| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC PLACEMENT OF WORK ORDER TO SUBSEQUENT L 1 BIDDER WITH APPROVAL OF GM KHADIA | |
| 2 | Rejected-Technical BAJRANG COMPLEX JAYANT P O JAYANT DISTT SINGRAULI M P PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | - | Rejected-Technical NOT L1 BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT L1 BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT L1 BIDDER | |
| 5 | Rejected-Technical BHAGAT SINGH COLONY WARD NO 9 MORWA SINGRAULI DIST SINGRAULI M P 486889 | SINGRAULI | SINGRAULI | M P | 486889 | - | Rejected-Technical NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | UMESH ENTERPRISES L1 | D L Enterprises L2 | NIRBHAY SALES AND SUPPLY AGENCY L5 | M/S R.K. ENTERPRISES L4 | M M GLASS & SONS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc.: For Fabrication of inner portion of operator cabin of 02 nos. IDM-70E Drill (Sr-07,15) & 03 nos. REL- 750E Drill (Sr. No.-9,11,14) in drill section at Khadia Project i) Cleaning of Operator Cabin. ii) Removing of old scrape materials of cabin. iii) Repairing/Fabrication of inner portion of operator cabin. iv) Fitting of heat insulation of roof & walls. v) Replacement of heavy duty door lock. vi) Fitting of sunmica with board ply, for ceiling door LHS & RHS , back wall etc. vii) Fitting of Rexine & floor mate, wooden & aluminium beat. For Repairing, reconditioning, wiring & light fitting of 02 nos. IDM-70E Drill (Sr-07,15) & 03 nos. REL- 750E Drill (Sr. No.-9,11,14) in drill section at Khadia Project i) Removing of Old wiring switch & load point ii) Layout of & fixing conduct iii) Layout of PVC wire from Jn to Load point iv) Fixing of switch & load point v) Connection of wire to switch point junction to point | ||||||||
| 2.00 | Labour Charges for cleaninig of oil, grease and rust of operator cabin including contractor's profit. . Note: Its includes a group of 01 no. Un-Skilled Manpower in 01 Shift per day for 01 job. | 5 | Job | 600 ₹3,000 | 578 ₹2,890 | 600 ₹3,000 | 300 ₹1,500 Lowest | 1,600 ₹8,000 |
| 3.00Material Charges for repairing/fabrication of inner portion of operator cabin. | ||||||||
| 3.01 | Cost of replacement of doorbeat 1" (25 rft). | 10 | Nos. | 150 ₹1,500 Lowest | 960 ₹9,600 | 1,100 ₹11,000 | 1,000 ₹10,000 | 1,500 ₹15,000 |
| 3.02 | Cost of replacement of door lock with handle (HD). | 10 | Nos. | 600 ₹6,000 | 565 ₹5,650 Lowest | 11,000 ₹1,10,000 | 800 ₹8,000 | 600 ₹6,000 |
| 3.03 | Cost of Screw, nut bolt with washer (1/2" x 2.5"). | 500 | Nos. | 15 ₹7,500 | 11.86 ₹5,930 | 31 ₹15,500 | 15 ₹7,500 | 6 ₹3,000 Lowest |
| 3.04 | Cost of fitting of heat insulation mat for roof, side wall, rear wall and door 1/2" thickness. | 875 | Sq. ft. | 80 ₹70,000 | 66.86 ₹58,502.5 | 96 ₹84,000 | 95 ₹83,125 | 61 ₹53,375 Lowest |
| 3.05 | Cost of fitting of sunmica with board ply for ceiling, door LHS RHS side wall and roof 6mm. | 875 | Sq. ft. | 70 ₹61,250 | 86.86 ₹76,002.5 | 125 ₹1,09,375 | 75 ₹65,625 | 61 ₹53,375 Lowest |
| 3.06 | Cost of fitting of floor Mat (1/2'' thick). | 225 | Sq. ft. | 90 ₹20,250 | 86.65 ₹19,496.25 | 125 ₹28,125 | 75 ₹16,875 Lowest | 100 ₹22,500 |
| 3.07 | Cost of fitting Rexine | 60 | mtr. | 250 ₹15,000 | 99.86 ₹5,991.6 Lowest | 350 ₹21,000 | 180 ₹10,800 | 100 ₹6,000 |
Tender Value
₹7.2 L
EMD Value
₹9,100
Closing Date
30 Jun 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR,SONEBHADRA,U.P-231222
Fabrication of inner portion of operator cabin with reconditioning/wiring and light fitting in 2 nos. of IDM 70 E Drills (SL No 07 and 15) and 03 no REL 750E Drills (SL No 09 and 11 and 14) deployed in drill section of Khadia Project
2025_NCL_337748_1
KHD/G.M. (Excv)/E-Tender/25-26/330
Open Tender
Excavation Department Work
Item Rate
40 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,100
20 Dec 2025
17 Jun 2025
1 Jul 2025
17 Jun 2025
30 Jun 2025
18 Jun 2025
17 Jun 2025 - 25 Jun 2025
Amount
Scope of Work/Technical Specifications etc.: For Fabrication of inner portion of operator cabin of 02 nos. IDM-70E Drill (Sr-07,15) & 03 nos. REL- 750E Drill (Sr. No.-9,11,14) in drill section at Khadia Project i) Cleaning of Operator Cabin. ii) Removing of old scrape materials of cabin. iii) Repairing/Fabrication of inner portion of operator cabin. iv) Fitting of heat insulation of roof & walls. v) Replacement of heavy duty door lock. vi) Fitting of sunmica with board ply, for ceiling door LHS & RHS , back wall etc. vii) Fitting of Rexine & floor mate, wooden & aluminium beat. For Repairing, reconditioning, wiring & light fitting of 02 nos. IDM-70E Drill (Sr-07,15) & 03 nos. REL- 750E Drill (Sr. No.-9,11,14) in drill section at Khadia Project i) Removing of Old wiring switch & load point ii) Layout of & fixing conduct iii) Layout of PVC wire from Jn to Load point iv) Fixing of switch & load point v) Connection of wire to switch point junction to point
Labour Charges for cleaninig of oil, grease and rust of operator cabin including contractor's profit. . Note: Its includes a group of 01 no. Un-Skilled Manpower in 01 Shift per day for 01 job.
Material Charges for repairing/fabrication of inner portion of operator cabin.
Cost of replacement of doorbeat 1" (25 rft).
Cost of replacement of door lock with handle (HD).
Cost of Screw, nut bolt with washer (1/2" x 2.5").
Cost of fitting of heat insulation mat for roof, side wall, rear wall and door 1/2" thickness.
Cost of fitting of sunmica with board ply for ceiling, door LHS RHS side wall and roof 6mm.
Cost of fitting of floor Mat (1/2'' thick).
Cost of fitting Rexine
Cost of Solution.
Cost of Wooden beat-1'' + Aluminium beat L Type.
Cost of Replacement of safety glass
Cost of rubber beat.
Labour Charges for repairing/fabrication of inner portion of operator cabin including contractor's profit. Note: Its includes a group of 01 no. Skilled Carpenter, 01 no. semi-skilled manpower and 01 no. Un-Skilled Manpower in 02 Shifts per day for 5 days for 01 job.
Material Charges for repairing/reconditioning of wiring of operator cabin
Cost of Conduct with casing 20mm (2mtr-1length).
Cost of Conduct with casing 25mm (2mtr-1length).
Cost of PL Lamp fitting (2 x 11 W).
Cost of Swicth board for light, fan, AC & Plug.
Cost of Power Point, Swich, Plug & Socket for Heater.
Cost of PVC Conduct Assessories Like Elbow, T-Bend.
Labour Charges for repairing/reconditioning of wiring of operator cabin including contractor's profit. Note: Its includes a group of 01 no. Skilled Electrician and 01 no. Un-Skilled Manpower in 02 Shifts per day for 3 days for 01 job.
Charges for Repairing/Denting & welding of operator cabin gate, side wall roof, floor mounting base. Note: i) Area for above work per job = 190 sq. ft. ii) Area for above work for 05 nos. job = 190 x 5 = 950sq. ft.
Charges for Painting of inner portion of operator cabin. .Note: i) Area for above work per job = 190 sq. ft. ii) Area for above work for 05 nos. job = 190 x 5 = 950sq. ft.
Total impact of GST for the purpose of CTC
D L Enterprises (BID ID -1163936)
M M GLASS & SONS (BID ID -1164386)
M/S R.K. ENTERPRISES (BID ID -1163096)
NIRBHAY SALES AND SUPPLY AGENCY (BID ID -1163094)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_350126.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .