Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Fee/PreQual/Technical/Finance RAIGANJ UTTAR DINAJPUR | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | +0.00% | ₹1.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 L+₹3,656.46 (2.00%)Admitted-Fee/PreQual/Technical/Finance 00 BALITIKURI BALITIKURI NASKARPARA HOWRAH WEST BENGAL 711113 | HOWRAH | WEST BENGAL | 711113 | +2.00% | ₹1.9 L+₹3,656.46 (2.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.9 L+₹7,312.91 (4.00%)Admitted-Fee/PreQual/Technical/Finance BALAJPUR MORE BALIAPUR PO LALGANJ 713359 WEST BENGAL INDIA | BALIAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | +4.00% | ₹1.9 L+₹7,312.91 (4.00%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
7 Aug 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Face Lifting beatifications and other miscellaneous work at yoga centre.
2026_ECL_362681_1
ECL/GM/BA/E TENDER/26-27/Civil/012 Dt 28.07.2026
Open Tender
Civil Works - Others
Percentage
15 days
Bankola Area
Please refer to NIT document
3 documents required · 3 mandatory
₹2,300
10 Aug 2026
28 Jul 2026
8 Aug 2026
28 Jul 2026
7 Aug 2026
28 Jul 2026
28 Jul 2026 - 1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hydraulic Excavator (3D) with driver and fuel | 3 | day | 8,050 | ₹24,150 |
| 2 | Tractor with trolley | 3 | day | 1,391.5 | ₹4,174.5 |
| 3 | White washing with lime to give an even shade : New work (three or more coats) | 162 | hour | 16.4 | ₹2,656.8 |
| 4 | Engagement of labour for misc. purpose | 40 | cum | 600 | ₹24,000 |
| 5 | Supplying and stacking at site. Moorum | 30 | cum | 549.4 | ₹16,482 |
| 6 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in cement mortar 1:4 (1 cement : 4 coarse sand) | 2.4 | sqm | 721.9 | ₹1,732.56 |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1.6 | cum | 1,061.6 | ₹1,698.56 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.81 | cum | 6,007.2 | ₹4,865.83 |
| 9 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 1,200 | sqm | 20.95 | ₹25,140 |
| 10 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. complete as per the direction of Engineer-in-charge. | 20 | sqm | 788.05 | ₹15,761 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 1.04 MB
BOQ_375587.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .