Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC 2313 SF 262 7 PETROL BUNK BACKSIDE P N ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | L1 | Accepted-AOC Lowest rate quote | |
| 2 | L2₹13.4 L+₹600 (0.04%)Rejected-Finance | L2 | Rejected-Finance Highest Rate quote | |
| 3 | L3₹13.4 L+₹1,890 (0.14%)Rejected-Finance | L3 | Rejected-Finance Highest Rate quote | |
| 4 | L4₹13.7 L+₹27,400 (2.05%)Rejected-Finance | L4 | Rejected-Finance Highest Rate quote | |
| 5 | L5₹14.2 L+₹85,916.65 (6.42%)Rejected-Finance | L5 | Rejected-Finance Highest Rate quote |
| Sl No | Description | Qty | Unit | V.Chidambaram L4 | Vinoth L2 | PALRAJ .T L6 | GANGA CONSTRUCTIONS L5 | Ganesan L1 | M MAGESHWARI L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 100 | 1Cum(One Cubic Meter) | 110 ₹11,000 | 100 ₹10,000 | 98.23 ₹9,823 | 93.5 ₹9,350 | 100 ₹10,000 | 88 ₹8,800 Lowest |
| 2.00 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 15 | 1Cum(One Cubic Meter) | 1,000 ₹15,000 Lowest | 5,000 ₹75,000 | 4,759.82 ₹71,397.3 | 4,530.63 ₹67,959.45 | 1,000 ₹15,000 Lowest | 4,264 ₹63,960 |
| 3.00 | Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for drain Side Walls | 165 | 1Cum(One Cubic Meter) | 8,120 ₹13,39,800 | 7,600 ₹12,54,000 Lowest | 8,576.35 ₹14,15,097.75 | 8,163.68 ₹13,47,007.2 | 7,960 ₹13,13,400 | 7,682 ₹12,67,530 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
28 Aug 2026, 3:00 pmClosed
Commissioner surandai Municipalirty
Commissioner surandai Municipalirty
Surandai Municipality Construction of Retaining wall at 23rd ward Sivan Temple Back Side Shenbaga canal Near FSTP Collection Well
2026_MAWS_693107_1
820/2026/E1
Open Tender
Civil Works
Item Rate
180 days
SURANDAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
7 Oct 2026
11 Aug 2026
28 Aug 2026
11 Aug 2026
28 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 100 | 1Cum(One Cubic Meter) | 110 | ₹11,000 |
| 2 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 15 | 1Cum(One Cubic Meter) | 5,330.15 | ₹79,952.25 |
| 3 | Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for drain Side Walls | 165 | 1Cum(One Cubic Meter) | 9,603.97 | ₹15,84,655.05 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_833360.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_833360.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .