Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -35.51% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹42,923.88 (27.4%)Admitted-Finance | -17.85% | ₹2.0 L+₹42,923.88 (27.4%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 L+₹74,156.72 (47.3%)Admitted-Finance | -5.00% | ₹2.3 L+₹74,156.72 (47.3%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 L+₹79,017.86 (50.4%)Admitted-Finance | -3.00% | ₹2.4 L+₹79,017.86 (50.4%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 L+₹86,309.58 (55.1%)Admitted-Finance | +0.00% | ₹2.4 L+₹86,309.58 (55.1%) | L5 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,860
Closing Date
18 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Protection work near the h/0 Qaramat Ali w no.5 pyt Keran Block BHALWAL AC Jammu North under CDF (2Nd call)
2026_RDPR_319097_6
e-NIT No. 363 REW J of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹4,860
16 Sept 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for prepration of site | 2 | cum | 553 | ₹1,106 |
| 2 | Earthwork in excavation by manual means in trenches and foundation in drains etc | 20.39 | cum | 256.85 | ₹5,237.17 |
| 3 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level 1:5:10 (1 Cement:5 coarse sand:10 Graded stone aggregate 40mm nominal size) | 1.02 | cum | 4,826.5 | ₹4,923.03 |
| 4 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 34.66 | cum | 5,733.6 | ₹1,98,726.58 |
| 5 | Centering and shuttering including strutting,propping etc and removal of form | 66.91 | sqm | 286.35 | ₹19,159.68 |
| 6 | supply of stone | 6 | cum | 700 | ₹4,200 |
| 7 | Carriage of sand and Agg by avg 10Km MT lead | 18.16 | cum | 279 | ₹5,066.64 |
| 8 | carriage of stone lead upto 7km av. | 6 | cum | 273 | ₹1,638 |
| 9 | Providing and fixing Display board only painting and writing . | 1 | no | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1055437.xls
BOQ • 0.26 MB
363.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .