Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹216 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹235.2 Cr+₹19.2 Cr (8.88%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹245 Cr+₹29 Cr (13.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹268.7 Cr+₹52.7 Cr (24.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹316 Cr+₹100 Cr (46.3%)Admitted-Finance 9 PPCL COLONY UDAY VIHAR HARIDWAR BYPASS DEHRADUN UTTARAKHAND | DEHRADUN | DEHRADUN | UTTARAKHAND | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Prasad and Company Project Works Limited L2 | Vallabhaneni Constructions Private Limited L6 | Sri Babul Nath L4 | AARPEE INFRAPROJECTS PRIVATE LIMITED L3 | Brand Eagles L1 | Bharat Constructions (India) Pvt. Ltd. L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I) | 1 | LS | 2,35,17,99,999 ₹2,35,17,99,999 | 3,41,92,00,000 ₹3,41,92,00,000 | 2,68,68,99,600 ₹2,68,68,99,600 | 2,45,00,00,000 ₹2,45,00,00,000 | 2,16,00,00,000 ₹2,16,00,00,000 Lowest | 3,16,00,00,000 ₹3,16,00,00,000 |
Tender Value
Refer Docs
EMD Value
₹2.3 Cr
Closing Date
12 Jun 2023, 3:00 pmClosed
AK Jha
NHIDCL HQ, New Delhi
Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) in the state of Nagaland on EPC Mode (Package I) 4th call
2023_NHIDC_749348_1
NHIDCL/Nagaland/Civil Work/ Kohima Bypass/Pkg 1
Open Tender
Civil Works
EPC Contract
730 days
Nagaland
Please refer Tender documents.
5 documents required · 5 mandatory
₹35,400
MD NHIDCL
₹2.3 Cr
NHIDCL HQ, New Delhi
28 Aug 2023
17 Apr 2023
13 Jun 2023
17 Apr 2023
12 Jun 2023
24 May 2023
17 Apr 2023 - 24 Apr 2023
25 Apr 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I) | - | LS | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_787850.xls
BOQ Document • 0.25 MB
119137014.pdf
Tender Document • 0.25 MB
RFP-1.pdf
Tender Document • 2.41 MB
DCA.pdf
Tender Document • 2.17 MB
Schedule.pdf
Tender Document • 2.85 MB
Drawings.pdf
Tender Document • 6.99 MB
GADofViaduct.rar
Tender Document • 6.12 MB
119137016.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .