the essence of this contract. The contractor will be required to maintain steady and regular progress to the satisfaction of the Engineer to ensure that the work is completed within the stipulated time, failing which action may be taken by CRIS in terms of clause in Railway Standard GCC-2022.
Water Charges:- In case of contractor using Railway's water sources, water charges will be deducted @ 1% of the cost of the items(s) where water is being consumed.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority. If any Tax/Royalty/Octori is quoted extra, the same will neither be considered for evaluation of the tender nor will be paid. However any changes in rate of taxes or any new tax /cess on Works Contract will be dealt according to clause 37 of IRGCC-2022 (Works Matter).
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, availability of labour etc. that may be encountered in course of execution of work.
Tenderer should see the website for the corrigendum/addendum to the NIT/tender document, if any that may be uploaded prior to tender opening (inclusive) as there will not be any separate communication for that.
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening. IRGCC-2022 (works matter) is for reference only. Any correction issued by competent authority up to date of opening will be applicable. Tenderer should quote accordingly.
The quantities shown in the attached Schedule are given as a guide and are approximate only and are as a guide to give the tenderer(s) an idea of quantum of work involved. Quantities are subject to variation according to the needs of the Railway. The Railway does not guarantee work under each item of the Schedule. The Railway reserves the right to increase/ decrease and/or delete or include any of the quantities given above and no extra rate will be allowed on this account.
The tenderer has to submit necessary documents in compliance of clause 10 to 18 (Part-I) of IRGCC 2022 (Works matter) mandatorily, otherwise offer will be considered as Incomplete Offer and accordingly shall not be considered.
Security Deposit :-
i. Security deposit shall be deducted from the bills as per Northern railway Standard Tender Document 2022, however the EMD deposited along with the tender document shall be retained as security deposit.
ii The security deposit & PG shall be returned after six months of completion of the entire work and on the certification of the Engineer that work has been completed in all respect and found satisfactory.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person to the official nominated (i.e OS/Tenders/GS/SC Division) as indicated in the tender document Before closing date for submission of bids. (i.e. excluding the last date of submission of Bids).
All the instructions furnished in the Technical Compliance / Commercial Compliance / Custom / Undertakings / General instructions are only indicative and not exhaustive. The tenderer shall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
GSU/SC : (i) SC Divn : KZJ-BPQ : Electrical Power supply arrangements including provision of temporary supply for diverted LC gate, Shifting /Modification of existing power line crossings in connection with Proposed construction of 2 lane Road Over Bridge in lieu of LC No.12 at km 344/18-20 between Hasanparthi Road - Uppal stations. (ii) SC Divn : KZJ-BPQ : Electrical Power supply arrangements including provision of temporary supply for diverted LC gate, Shifting /Modification of existing power line crossings in connection with Proposed construction of 2-lane Road Over Bridge in lieu of LC No.27 at km: 317/4-6 between Bisugir Sheriff - Potkapalli stations.
C-E-GS-SC-6-OT-2025-26~SCR
C-E-GS-SC-6-OT-2025-26
Open
Works - General
6 Months
Hyderabad, Telangana
₹0
₹75,800
13 Apr 2026
20 Mar 2026
30 Mar 2026
369 items across 4 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 10,12,868.14 | ||
| — | 3.00 | — | — | ||
| Concrete for foundations and plinth in other than hard soil and rock | — | — | — | 12,009 | |
| — | 50.00 | — | — | ||
| Supply of 25mm PVC rigid conduit pipes of 2mm thickness as per BIS-9537 (latest) along with accessories. | — | — | — | 1,300 | |
| — | 50.00 | — | — | ||
| Erection of 25mm PVC rigid conduit pipes of 2mm thickness as per BIS-9537 (latest) along with accessories. | — | — | — | 150 | |
| — | 100.00 | — | — | ||
| Supply of 32mm PVC rigid conduit pipes of 2mm thickness as per BIS-9537 (latest) along with accessories. | — | — | — | 3,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .