Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.6 LAccepted-AOC L 87 STREET NO 7C MAHIPALPUR EXTENSION NEW DELHI 110037 | NEW DELHI | NEW DELHI | DELHI | 110037 | L1 | Accepted-AOC Awarded Being L1 | |
| 2 | L2₹48.9 L+₹1.8 L (3.89%)Rejected-Finance | L2 | Rejected-Finance Rejected Being other than L1 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
10 Apr 2025, 6:00 pmClosed
GE I CG RATNAGIRI
Military Engineer Service Garrison Engineer I CG Ratnagiri SLUY Shed Plot, W19 23 MIDC Mirjole Ratnagiri 415 639
COMPREHENSIVE MAINTENANCE OF RUNWAY LIGHTS, CCR, UPS AND CONNECTED ACCESSORIES AT ICGAS RATNAGIRI
2025_MES_697674_2
8242/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
RATNAGIRI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE I CG RATNAGIRI
₹98,000
Yes
10 Jun 2025
22 Mar 2025
12 Apr 2025
22 Mar 2025
10 Apr 2025
23 Mar 2025
Amount
Material & Labour for daily maintenance of runway lights with the following checks complete all as specified and as directed. (a) Check for unserviceable lamps (b) Check for dim Lights (c) Check for broken Lens, (d) checking of CCR Operation. The details of Light fittings as under. (i) Runway Edge Light clear filter -17 Nos (ii)Runway Edge light clear filter Amber-40 Nos (iii) Runway inset middle marker 10 Nos (iv) Threshold inset Light 12 Nos, (v) Threshold identification Light -04 Nos, (vi) ORA Light 8 Nos, (vii) Runway End Light 12 Nos,
(viii) Turning pad Lights -20 Nos, (ix) Taxiway lights 14 Nos, (x) PAPI lights 8 Nos, (xi) Guidance Sign Boards -05 Nos, (xii) H-Landing Lights -01 No, (xiii) CCR 20KVA - 4 Nos, (xiv) CCR 5KVA - 1Nos, (xv) CCR 4KVA - 03Nos Notes: - (a)The required item for replacement shall be taken under respective items below. (b) contractor should employ qualified Technician for liaison with user and daily Report to be signed from user and submit to Engineer-in-Charge.
Material & Labour for weekly maintenance of runway lights with the following checks complete all as specified and as directed. (a) Check for vegetation (b) Check for dirty lens (c) Check for broken Lens The details of Light fittings as under. (i) Runway Edge Light clear filter -17 Nos (ii)Runway Edge light clear filter Amber-40 Nos (iii) Runway inset middle marker 10 Nos (iv) Threshold inset Light 12 Nos, (v) Threshold identification Light -04 Nos, (vi) ORA Light 8 Nos, (vii) Runway End Light 12 Nos,
(viii) Turning pad Lights -20 Nos, (ix) Taxiway lights 14 Nos, (x) PAPI lights 8 Nos, (xi) Guidance Sign Boards -05 Nos, (xii) H-Landing Lights -01 No Notes: - (a)The required item for replacement shall be taken under respective items below. (b) contractor should employ qualified Technician for liaison with user and daily Report to be signed from user and submit to Engineer-in-Charge.
Material & Labour for half yearly maintenance of runway lights with the following checks complete all as specified and as directed. (a) Check for improper ground elevation (b) check for improper light elevation. (c) Check for moisture present in CI Box The details of Light fittings as under (i) Runway Edge Light clear filter -17 Nos (ii) Runway Edge light clear filter Amber-40 Nos (iii) Runway inset middle marker- 10 Nos (iv) Threshold inset Light 12 Nos, (v) Threshold identification Light -04 Nos,
(vi) ORA Light- 8 Nos, (vii) Runway End Light 12 Nos, (viii) Turning pad Lights -20 Nos, (ix) Taxiway lights 14 Nos, (x) PAPI lights 8 Nos (xi) Guidance Sign Boards -05 Nos. (xii) H-Landing Lights -01 No. Notes: - (a)The required item for replacement shall be taken under respective items below. (b) contractor should employ qualified Technician for liaison with user and daily Report to be signed from user and submit to Engineer-in-Charge.
Material & Labour for yearly maintenance of runway lights with the following checks complete all as specified and as directed. (a) Check for Lens cracks, corrosion and Driver PCB (b) Check for dirty contacts. (c) Check for loose wire contact The details of Light fittings as under. (i) Runway Edge Light clear filter -17 Nos (ii)Runway Edge light clear filter Amber-40 Nos (iii) Runway inset middle marker 10 Nos (iv) Threshold inset Light 12 Nos,
(v) Threshold identification Light -04 Nos, (vi) ORA Light 8 Nos, (vii) Runway End Light 12 Nos, (viii) Turning pad Lights -20 Nos, (ix) Taxiway lights 14 Nos, (x) PAPI lights 8 Nos, (xi) Guidance Sign Boards -05 Nos (xii) H-Landing Lights -01 No Notes: - (a)The required item for replacement shall be taken under respective items below. (b) contractor should employ qualified Technician for liaison with user and daily Report to be signed from user and submit to Engineer-in-Charge.
Supply, Installation, Testing and Commissioning in replacement of Bi-directional elevated type-high intensity runway edge light fitting suitable for use with 200 watts, 6.6Amps, bi-pin halogen lamp complete with all accessories including lamp, lenses, With Clear Filter (including halfway Marking) and CI Base plate complete.
Supply, Installation, Testing and Commissioning in replacement of Bi-directional elevated type-high intensity runway edge light fitting suitable for use with 200 watts, 6.6Amps, bi-pin halogen lamp complete with all accessories including lamp, lenses, With Clear/Yellow Filter and CI Base plate complete.
Supply, Installation, Testing and Commissioning in replacement of Bi-directional elevated type-high intensity runway edge light fitting suitable for use with 200 watts, 6.6Amps, bi-pin halogen lamp complete with all accessories including lamp, lenses, With Yellow/ Blank Filter and CI Base plate complete.
Supply, install, Testing and Commissioning in replacement of medium intensity elevated type omni directional turning pad edge light fitting suitable for use with 15Watt, 6.6Amps complete with all accessories including 133 mm smooth blue lens, blue LED and CI base plate complete all as specified and as directed.
Supply, install, Testing and Commissioning in replacement of medium intensity elevated type omni directional taxi way edge light complete all as specified and as directed
Supply, install, Testing and Commissioning in replacement Uni-directional elevated type-high intensity Runway End light fittings suitable for use with 200 Watt, 6.6 Amps, halogen lamp, complete with all accessories including Red Spreader lens, lamp, and CI Base plate complete all as specified and as directed.
Supply, install, Test and Commissioning in replacement of Uni-directional elevated type-high intensity Runway End light Red Spreader lens complete all as specified and as directed.
Supply, install, Test and Commissioning in replacement of Isolating Transformer 200 Watt, 6.6Amps and confirming to IS 12290 - 1987 complete all as specified and as directed.
Supply, install, Test and Commissioning in replacement of Isolating Transformer (TP-20 + TW-14) and confirming to IS 12290 - 1987 complete all as specified and as directed.
Supply, install, Test and Commissioning in replacement of Primary cable 1C X 6 Sqmm copper conductor XLPE insulated PVC sheathed 5 KV grade cable complete all as specified and as directed.
Material & Labour for Primary cable Insulation Meggering all runway circuit all as directed by Engineer In Cahrge.
Testing and Commissioning and Calibration Precision approach path indicator (PAPI) unit complete all as directed by Engineer In Charge.
Supply and fixing in replacement of reflector for AMA Make APN type Approach fitting complete all as directed by Engineer In Charge.
Supply and fixing in replacement of reflector for AMA Make PAPI Fitting complete all as directed by Engineer In Charge.
Supply, install, Test and Commissioning in replacement of Lamp and outer filter for “H” landing direction indicator
Supply, install, testing in replacement of 105-Watt Reflector type Halogen Lamps for Inset fitting.
Supply install and testing in replacement of 200-Watt bi-pin Halogen Lamp.
Supply install, testing bipin halogen Lamp 15-Watt for taxi way lights and turning pad lights.
Supply install, testing in replacement of Isolating Transformer 15 Watt/6.6Amps.
Supply install, testing in replacement of connecter kit (male/ female) for 1C X 6 Sqmm cable.
Supply install, testing in replacement of connecter kit (male/ female) for secondary cable 2 core X 4 Sqmm cable
Supply install, testing in replacement of 180-degree Clear Filter.
Supply and fixing in replacement of Lens Gaskets suitable for existing runway lights.
Supply and fixing in replacement of base plate Gaskets suitable for existing runway lights.
Supply and fixing in replacement of breakable coupling suitable for existing runway lights.
Supply and fixing in replacement of M10 SS bolts, nut washers etc.
Comprehensive maintenance of 30 KVA UPS three phase AC input 300 to 450 Volt including opening and cleaning, checking of all components, and refixing the same after carrying out necessary maintenance complete all as directed by Engineer In charge.
Supply & Replacement of 30 Ah, UPS Batteries with maintenance free lithium battery LiFePO4, 30 minutes backup complete. (Note:-30 Batteries shall be considered as Each Set).
Excavation in trenches for laying of cables, poles and stay not exceeding 1.5 metre wide and not exceeding 1.50 metre deep and getting out in Hard dense soil complete all as specified and directed.
Returning & filling including spreading and levelling, watering and well ramming in layers in hard dense not exceeding 25cm complete all as specified and directed.
Removing excavated materials not exceeding 50 Metre and depositing where directed at a level not exceeding 1.5 metre above the starting point.
Taking down Underground cable of size 3.5 core 70Sqmm from trenches, floor etc and kept safe side of existing location for relaying/ Replacement, the cable shall be taken down from the trenches excavated for laying of cables complete.
Ditto all as per Item No. 36, but for 3.5 core, 35 Sqmm.
Supply & laying in replacement of HDPE Pipe pressure rating 6 kg/cm2 of size 50 mm dia for protection of underground cables complete all as directed by Engineer-in- Charge.
Cutting of hardstanding/ Road for laying of pipe line/cable and making good surfaces after laying of pipe line/ cable up to 60cm in depth complete all as directed by Engineer-in- Charge.
Supply & Fix 3.5 core, 70 Sqmm XLPE insulated armoured and PVC sheathed heavy duty electric cable with aluminium conductor 1100-volt grade laid in tranches passing through pipes /ducts with and including cable gland, cable lugs & testing complete all as specified
Ditto all as per Item No. 40, but for 3.5 core, 35 Sqmm.
Testing of all Chemical Earthing pits (22 Nos) including earth wire from CCR to airfield lighting system including cleaning of debris, checking of all earth strip connection and submit the test report per month basis up to completion of the work. Note: - if any major defect been observed at the time of testing new earthing item should be paid separately under relevant item.
Supply and laying in replacement of GI Wire 4.0mm dia for continuous earthing for primary cables of Runway complete all as directed
Supply & Fix Straight through cable joining kit 1100 KV Grade 25-50 Sqmm
Supply & Fix Straight through cable joining kit 1100 KV Grade 70-120 Sqmm
Supply and installation & testing of fast earth electrode maintenance free chemical earthing of Dual pipe technology of 3 metre long with outer pipe diameter of 88 mm & inner pipe diameter 48 mm, the pipes are properly galvanized for 80-120 micron and wall thickness of inner pipe 3mm and 2 mm of outer pipe. There should be terminal for connection of 75X6 mm with two holes of 14 mm diameter. FAST ELECTRODE is dully fitted with the highly conductive material with sealing at both ends with lead terminals of 75X6 mm at top. Along with 2 bags of 2 Kgs each of earth Enhancing Compound including taking down old unserviceable earthing material complete all as specified and as directed NOTES: - (i) The chemical compound should be tested and certified by any international accredited laboratory. The testing laboratory should be ISO 9001 &iso 14001 Certified. (ii) The enhancing compound should be tested referring to protocol IS 1350 &IEC62321/111/54/CDV. The PH value of compound should be between 7 to 8. (iii) The content of mercury (Hg) & Hexa-chromium should be below detection level. (iv) The electrode should be tested for salt spray test as per BIS 117-09 for corrosion for minimum 500 Hours. (v) The FAST ELECTRODE shall be duly tested & certified by CPRI (Central power Research Institute), Govt of India for a minimum short circuit current of 42 K Arms for 1 second with initial pick of 88.2 KA.
Supply & Fixing of cable route indicators made out of MS sheet of size 45 cm x 30 cm of 2 mm thick with writing HT cable with MS angle frame and two Nos legs of 1.2 metre long of size 25x25x5 mm fixed on ground in PCC 1:2:4 type B1 (using 20 mm graded stone aggregate) platform of size 15x15x15 cm complete all as specified and directed.
Supply, laying Testing and commissioning of Power cable 3CX10 Sqmm aluminium conductor XLPE insulated PVC insulated armoured and PVC sheathed 1.1 KV grade cable including taking out unserviceable cable complete all as specified and directed.
Supply & Laying PVC insulated power cable 4 Sqmm x 2 core copper conductor PCP insulated 1.1 KV grade (for runway light connections (secondary cable)) including taking out old unserviceable cable complete all as specified and directed.
Credit Amount shall be deducted to arrive the Contract Sum.
M/S Chadha Brothers (BID ID -3273253)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .