Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2727.5 CrAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹27.7 Cr+₹15.8 L (0.57%)Rejected-Finance | l2 | Rejected-Finance l2 | |
| 3 | l3₹29.0 Cr+₹1.5 Cr (5.52%)Rejected-Finance GOPAL CHOWK SUNDERNAGAR | SUNDERNAGAR | MANDI | HIMACHAL PRADESH | 175018 | l3 | Rejected-Finance l3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected | |
| 5 | Rejected-Technical SCF 126 OPP SUKHRAJ CINEMA GONIANA ROAD BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | - | Rejected-Technical Rejected |
Tender Value
₹35.0 Cr
EMD Value
₹35.3 L
Closing Date
15 Dec 2023, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Hamirpur
Executive Engineer HPPWD Hamirpur
Construction of Tourism Development Corporation Hotel at Nadaun District Hamirpur
2023_PWD_81722_1
C/O Tourism Development Corporation Hotel at Nadau
Open Tender
Civil Works - Buildings
Percentage
547 days
Hamipur
Please refer Tender documents.
13 documents required · 13 mandatory
₹5,000
₹35.3 L
10 Apr 2024
23 Nov 2023
15 Dec 2023
23 Nov 2023
15 Dec 2023
23 Nov 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of Jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm (thirty centimetres) measured at a height of 1mtr (one metres) above ground and removal of rubbish upto a distance of all leads and lifts out side the periphery of the area cleared including entire carriage of material with in all leads and lifts and as per drawings and technical specifications and the direction of Engineer-in-Charge including other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 10,000 | Per square metre | 10.45 | ₹1,04,500 |
| 2 | Cutting in earth work and disposal of excavated earth upto all leads and lifts in pick work, jumper work, blasting work soft rock and hard rock including chiselling wedging and any other mixed variety in dry or saturated conditions upto breaking with breaker any depth and lift including pumping and bailing out water where required including stacking the serviceable and unserviceable materials separately as directed and then returning the stacked soil in fifteen centimeters layers when required into plinth and sides of foundation etcetra consolidating each deposited layer by ramming and watering and then disposing of all surplus un-serviceable excavated earth within all leads and lifts as directed by the Engineer-in-Charge including carriage of materials in all leads and lifts, disposed materials to be neatly levelled. The recovery of useful stone will be effected @ 3% (three percent) of work done for cutting work for Rs. 255/- per cum (Rupees two hundred fifty five per cubic metre) on pro-rata basis including entire carriage of material with in all leads and lifts and as per drawings and technical specifications and the direction of Engineer-in-Charge including other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 750 | Per cubic metre | 346.6 | ₹2,59,950 |
| 3 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 8,989.13 | Per Cubic Metre | 331.1 | ₹29,76,300.94 |
| 4 | Disposal of excavated earth by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km (Ten kilometre) for all lifts, complete as per directions of Engineer-in-charge. Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum (Three point five cubic metre) or more within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 4,422.23 | Per Cubic Metre | 320.7 | ₹14,18,209.16 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etcetera in layers not exceeding 20cm (Twenty centimetre) in depth, consolidating each deposited layer by ramming and watering, upto all leads and lifts including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 525 | Per cubic metre | 180.5 | ₹94,762.5 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 303.5 | Per Cubic Metre | 2,065.65 | ₹6,26,924.78 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | - | - | - |
| 8 | Foundations, footings, bases for columns | 790.53 | Per square metre | 265.75 | ₹2,10,083.35 |
| 9 | Suspended floors, roofs, landings, balconies and access plat form | 5,862.58 | Per square metre | 639.35 | ₹37,48,240.52 |
| 10 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 3,743.93 | Per square metre | 540.3 | ₹20,22,845.38 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 1.15 MB
corrigendumNadaun.pdf
Tender Document • 1.84 MB
Corrigendum123.pdf
Tender Document • 0.52 MB
Corrigendum5.pdf
Tender Document • 0.49 MB
Corrigendum4.pdf
Tender Document • 0.49 MB
Corrigendum3.pdf
Tender Document • 0.48 MB
TourismCorrigendum.pdf
Tender Document • 0.43 MB
TouristHotalNadaun15.11.2023.pdf
Tender Document • 4.22 MB
123456.pdf
Tender Document • 0.43 MB
BOQ_121569.xls
BOQ • 1.76 MB
UPDATEDBILLOFQUANTITY.pdf
BOQ • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .