| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance AFGHAN ROAD OBC BANK HOSHIARPUR | HOSHIARPUR | HOSHIARPUR | PUNJAB | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.6 L+₹15,101.83 (3.37%)Admitted-Finance SHOP NO 06 DEPUR MOHALLA GOENWAL TALWARA HOSHIARPUR PUNJAB | HOSHIARPUR | HOSHIARPUR | PUNJAB | 144222 | ₹4.6 L+₹15,101.83 (3.37%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | navendu and company L1 | SOHAN SINGH & COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Dressing bed and preperation of sub grade for lining | 900 | Sqm | 15 ₹13,500 Lowest | 17 ₹15,300 |
| 2.00 | Dressing side slopes and preparation of subgrade for lining | 641.78 | Sqm | 25 ₹16,044.5 Lowest | 26 ₹16,686.28 |
| 3.00 | Labour for Stone or kankar block pitching on slopes of guide bandh and protection works | 86.4 | Cum | 800 ₹69,120 Lowest | 820 ₹70,848 |
| 4.00 | Grouting stone filling or pitching With mortar. | 691.2 | Sqm | 200 ₹1,38,240 Lowest | 208 ₹1,43,769.6 |
| 5.00 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 3.38 | Cum | 6,400 ₹21,632 Lowest | 6,700 ₹22,646 |
| 6.00 | Dismentlingstonepitchingor soilingstonepitchinggrouted with dry ballast and with natural silt and clay | 60.48 | Cum | 425 ₹25,704 Lowest | 432 ₹26,127.36 |
| 7.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with excavated surplus soil. In Ordinary soil (B) Mechanical (b) Depth 3 m to 6 m | 953.03 | Cum | 97 ₹92,443.91 Lowest | 100 ₹95,303 |
| 8.00 | Cement concrete 1:3:6 (a) with stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type | 4.32 | Cum | 4,200 ₹18,144 Lowest | 4,280 ₹18,489.6 |
| 9.00 | Supply of boulders Stone as per departmental Specification with weight 18 to 40 kg and boulder stone with weight upto 18kg not exceeding 10% of total quantity including digging, collection, all taxes, loading, unloading, stacking with carriage of material | 38.02 | Cum | 1,400 ₹53,228 Lowest | 1,420 ₹53,988.4 |
| 10.00Any Other Item (CSR + SP) | |||||
Tender Value
₹4.3 L
EMD Value
₹8,511
Closing Date
2 Jul 2026, 10:00 amClosed
EXECUTIVE ENGINEER KANDI CANAL 3 DIVISION
EXECUTIVE ENGINEER KANDI CANAL 3 WRD PUNJAB HOSHIARPUR
ESTIMATE FOR REPAIR RESTORATION OF DAMAGED STONE PITCHING AT JAHANKHELAN KANGAR POND OF KANDI CANAL STAGE 2
2026_WR_170641_1
18/2026-27
Open Tender
Civil Works
Item Rate
30 days
HOSHIARPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹8,511
Yes
10 Jul 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dressing bed and preperation of sub grade for lining | 900 | Sqm | 10 | ₹9,000 |
| 2 | Dressing side slopes and preparation of subgrade for lining | 641.78 | Sqm | 10 | ₹6,417.8 |
| 3 | Labour for Stone or kankar block pitching on slopes of guide bandh and protection works | 86.4 | Cum | 10 | ₹864 |
| 4 | Grouting stone filling or pitching With mortar. | 691.2 | Sqm | 10 | ₹6,912 |
| 5 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 3.38 | Cum | 10 | ₹33.8 |
| 6 | Dismentlingstonepitchingor soilingstonepitchinggrouted with dry ballast and with natural silt and clay | 60.48 | Cum | 10 | ₹604.8 |
| 7 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with excavated surplus soil. In Ordinary soil (B) Mechanical (b) Depth 3 m to 6 m | 953.03 | Cum | 10 | ₹9,530.3 |
| 8 | Cement concrete 1:3:6 (a) with stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type | 4.32 | Cum | 10 | ₹43.2 |
| 9 | Supply of boulders Stone as per departmental Specification with weight 18 to 40 kg and boulder stone with weight upto 18kg not exceeding 10% of total quantity including digging, collection, all taxes, loading, unloading, stacking with carriage of material | 38.02 | Cum | 10 | ₹380.2 |
| 10 | Any Other Item (CSR + SP) | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_347338.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .