Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC D 154 ADARSH NAGAR NARMADA ROAD JABALPUR MP 482001 | JABALPUR | MADHYA PRADESH | 482001 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹19.9 L+₹19,831.20 (1.00%)Rejected-Finance | L2 | Rejected-Finance Not being lowest | |
| 3 | L3₹20.0 L+₹22,584.80 (1.14%)Rejected-Finance | L3 | Rejected-Finance Not being lowest | |
| 4 | L4₹20.0 L+₹25,453.20 (1.29%)Rejected-Finance 114 BARH CHONDI TOWN BARH DISTT PATNA BIHAR PIN 803213 | PATNA | BIHAR | 803213 | L4 | Rejected-Finance Not being lowest | |
| 5 | L5₹20.4 L+₹61,988.60 (3.14%)Rejected-Finance 114 BARH CHONDI BARH PATNA BIHAR 803213 | PATNA | PATNA | BIHAR | 803213 | L5 | Rejected-Finance Not being lowest |
| Sl No | Description | Qty | Unit | M/S BHARTI ENTERPRISES L3 | SR ASSOCIATES L2 | RAM ASSOCIATES L1 | ANAMIKA CONSTRUCTION L6 | LAL SINGH & SONS L7 | MAA SHARDA CONSTRUCTION L5 | SHRI KRISHNA CONSTRUCTIONS L8 | a k builders L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n.exc 30 cm deep and averaging 15 cm deep and getting out in Hard / denses soil complete all as specified and directed. | 50 | Sqm | 50 ₹2,500 | 70 ₹3,500 | 30 ₹1,500 | 35 ₹1,750 | 20 ₹1,000 Lowest | 50 ₹2,500 | 50 ₹2,500 | 30 ₹1,500 |
| 2.00 | Excavating over areas n.exc 1.5 m deep and getting out soft/ disintegrated rock complete all as specified and directed. | 18 | Cum | 550 ₹9,900 | 100 ₹1,800 | 250 ₹4,500 | 150 ₹2,700 | 250 ₹4,500 | 150 ₹2,700 | 50 ₹900 Lowest | 250 ₹4,500 |
| 3.00 | Excavating over areas exc 1.5 m deep but n.exc 3.00 m deep and getting out soft/disintegrated rock complete all as specified and directed. | 18 | Cum | 650 ₹11,700 | 100 ₹1,800 | 250 ₹4,500 | 180 ₹3,240 | 300 ₹5,400 | 225 ₹4,050 | 50 ₹900 Lowest | 350 ₹6,300 |
| 4.00 | Excavating in trenches n.exc 1.5 m wide and n.exc 1.5 m in depth for foundation, etc or for shafts, wells, cesspits, manholes, pier holes, laying cables, poles and stay etc n.exc 10 sqm on plan and n.exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | 8.1 | Cum | 300 ₹2,430 | 100 ₹810 | 250 ₹2,025 | 150 ₹1,215 | 250 ₹2,025 | 175 ₹1,417.5 | 50 ₹405 Lowest | 250 ₹2,025 |
| 5.00 | Excavation in trenches n.exc 1.5 m wide and n.xc 1.5 m depth for foundation etc n.exc 10 sqm on plan and getting out in hard/dense soil complete all as specified and directed. | 43 | Cum | 350 ₹15,050 | 100 ₹4,300 | 250 ₹10,750 | 150 ₹6,450 | 300 ₹12,900 | 190 ₹8,170 | 50 ₹2,150 Lowest | 350 ₹15,050 |
| 6.00 | Returning, filling in, including spreading levelling watering and well ramming in layers n.exc 25cm as in hard/dense soil complete all as specified and directed. | 22 | Cum | 50 ₹1,100 | 20 ₹440 Lowest | 50 ₹1,100 | 45 ₹990 | 30 ₹660 | 75 ₹1,650 | 50 ₹1,100 | 70 ₹1,540 |
| 7.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed. | 8.86 | Cum | 50 ₹443 | 20 ₹177.2 Lowest | 50 ₹443 | 45 ₹398.7 | 30 ₹265.8 | 75 ₹664.5 | 50 ₹443 | 70 ₹620.2 |
| 8.00 | Removing excavated material to a distance n.exc 50 mtr and depositing where directed at a level n.exc 1.50 mtr above the starting point complete all as specified and directed. | 43.24 | Cum | 70 ₹3,026.8 | 100 ₹4,324 | 50 ₹2,162 | 45 ₹1,945.8 Lowest | 100 ₹4,324 | 90 ₹3,891.6 | 50 ₹2,162 | 100 ₹4,324 |
| 9.00 | Removing excavated material to a distance exc 1.5 KM but n.exc 5 KM and depositing where directed at a level n.exc 1.50 mtr above the starting point complete all as specified and directed. | 7.5 | Cum | 150 ₹1,125 | 110 ₹825 | 50 ₹375 | 45 ₹337.5 Lowest | 300 ₹2,250 | 200 ₹1,500 | 50 ₹375 | 120 ₹900 |
| 10.00 | Removing excavated material exc 250 m but n.exc 500 m and depositing where directed in hard/dense soil complete all as specified and directed. | 13 | Cum | 90 ₹1,170 | 110 ₹1,430 | 50 ₹650 | 45 ₹585 Lowest | 200 ₹2,600 | 165 ₹2,145 | 50 ₹650 | 150 ₹1,950 |
Tender Value
₹23.7 L
EMD Value
₹47,400
Closing Date
8 Jun 2026, 6:00 pmClosed
GE (E) JABALPUR
GE (E) JABALPUR-4820111
PROVN OF 01 X STORE ROOM AT POLO GROUND AT MCMM AND PROVN OF SEPTIC TANK BEHIND BLDG NO P-60 AT MANDIR LINE OF MCMM JABALPUR
2026_MES_766006_1
8866/E8
Open Tender
Civil Works
Item Rate
240 days
GE (EAST) JABALPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (EAST) JABALPUR
₹47,400
Yes
1 Aug 2026
18 May 2026
13 Jun 2026
18 May 2026
8 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Surface excavation n.exc 30 cm deep and averaging 15 cm deep and getting out soft/loose soil complete all as specified and directed. | |||||
| 2 | Excavating over areas n.exc 1.5 m deep and getting out soft/ disintegrated rock complete all as specified and directed. | - | Cum | 100 | - |
| 3 | Excavating over areas exc 1.5 m deep but n.exc 3.00 m deep and getting out soft/disintegrated rock complete all as specified and directed. | - | Cum | 53 | - |
| 4 | Excavating in trenches n.exc 1.5 m wide and n.exc 1.5 m in depth for foundation, etc or for shafts, wells, cesspits, manholes, pier holes, laying cables, poles and stay etc n.exc 10 sqm on plan and n.exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | 1 | Cum | 10 | ₹9.99 |
| 5 | Excavation in trenches n.exc 1.5 m wide and n.xc 1.5 m depth for foundation etc n.exc 10 sqm on plan and getting out in hard/dense soil complete all as specified and directed. | - | Cum | 11 | - |
| 6 | Returning, filling in, including spreading levelling watering and well ramming in layers n.exc 25cm as in hard/dense soil complete all as specified and directed. | - | Cum | 10 | - |
| 7 | Returning, filling in, including spreading, levelling, watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed. | 1 | Cum | 22 | ₹21.98 |
| 8Removing excavated material to a distance n.exc 50 mtr and depositing where directed at a level n.exc 1.50 mtr above the starting point complete all as specified and directed. | |||||
| 9Removing excavated material to a distance exc 1.5 KM but n.exc 5 KM and depositing where directed at a level n.exc 1.50 mtr above the starting point complete all as specified and directed. | |||||
| 10 | Removing excavated material exc 250 m but n.exc 500 m and depositing where directed in hard/dense soil complete all as specified and directed. | - | Cum | 100 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TENDER8866.pdf
Tender Documents • 1.42 MB
BOQ_857889.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .