Tender Value
Refer Docs
EMD Value
₹71.9 L
Closing Date
22 Jul 2026, 3:00 pm
Chief Engineer
Chief Engineer, Civil Engineering Department, VOC Port Authority
Construction of Truck Parking Terminal at Port land opposite to SEPC Power Pvt. Ltd
2026_VOCPT_282697_1
11 CE / RCM BM / 2026 - 27
Open Tender
Civil Works
540 days
VOC Port Authority
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹71.9 L
Yes
VOC Port Authority
2 Jul 2026
2 Jul 2026
23 Jul 2026
2 Jul 2026
22 Jul 2026
2 Jul 2026
2 Jul 2026 - 13 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE A - Development of yard and Construction of Security wall | |||||
| 1.01 | Earthwork excavation in trenches for foundation in sand and other loose soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift
upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage ofwater wherever necessary etc., complete complying with AISS and as directed by the departmental officers. | 6,360 | CUM | 299.6 | ₹19,05,456 |
| 1.02 | Providing and laying Plain Cement Concrete 1:4:8 (One part of cement, 4 parts of M. Sand (Crushed Stone Sand) & 8 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers. | 340 | CUM | 5,756.66 | ₹19,57,264.4 |
| 1.03 | Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers. | 133.9 | MT | 87,737.14 | ₹1,17,48,003.05 |
| 1.04 | Providing Form work including centring, shuttering for wall concrete so as to give a rough finish shuttering and propping etc., complete complying with AISS and as directed by the departmental officers. | 5,770 | SQM | 622.67 | ₹35,92,805.9 |
| 1.05 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of M. Sand (Crushed Stone Sand) & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers. | 1,220 | CUM | 8,192.47 | ₹99,94,813.4 |
| 1.06 | Solid block Cement Mortar 1:3 (One Cement, three sand) using M7.5 grade for walls in all floors up to full height of the building including cost of all materials, labour, curing etc., complete and as directed by the departmental officers. | 920 | CUM | 8,315 | ₹76,49,800 |
| 1.07 | Plastering the Brick work 15 mm thick in Cement Mortar 1:3 (One cement, three sand) for all faces of walls (even and uneven) in all floors upto full height of the building including necessary scaffolding, racking of masonry joints, cleaning, curing etc., complete complying with AISS and as directed by the departmental officers. | 4,900 | SQM | 340.69 | ₹16,69,381 |
| 1.08 | Supplying the structural steel, MS Flats, Square Rods, Angles, Channels etc., for vertical members / bracing /stiffeners / Base plates or for any other usage as a structural member, fabricating, welding and erecting the frame work in position at the locations shown in the drawing including all labour, materials, conveyance, tools & plants, etc., complete and as directed by the departmental officers (Note : 1. While fabricating, necessary holes and bolt & nut shall be provided at no extra cost in the structural members. 2. In case, the specified MS section is not available in the market, the nearest alternative section may be used after approval of the Engineer). | 7,000 | KG | 133.1 | ₹9,31,700 |
| 1.09 | Providing and fixing concertina coil fencing with punched tape concertina coil 600mm dia 10 metre openable length (total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron U shaped placed 2.4m or 3.00m apart and with 9 horizontal R.B.T reinforced barbed wire, stud tied with G.I. staples and G.I clibs to retain horizontal, including necessary bolts or G.I barbed wire tied to angle iron, all complete as per direction of Engineer-in- charge, with reinforced barbed tape (R.B.T) / Spring core (2.5mm thick) wire of high tensile strength of 165 Kg / Sq.mm with tape (0.52 mm thick) and weight 43.478 gm / metre (cost of M.S angle, C.C blocks shall be paid separately etc.,) complete and as
directed by the departmental | 1,000 | RM | 517 | ₹5,17,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Technicalbid.pdf
Tender Documents • 2.05 MB
BOQ_329797.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid