Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 CrAccepted-AOC 65 MODEL TOWN 136026 | KAITHAL | HARYANA | 136026 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.7 Cr+₹43.8 L (3.57%)Rejected-AOC 13 AJAY VIHAR OPP HUDA SECTOR 20 SIRSA | SIRSA | SIRSA | HARYANA | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.8 Cr+₹1.5 Cr (12.4%)Rejected-AOC BOOTH NO 53 MAIN MARKET KITCHLU NAGAR LUDHIANA 141001 | LUDHIANA | LUDHIANA | PUNJAB | 141001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹17.3 Cr+₹5.1 Cr (41.4%)Rejected-AOC 1586 GALI NO 1 NEJA MANIA CHAUK SECTOR LAKHI COLONY BARNALA | BARNALA | BARNALA | PUNJAB | L4 | Rejected-AOC L4 | |
| 5 | L5₹17.7 Cr+₹5.4 Cr (44.2%)Rejected-AOC SCO 2 DASHMESH ENCLAVE PATIALA ROAD ZIRAKPUR | L5 | Rejected-AOC L5 |
Tender Value
₹18.3 Cr
EMD Value
₹36.5 L
Closing Date
30 Oct 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o Executive Engineer, Construction Division, PWD B and R Patiala
Work of Strengthening of Patiala Pehowa Road (SH-08) from RD 18.00 km to 36.500 km in the State of Punjab Year 2025-26
2025_CEPW_151047_1
Bid no. 24 dated 29.09.2025
Open Tender
Civil Works - Roads
Percentage
365 days
Distt.Patiala
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹36.5 L
O/o Executive Engineer, Const Division Patiala
27 Nov 2025
29 Sept 2025
30 Oct 2025
29 Sept 2025
30 Oct 2025
29 Sept 2025
8 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction Work (Part-I) | - | - | - | - |
| 2 | Constructionof Embankment withGoodQuality Earth obtained from Borrow pits Construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required slope and compacting to meet requirementof table300-2asper technicalclause 305 of MORT&H specifications | 12,862.5 | Cum | 474.6 | ₹61,04,542.5 |
| 3 | Dismantling of Flexible Pavements (By Mechanical MeansDismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of
MORT&H specifications | 1,927.8 | Cum | 307.62 | ₹5,93,029.84 |
| 4 | Construction of granular sub-base by providing material as per grading-III ( Table 400-I of MORT&H 5th revision), mixing in a mechanical mix plant at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications | 242.4 | Cum | 2,156.68 | ₹5,22,779.23 |
| 5 | Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of MORT&H specifications | 2,620 | Cum | 2,495.83 | ₹65,39,074.6 |
| 6 | Prime Coat @ 0.85kg per sqm Providing and applying primer coat with bitumen emulsion SS on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm
complete as per technical clause 502 of MORT&H specifications | 11,760 | Sqm | 34.26 | ₹4,02,897.6 |
| 7 | Tack Coat @ 0.25kg per sqm Providing and applying tack coat with bitumen emulsion RS using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications | 1,21,068.36 | Sqm | 11.35 | ₹13,74,125.89 |
| 8 | Providing and laying dense graded bituminous macadam 50mm to 75mm thick with Batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.5%, laying with a Paver Finisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 505 of MORT&H specifications
NOTES:-
(i) Job mix formula for the dense bituminous macadam shall be provided by the agency and shall be got approved from Punjab PWD, B&R Research Laboratory Patiala before adoption at site for execution.
(ii) The specification of this item for analytic purpose is kept with bitumen content @ 4.50% weight of mix variation as compared with job mix formula shall be paid/ deducted accordingly. The limits of variation shall be worked out with the approved formula.
TECHNICAL NOTE:-
I.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for dense bituminous concrete shall meet all requirements set forth clause 505 of MORT&H specifications.
II.) The final grading for the aggregates required for dense bituminous macadam confirming to table 500.10 of MORT&H specifications shall be determined after getting the dense bituminous macadam designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
III.) The approved mix shall exhibit the following details source and location of all material:-
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates.
(f) Density of dense bituminous macadam after compaction will be not less than 2.30 gm/CC | 7,104.48 | Cum | 11,110.06 | ₹7,89,31,199.07 |
| 9 | Providing and applying tack coat with bitumen emulsion RS using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications & to the entire satisfaction of Engineer-in-Charge | 1,07,161.94 | Sqm | 11.35 | ₹12,16,288.02 |
| 10 | Providing and laying bituminous concrete 30mm to 45mm thick with Batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.4%, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications
NOTES:-
(i) Job mix formula for the bituminous concrete shall be provided by the agency and shall be got approved from Punjab PWD, B&R Research laboratory Patiala before adoption at site for execution.
(ii) The specifications of this item for analytic purpose is kept with bitumen content @ 5.4% weight of mix variation as compared with job mix formula shall be paid/ deducted accordingly. The limits of variations shall be worked out with the approved formula.
TECHNICAL NOTE:-
i.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for bituminous concrete shall meet all requirements set forth clause 507 of MORT&H specifications.
ii.) The final grading for the aggregates required for bituminous concrete confirming to table 500.17 of MORT&H specifications shall be determined after getting the bituminous concrete designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
iii.) The approved mix shall exhibit the following details, source and location of all material:-
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates
(f) Density of bituminous concrete after compaction will be not less than 2.35 gm/CC. | 4,286.48 | Cum | 12,743.14 | ₹5,46,23,214.75 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
sbd.pdf
Tender Documents • 9.31 MB
BOQ_305951.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .