Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹7.1 L (5.77%)Rejected-Finance | ₹1.3 Cr+₹7.1 L (5.77%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | A GANDHIKUMAR L1 | IVR & CO L2 |
|---|---|---|---|---|---|
| 1.00Part I - Strengthening to the Road From Paramakudi-Mudukulathur road to Nadukudiyiruppu (Kanthakulam Muniyasamy road), KM 0/0 - 2/690 (R-185), in Paramakudi Block. | |||||
| 2.00 | Clearing the Light Jungle with out uprooting including all labour charges | 1,075.82 | sqm | 5.34 ₹5,744.88 | 5 ₹5,379.1 Lowest |
| 3.00 | Picking 5cm to 10cm old matalled surface and sectioning - 1 sq.m | 3,348 | Sqm | 19.65 ₹65,788.2 Lowest | 20 ₹66,960 |
| 4.00 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete. | 1,275.65 | cum | 118 ₹1,50,526.7 | 100 ₹1,27,565 Lowest |
| 5.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 6.00 | Km 0/0-1/0 | 222.68 | cum | 536 ₹1,19,356.48 Lowest | 569 ₹1,26,704.92 |
| 7.00 | Km 1/0-2/0 | 222.39 | cum | 545 ₹1,21,202.55 Lowest | 579 ₹1,28,763.81 |
| 8.00 | Km 2/0 - 2/690 | 86.45 | cum | 554 ₹47,893.3 Lowest | 588 ₹50,832.6 |
| 9.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | |||||
| 10.00 | Km 0/0-2/690 | 1,497.54 | cum | 2,376 ₹35,58,155.04 Lowest | 2,520 ₹37,73,800.8 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
29 May 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
Ramanathapuram District - Paramakudi Block - 09/MGSMT/2025-26
2025_RDTN_556742_27
DIPR/1714/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per Tender Document
5 documents required · 5 mandatory
₹0
₹1.4 L
13 Aug 2025
13 May 2025
29 May 2025
13 May 2025
29 May 2025
13 May 2025
Amount
Part I - Strengthening to the Road From Paramakudi-Mudukulathur road to Nadukudiyiruppu (Kanthakulam Muniyasamy road), KM 0/0 - 2/690 (R-185), in Paramakudi Block.
Clearing the Light Jungle with out uprooting including all labour charges
Picking 5cm to 10cm old matalled surface and sectioning - 1 sq.m
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking eith hot applied thermoplastic compound with reflectiorising glass beads on bituminous surface
Providing and fixing of sign board for standard specification
Hecta metre stone
KM Stone
Rcc Slab Culvert at 6.00m span 720m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Supplying and filling in foundation and basement with filling sand in layers not more 15cm thick well rammed watered and compacted. Complete complying to standard specification.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal in layers not more 15cm thick well rammed watered and compacted compacted completed complying to standard specification.
Cement Concrete 1:3:6mix using 40mm gauge hand broken granite stone jelly for foundation including watering whenever necessary and laid in layers not more than 15cm thick. Compacting etc.,
Cement Concrete 1:3:6mix using 40mm gauge hand broken granite stone jelly for foundation including watering whenever necessary and laid in layers not more than 15cm thick. Compacting etc.,
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost rein for cement and fabrication charges, centring and shuttering, shall be finished smooth with cement mortar 1:3,12mm thick.,etc
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost rein for cement and fabrication charges, centring and shuttering, shall be finished smooth with cement mortar 1:3,12mm thick.,etc
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Supply and Fixing of PVC or Compressible Fibre Board Expension Joints in between Deck Slab and Dird Wall including all labour charges etc complete..
kraft paper
Wheepholes
Rcc Slab Culvert at 1.50m span 1900m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Supplying and filling in foundation and basement with filling sand in layers not more 15cm thick well rammed watered and compacted. Complete complying to standard specification.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal in layers not more 15cm thick well rammed watered and compacted compacted completed complying to standard specification.
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Cement Concrete 1:3:6mix using 40mm gauge hand broken granite stone jelly for foundation including watering whenever necessary and laid in layers not more than 15cm thick. Compacting etc.,
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost rein for cement and fabrication charges, centring and shuttering, shall be finished smooth with cement mortar 1:3,12mm thick.,etc
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen Pad
Provision for kraft paper
Provision for Abutment PVC Seepage Pipes
Pipe culvert ch2200m
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Filling with M.sand including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Cost and supply of 900mm R.C.C. NP3 pipes including etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
IVR & CO (BID ID -1341081)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .