Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
22 Jun 2026, 3:00 pm
NIREEKSHANA RAO K, Manager(CnP-Projects)
GAIL INDIA LIMITED, JUBILEE TOWER, B-35 AND 36 SECTOR-1 NOIDA -201301
LAYING OF STEEL PIPELINE AND ASSOCIATED FACILITIES FOR LMC TO AVAADA GREEN GLASS PRIVATE LIMITED, NAGPUR
2026_GAIL_280199_1
GAIL/NOIDA/CnP/LMC/LAY/26-17
Limited
Oil/Gas
180 days
As per SOW
As per tender
11 documents required · 11 mandatory
₹0
₹15 L
Yes
THROUGH VC
8 Jun 2026
8 Jun 2026
23 Jun 2026
8 Jun 2026
22 Jun 2026
15 Jun 2026
8 Jun 2026 - 11 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | SECTION-A (MAIN LINE WORKS) | - | - | - | - | - |
| 2 | PIPELINE LAYING / INSTALLATION (CARBON STEEL PIPES) | - | - | - | - | A00100 |
| 3 | Receiving and taking over, as defined in the specifications, handing, loading, transportation and unloading of Owner-supplied 3-layer PE coated line pipes along with associated fittings and valves from Owner's designated stock-yard to Contractor's stock-yard / workshop / work-site including preliminary activities, preparation of drawings wherever required for crossing, etc. including handling, stacking, stringing on the pipeline right-of-use / pipeline route alignment, carrying out inspection of Company-supplied materials, including line pipes, at the time of taking over, laying / installation of coated line pipes, associated fittings (IJ,barred tee etc) and accessories, including execution of all works, taking over, handling, including loading and unloading, arrangement of all additional land required for Contractor's storage, fabrication, procurement and supply of all consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline, as per drawings, specifications, other provisions of Contract Document and instructions of Engineer-in-Charge (EIC), including, but not limited to, carrying out following works: | - | - | - | - | - |
| 4 | Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities. Shifting of all obstructions within the ROU / pipeline route alignment, viz. electrical lines / poles, telephone lines / poles, coordination with concerned authorities and obtaining permissions from these authorities. | - | - | - | - | - |
| 5 | Trenching to all depths by excavation in all types of soils except Rocky terrain, chiselling or otherwise cutting different types of pavement, footpath, roads etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline and optical fibre conduit as per the relevant standard / specification etc. [The minimum depth of the top of pipeline shall be 1.0m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per Special Condition of Contract (SCC) / OSID - 141 OISD - 226]. Dewater of trenches if required as per site condition.
Note : Additional payment on account of excavation in Rocky Terrain ( Where execavation is not possible by JCB, Poclin, Trencher, Manual etc. and Excevation shall be done by Breaker/Blasting ) for breaking rock . The payment shall be done as per SOR item No. A00120 based on actual measurement for Rocky Terrain encountered as certified by the EIC and duly certified geotech survey. Geotech survey shall be done by contractor and payment shall be made as per relevant SOR item. | - | - | - | - | - |
| 6 | Carrying out repairs of pipe defects / replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects / damages occurring during transportation / handling. | - | - | - | - | - |
| 7 | Stringing of line pipes along ROU including providing straw / sand / soft soil bags, soft padding / sand padding. | - | - | - | - | - |
| 8 | Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding & field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-Ray (in case of space constrant & small work by Gamma Ray on Owner's approval) as per specifications in piping of all types and thickness and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities & personnel to process, develop, examine and interpret radiographs & other tests as required, carrying out repairs of weld-joints found defective by EIC, carrying out re-radiography and other tests as required on repaired joints, etc. as mentioned in SCC and particular job specifications. | - | - | - | - | - |
| 9 | Installation of carrier line pipe at all crossings viz road, cartrack, pathway, drain, nallah & minor water crossings, etc. at designated depth by open cut (including laying of casing pipe) (except at HDD / Boring cased crossings which is covered separately elsewhere in this SOR). | - | - | - | - | - |
| 10 | Installation of carrier line pipe at all crossings viz road, cartrack, pathway, drain, nallah & minor water crossings, etc. at designated depth by open cut (including laying of casing pipe) (except at HDD / Boring cased crossings which is covered separately elsewhere in this SOR). | - | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.25 MB
TechVolP5.pdf
Tender Documents • 12.31 MB
TechVolP4.pdf
Tender Documents • 14.52 MB
TechVolP9.pdf
Tender Documents • 11.58 MB
TechVolP8.pdf
Tender Documents • 10.03 MB
TechVolP6.pdf
Tender Documents • 13.31 MB
TechVolP7.pdf
Tender Documents • 13.03 MB
TechVolP10.pdf
Tender Documents • 8.59 MB
TechVolP3.pdf
Tender Documents • 13.15 MB
TechVolP2.pdf
Tender Documents • 15.75 MB
TechVolP1.pdf
Tender Documents • 16.14 MB
Tender.pdf
Tender Documents • 11.15 MB
BOQ_327025.xls
BOQ • 0.99 MB
Download all tender documents and submit your bid