| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹90.5 LAdmitted-Finance AT DUMDUMA KHANDAGIRI PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA PIN 751019 | KHORDHA | ODISHA | 751019 | -16.10% | ₹90.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance NA | +0.00% | ₹1.1 Cr | L2 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
18 Feb 2026, 5:00 pmClosed
S.E. Electrical Circle (RandB) Bhubaneswar,
S.E. Electrical Circle (RandB) Bhubaneswar, Nirman Soudha, Unit-V, 751001.
Shifting and relocation of existing electrical installation due to impvt. Such as widening and strengthening of Bandalo Enderpada road from 0.00 Km to 5.300 Km under Chatia Section, Jajpur
2026_EICCL_125524_2
Bid Identification No.S.E.E.C (RandB) 27/2025-26
National Competitive Bid
Electrical Works
180 days
Charbatia
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
30 Mar 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
4 Feb 2026 - 11 Feb 2026
PART A: Construction of 4.9 CKM 11 kV O/H line using 10 Mtr. PSC Pole & 80 Sq.mm. AAA Conductor (Refer PSLD)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). DP Without AB Switch PSC POLE 10 METER LONG 330 KG.
PSC Pole Clamp(GI)
Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 2.3 mtr., 2 no's Channel(GI) required =( 2x9.56x2.3)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)
Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 1.66 Mtr., 2 no's Channel(GI) required =( 7.14x1.66x2)
50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 2.671 mtr., 2 nos Angle(GI) required = (4.5x2.671x2)
Danger Plate, 2 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510)
H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
Gi Pipe Earthing 40mm. 3 Mtr. Long
50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
GI Nut , Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole)
Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design
DP With AB Switch PSC POLE 10 METER LONG 330 KG.
PSC Pole Clamp(GI)
Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 3 mtr., 2 no's Channel(GI) required =( 2x9.56x3)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)
AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2)
AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35)
Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1)
Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2)
50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2)
Danger Plate, 2 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510)
H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
Gi Pipe Earthing 40mm. 3 Mtr. Long
50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510)
Lightning Arrester(12KV,10KA) (Station Class,class-2)
AB Switch (11KV,400A.3pole,50Hz)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole)
Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design
11 KV Cut Point with 180 Degree Angle PSC POLE 10 METER LONG 330 KG.
PSC Pole Clamp(GI)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required =( 2x9.56x1.2)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 2 no's Channel(GI) required =(2x9.56x0.306)
Danger Plate, 1 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole)
11 KV Cut Point with 90 Degree Angle PSC POLE 10 METER LONG 330 KG.
PSC Pole Clamp(GI)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306)
Danger Plate, 1 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole)
11 KV Pin Points PSC POLE 10 METER LONG 330 KG.
PSC Pole Clamp(GI)
11 KV V cross Arm(GI) (10.2 K.g. each )
Top bracket 100x50X6 mm GI Channel(GI) (2kg each)
Danger Plate, 1 no's. for each pole
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer, 3 Nos. required for each support
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)
80 sq.mm AAA conductor
Crimping type Midspan Compression Joint for 80 sq.mm AAA conductor
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
POLYCARBONATE BIRD GUARD
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole)
PART B: Installation of 16 Nos 11 Mtr. WPB Cut point for 8 Nos of road crossing (Refer PSLD)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). 11 KV Cut Point with 180 Degree Angle WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required =( 2x9.56x1.2)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 2 no's Channel(GI) required =(2x9.56x0.306)
Danger Plate, 1 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole)
Part-C: Installation of 01 No of existing 11/0.433 KV, 250 KVA DTR on Proposed DP (Refer PSLD) (Cost of DTR not considered, existing DTR will be used)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
9 Mtr. long 300 Kg. PSC Pole
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)
EYE hook for XLPE Aerial bunched Cable
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable
LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 6 No's.) (Each 6x1.000x7.14= 42.84 Kg)
Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)
AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg)
AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35)
Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1)
HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg)
Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg)
Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg)
Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3.0 Mtr., 2 no's Channel(GI) required =( 7.14x3x2)
50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2)
50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg)
LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S
55 SQ.MM. AAAC XLPE Covered Conductor
1 Cx 630 mm2 LT XLPE Cable(Un-Armoured)
LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg)
LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr., each Angle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2)
Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable from LTDB to Pole
AB Switch(11KV,200A.3pole,50Hz)
DO.Fuse( 11KV.200A.3Pole)
20 AMP Fuse Link
WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
Disc insulator (B&S)70 KN polymer
H W fitting (B&S)70KN(3bolted)
Lightning Arrester(12KV,10KA) Station Class 2
11KV pin insulator polymer
HT stay set complete
HT stay Clamp (1.9Kg/pair)
HT stay insulator TYPE-C
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long
GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP)
GI Barbed wire/Anticlimbing device (3Kg /Pole)
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510)
Danger plate 11kv
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510)
Name plate
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole)
Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole)
PCC ratio 1:3:6(M-10 Grade) For DSS Area (3.5X2.5X0.1)= 0.875 Cu. mtr.
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
LTDB Plinth
DTR Plinth
Laying of 4 Cx 150 mm2 LT XLPE Cable
Laying of 1.1kV cable from 400 to 1000sqmm
SITC and Erection of GI Fencing with Gate
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole)
Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement.
Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement.
Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells.
Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells.
Part-D: Installation of 01 No of existing 11/0.433 KV, 25 KVA DTR on Proposed DP (Refer PSLD) (Cost of DTR not considered, existing DTR will be used)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
9 Mtr. long 300 Kg. PSC Pole
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)
EYE hook for XLPE Aerial bunched Cable
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable
LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg)
Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)
AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg)
AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35)
Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1)
HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg)
Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg)
Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg)
Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg)
Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg)
Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg)
Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg)
LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg)
50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg)
LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 25 KVA S/S
55 SQ.MM. AAAC XLPE Covered Conductor
4 Cx 35 mm2 LT XLPE Cable(Armoured) - FOR 25 KVA Trf.
4 Cx 35 mm2 LT XLPE Cable(Armoured) - From LTDB to PSC Pole
AB Switch(11KV,200A.3pole,50Hz)
DO.Fuse( 11KV.200A.3Pole)
2.5 AMP Fuse Link
WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
Disc insulator (B&S)70 KN polymer
H W fitting (B&S)70KN(3bolted)
Lightning Arrester(12KV,10KA) Station Class 2
11KV pin insulator polymer
HT stay set complete
HT stay Clamp (1.9Kg/pair)
HT stay insulator TYPE-C
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long
GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP)
GI Barbed wire/Anticlimbing device (3Kg /Pole)
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510)
Danger plate 11kv
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510)
Name plate
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole)
Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole)
PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr.
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
Laying of 4 Cx 35 mm2 LT XLPE Cable
SITC and Erection of GI Fencing with Gate
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole)
Supply of AL Lugs suitable for 35 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement.
Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 16-35sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells.
Part-E: Installation of 02 No of existing 11/0.23 KV, 16 KVA DTR on Proposed Single Pole (Refer PSLD) (Cost of DTR not considered, existing DTR will be used)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Top Channel(GI) GI 100 X 50 X 6 MM (1200 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x1.200x9.56= 22.94 Kg)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., Noch 0.280 mtr. length, 4 No's required = (4x2.36x0.280)
Transformer Mounting Bracket (65x65x6 GI Angle(GI)) suitable for 16/10KVA 11/0.23 KV Transformer
AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (2000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x2.000x7.14= 28.56 Kg)
Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg)
HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (2000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x2.000x7.14= 28.56 Kg)
25x3mm Flat(GI) for earthing, 0.59kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle) ( Each 62.6x 0.59= 36.93 Kg)
LT Dist. Box with MCCB for 16KVA S/S.
55 SQ.MM. AAAC XLPE Covered Conductor
2Cx16 mm2 LT XLPE Cable(armoured)
AB Switch(11KV,200A.2pole,50Hz)
DO.Fuse( 11KV.200A.3Pole)
2.5 AMP Fuse Link
WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
Disc insulator (B&S)70 KN polymer
H W fitting (B&S)70KN(3bolted)
Lightning Arrester(12KV,10KA) Station Class 2
11KV pin insulator polymer
HT stay set complete
HT stay Clamp (1.9Kg/pair)
HT stay insulator TYPE-C
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long
GI Nuts & Bolts of Assorted size (15 Kg/ DSS SP)
GI Barbed wire/Anticlimbing device (3Kg /Pole)
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 No's = (4x0.59x0.510)
Danger plate 11kv
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 No's (Noch 1x0.59x0.510)
Name plate
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole)
PCC ratio 1:3:6(M-10 Grade) For DSS Area (3X2X0.1)= 0.6 Cu. mtr.
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
Laying of 2 Cx 16 mm2 LT PVC Cable
Supply of AL Lugs suitable for 16 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement.
SITC and Erection of GI Fencing with Gate
PART F: Construction of 1.2 KM LT line using WPB pole & (4C×70 mm² (P)+1C×70 mm²(M)+1CX16 mm²(Street Light) LT AB cable (Refer PSLD)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
9 Mtr. long 300 Kg. PSC Pole
LT Stay set Complete
7/12 SWG GI stay wire, Grade -2
LT stay Clamp ( 1.40Kg/pair)
LT Stay insulator
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)
EYE hook for XLPE Aerial bunched Cable
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable
Suspension Clamp with EYE hook for ABC
4C×70 mm² (P)+1C×70 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)
8 WAY SERVICE Distb.Box with kit kat fuse and Aluminium bus bar.
Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm
GI Pipe Earthing (each 5th pole to earth)
Coil Earthing
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
Danger plate (LT)
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole)
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole)
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
PART G: Construction of 1 KM LT line using 9 Mtr. PSC pole & (4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) LT AB cable (Refer PSLD)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). 9 Mtr. long 300 Kg. PSC Pole
LT Stay set Complete
7/12 SWG GI stay wire, Grade -2
LT stay Clamp ( 1.40Kg/pair)
LT Stay insulator
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)
EYE hook for XLPE Aerial bunched Cable
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable
Suspension Clamp with EYE hook for ABC
4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)
8 WAY SERVICE Distb.Box with kit kat fuse and Aluminium bus bar.
Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm
GI Pipe Earthing (each 5th pole to earth)
Coil Earthing
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
Danger plate (LT)
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole)
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
PART H: Construction of 1 KM LT line using 9 Mtr. PSC pole & (4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) LT AB cable (Refer PSLD)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). 9 Mtr. long 300 Kg. PSC Pole
LT Stay set Complete
7/12 SWG GI stay wire, Grade -2
LT stay Clamp ( 1.40Kg/pair)
LT Stay insulator
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)
EYE hook for XLPE Aerial bunched Cable
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable
Suspension Clamp with EYE hook for ABC
4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)
8 WAY SERVICE Distb.Box with kit kat fuse and Aluminium bus bar.
Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm
GI Pipe Earthing (each 5th pole to earth)
Coil Earthing
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
Danger plate (LT)
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole)
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
PART I: Installation of 8 Nos of 11 kV Road crossing guarding having span 30 Mtr. each (Refer PSLD)2. Installation of 12 Nos of LT Road crossing guarding having span 30 Mtr. each (Refer PSLD)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme). Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole)
No-6 GI wire (0.192 kg/mtr.) for Main String
No-8 GI wire (0.131 kg/mtr.) for lacing
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)
Gi Pipe Earthing 40mm. 3 Mtr. Long
50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
PART J : Dismantling Portion Dismantling of 9/8 Mtr. PCC/Joist Pole
Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 16KVA including removal of HT/LT leads, earth connections and unloading by crane if required.
Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required.
Dismantling of existing 11/0.4kV, 33/0.4KV, 250kVA Three Phase Distribution Transformer including removal of HT/LT leads, earth connections and unloading by crane if required.
Dismantling of ACSR/AAAC 80/100 mm2 from overhead line
Dismantling of varous size of LT AB Cable Salvage value @ 8% to be deducted from the contractor's bill.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
DTCN.pdf
Tender Documents • 1.87 MB
BOQ_579333.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid