Loading…
Loading…
Tender Value
₹51.4 L
EMD Value
₹1.0 L
Closing Date
28 May 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SIGNAL
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less ; where V = Advertised value of the tender in crores of Rupees N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure- I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited. : Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Any signalling work involving trenching, cable laying, termination and outdoor wiring. Note 1: Tenderer may be required to submit the schedule of those works, Completion/Performance Certificates of which have been submitted by him/her in support of 30/40/60 % (as the case may be) criterion of similar nature of work.
22 conditions · 13 needing a document upload
PAN card Copy should be enclosed.
Please submit the copy of the registration certificate as applicable, GSTIN certificate should be enclosed.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Firm has to submit authorization letter for uploading documents on IREPS in case he/she is not an authorized person.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available ON IREPS portal LIKE net banking, debit card, credit card etc.Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed.
Copy of PAN number and GSTIN number should be submitted.
No post tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenders shall be treated as NULL & Void.
(i)Tenderers will examine various provisions of the Central Goods and Service Tax Act, 2017(CGST)/Integrated Goods and Service Tax Act,2017(IGST)/Union Territory Goods and Service Tax Act,2017(UTGST)/respective states State Goods and Service Tax Act(SGST) also, as notified by Central/States Govt. and as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit(ITC) likely to be availed by them is duly considered while quoting rates. (ii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority. (iii) In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism(RCM) and deposit the same to the concerned authority.
Tenderer should go through Annexure 1 & 2 of Tender Notice (attached in Tender Document)for list of documents required to be uploaded along with the offer.
Signalling work i.c.w. CTR/TTR work in the section of ADSTE/AYC of Lucknow Division of Northern Railways.
106-Sig-Tender-10-2026-27
106-Sig-Tender-10-2026-27
Open
Works - General
365 Days
Lucknow, Uttar Pradesh
₹0
₹1.0 L
28 May 2026
6 May 2026
14 May 2026
123 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 51,36,407.64 | ||
| — | 3000.00 | — | — | ||
| Excavating and refilling of trench to the level of ground with rammed earth asper Drg. No.(NR/S&T/Con/1.1/97A) so as not to form a drain 0.3 Mtrs wide & 1mtr deep on both side of the station alongside thetrack. It shall conform to the safe distance as persignalling and cable plan in all type of soil, it also includes clearence of roots of trees and bushes. | — | — | — | 1,40,280 | |
| — | 6000.00 | — | — | ||
| Laying of signalling/Telecom/power cables of different sizes as per attached guidelines (Drg. No.(NR/S&T/Con/1.1/97A1) or latest on signalling cable laying and as per cableroute plan approved by Railways through trenches, RCC pipe, DWC pipe, GI pipe etc andmeggering of cable before and after its laying of all type of outdoor cables. Contractor have to transport cable from any store of LKO division to site carefully. Meggering to be done for each drum separately. Meggering sheets to be supplied and filled up by contractor and submitted to Railways, as per instructions by Consignee. | — | — | — | 34,500 | |
| — | 24000.00 | — | — | ||
| Supply and laying of 2nd class bricks in the trench and laying as per Drg. No. (NR/S&T/Con./1.1/97A) and as per instruction of the site Engineer. | — | — | — | 1,48,080 | |
| — | 100.00 | — | — | ||
| Boring and trenchless cabling along with supply and insertion of DWC/HDPE self lubricated pipes as per RDSO Spec no. RDSO/SPN/204/2011 Ver 1.1 or latest of 120 mm nominal dia in the bore at the depth of 1.4 meter to 2.1 meter from formation level (level of earth below ballast) as per drawing and as directed by Engineer Incharge by trenchless technology for laying of signalling /telecom/power cable under track /culvert etc. cable laying covered separately. Inspection-Consignee for Supply of DWC/HDPE pipe. The following required coupling arrangement should also be supplied: 1. Suitable snap fit couplers with rubber O ring, 2. Spacers, 3. Tees. 4. Bend. 5. End Cap (1 no. =6mtr ,Straight pipe). (A) Thecost shall include horizontal boring through any intermediate obstruction, either natural or man made or any boundary etc. (B) The rate is inclusive of all the materials equipment and labour required for during trenchless horizontal boring under the railway track. Nothing extra shall be admissible on any account than the rate quoted above. (C) The Pipeis to be laid under railway track/road /culvert. All necessary arrangement are to be provide and all precautions are to beend is not deviated from the horizontal level line by more than 250mm in horizontal and vertical direction. (D) The rateshall be inclusive of direction and protection of underground utilities encountered during boring. (E) The payment forboring shall be made only when DWC/HDPE pipe are laid in the bore. | — | — | — | 1,38,420 | |
| — | 100.00 | — | — | ||
| HDD boring and trenchless of 120 mm bore dia without HDPE pipe for laying in the bore at the depth of minimum 1.4 meter from formation level (level of earth below ballast) as directed by Engineer Incharge by HDD technology for laying of signalling /telecom/power cable under track /culvert etc. cable laying covered separately. | — | — | — | 96,971 | |
| — | 50.00 | — | — | ||
| Supply and installation of earth electrodes as per std.practice. The item includes digging of pit in earth, 3 Mtrs. deep and fixing earth electrode pipe.Casting of cement concrete enclosures as per drg. No.(NR/S&T/CON/6.4/97) or latest. The soil treatment shall be done as per std.practice. The item includes provision of mild steel flat of size 35mm x 6mm (as per IRSEM) and nut bolted connection of MS flat with earth electrode. The other end of mild steel flat to be connected to block instrument, cable sheath of power equipment, signal base, apparatus case,CT rack / relay racks, other equipments asper the instruction of Engr. at site & IRSEM. Earth connection Signal & location boxes to be done Drg.No. 19-D6 of IRSEM App II or latest. Complete materials such as earth electrodes as per Drg. No. (NR/S&T/CON/6.3/97) or latest , cement, wiring material, nut bolt for connection & mild steel flat of size minimum 35mm x 6mm or 210 sqm as per SEM etc. to be supplied by the contractor. Inspection by - Consignee for supply of earth electrode. | — | — | — | 1,73,146 | |
| — | 1000.00 | — | — | ||
| Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets of existing locations and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. The work shall be carried out as per instructions of Railway Engineer incharge. | — | — | — | 14,980 | |
| — | 500.00 | — | — | ||
| Termination of all the cores of all type of outdoor cables after its laying on both end.This also includes preparation of test report for core to core and core to earth on prescribed proforma for each core of the cable separately. This also includes dressing and lacing of cables on both ends.Proforma for testing and material for lacing to be supplied by the contractor. | — | — | — | 5,955 | |
| — | 2.00 | — | — | ||
| Shifting of Exposed cables. The item includes Removal of exposed cable from existing trench & laying the same in new trenches. Digging, Placing of capping/Half round RCC pipe/ bricks covered separately. | — | — | — | 14,473.3 | |
| — | 1000.00 | — | — | ||
| Shifting of existing cables from old location boxes / relay room to new location boxes / new cable termination racks, terminating the conductors in serial order, bunching neatly for matching the circuits with new cables as per cable plan. | — | — | — | 9,080 | |
| — | 15.00 | — | — | ||
| Casting, concreting, curing of foundations of size (400mmx300mm) at surface and 1000mm deep and erection of retroreflective SLB/BSLB/SB/ calling on boards/Goods Warning Board/Passanger Warning Board as per Drg. No. NR/S&T/CON/7.4/97 or latest & provisions of SEM. It includes supply of retroreflective SLB/BSLB/SB/ calling on boards/Goods Warning Board/Passanger Warning Board. The SLB/BSLB shall be as per approved Drg. No.SA-2373 or latest. Calling on board should be as per DRG NO: NR/S&T/D&D/01/2022 or latest. Inspection by : Consignee for supply portion | — | — | — | 1,54,425.9 | |
| — | 20.00 | — | — | ||
| Casting, concreting and curing of foundation of main signal as per Drg. No. NR/S&T/Con / 2.1/97 or latest. All material such as Anchor bolts cement, sand, aggregate to be supplied by the contractor. | — | — | — | 1,87,970 | |
| — | 10.00 | — | — | ||
| Fixing of 2-aspect of colour light signal CLS surface base, bolting on the foundation. Erection of CLS post with signal unit on the top or on an offset bracket and fitting ladder and guard to the post at the top Concreting ladder base and embedded into the ground with supporting bracket in the middle. Blanking of the ladder for a distance of 1 feet between the height 6'9" and 7'9"from the rail level by MS angle and MS sheet 0.6mm thick wherever required. This includes provision of wooden ( sal ) cross arm 1Mx1M for CLS unit prior to the commissioning, fixing of AC / DC lit LED Signal unit and hood on CLS unit, wiring the CLS unit and fixing the signal. Elevation and distance of foundation from track shall be in accordance with schedule of dimension for Indian Railway published by Government of India & approved Drawings. All items for the above work except items mentioned in Annx B-2 shall be supplied by the contractor including following items. (i) U bolt for offset bracket. (ii) Wooden cross arm 1Mx1M (iii) MS sheet and MS angle for blanking of ladder (iv) Wire mesh guard, U-lock for unit , nuts and bolts etc for the following. (v) Supply and fixing of Signal Number Plate (Retro refractive type) with complete fittings as per standard railway practice. | — | — | — | 30,436.3 | |
| — | 10.00 | — | — | ||
| Fixing of 3/4-aspect of colour light signal CLS surface base, bolting on the foundation. Erection of CLS post with signal unit on the top or on an offset bracket and fitting ladder and guard to the post at the top Concreting ladder base and embedded into the ground with supporting bracket in the middle. Blanking of the ladder for a distance of 1 feet between the height 6'9"and 7'9"from the rail level by MS angle and MS sheet 0.6 mm thick wherever required. This includes provision of wooden (Sal) cross arm 1Mx1M for CLS unit prior to the commissioning, fixing of AC /DC lit LED Signal unit and hood on CLS unit, wiring the CLS unit and fixing the signal. Elevation and distance of foundation from track shall be in accordance with schedule of dimension for Indian Railway published by Government of India & approved Drawings. All items for the above work except items mentioned in Annx B-2 shall be supplied by the contractor including following items. (i) U bolt for offset bracket. (ii) Wooden cross arm 1Mx1M (iii) MS sheet and MS angle for blanking of ladder (iv) Wire mesh guard, U-lock for unit , nuts and bolts etc. for the following. (v) Supply and fixing of Signal Number Plate (Retro refractive type) with complete fittings as per standard railway practice. | — | — | — | 39,697.8 | |
| — | 10.00 | — | — | ||
| Replacement of old signal unit/signal route of main signal. This would include releasing of old unit from top of signal post erection and mounting of new signal unit over the post .This also includes bringing new signal unit from station to site and bring back old unit from site to station. Inspection- Consignee | — | — | — | 11,007.4 | |
| — | 20.00 | — | — | ||
| Refixing of electrical point machine, ground connection after removing the existing fitting if any, adjustment if necessary, cable termination, wiring, testing and commissioning of electrically operated point, fixing and connecting point indicator on derail switch if necessary.The work shall be done as per extant practise on N.Rly & the instruction of Railway engineer at site. | — | — | — | 59,024 | |
| — | 10.00 | — | — | ||
| Supply of complete set of point rodding (Ground connection) for 220 mm stroke point machines for thick web switches conforming to RDSO specification no. IRS:S 5@45>10@and as per Drg. No. RDSO/S 11000, RDSO / S 3454 & RDSO/S-3395 or latest as applicable. (coal Bangal for smithy work, all type of nuts & bolts and Lugs as required also to be supplied with each set). (Inspection:Consignee) | — | — | — | 2,42,569.4 | |
| — | 10.00 | — | — | ||
| Fabrication & Supply of complete set of point rodding for point machines of IRS type or its equivalent type as per RDSO drg. No. SA 8800-01 (Adv) or latest along with 'P' brackets and 'L' bracket required (Coal & Smithy work), all type of nuts & bolts and Lugs as reqd. also to be supplied by contractor with each set) Inspection : Consignee | — | — | — | 1,07,092.6 | |
| — | 200.00 | — | — | ||
| Supply of drill bit of size 9/32""(7.2/7.14mm) twist drill morse shank suitable for making holes inthe rails. Contractor should get theapproval of sample from railway Engineer before supply. (Inspection-Consignee) | — | — | — | 15,548 | |
| — | 10.00 | — | — | ||
| Fixing, wiring, testing & adjustment of 143mm/220mm throw point machine complete as per standard practice. It also includes:- (i) Fixing of switch extension P bracket, providing insulation for switch extension bracket, fixing ground connections, adjusting the correct opening of switches and adjusting the point machine with crank handle.(ii) Wiring inside the point machine, erection of 30/40 line junction box as per Rly. drawing, provided with terminal strips for cable termination. (iii) Supply & Fixing of GI pipes with flange for taking cable in to point machine and Jn. Box through gland/ GI pipe.(iv) Complete material for insulation viz. point insulation material, junction box, GI Pipe/gland pipe, wiring material, nut & bolts of various sizes, angle iron of size (75mmx75mmx10mm) , MS channels for fixing of machine, lugs for the point rodding and insulation material for the stretcher bar 90R/52kg/60kg as per RDSO Drg. no. SA-23171 ( Adv.) Alt. 1, SA- 23172 ( Adv.) Alt. 1 or latest will be supplied by the contractor.(v) Smithy and fitting work required at site for complete installation of gauge tie plate and insulation of GTP as per Drg. No. NR/S&T/CON/7.6/97 and William stretcher bar ( if required) will be done by the contractor. Machine will be overhauled by the contractor if required. (vi) This includes removal of existing gears and fixing themachine at raised level on channel as per standard practice to avoid flooding wherever required. (vii) Supply of ground connection of electric point machine, Non insulated GTP and CTP extension plate, Junction box and stretcher bar shall be made available by the railways. Work at site shall be inspected by site engineer. | — | — | — | 99,935.2 | |
| — | 200.00 | — | — | ||
| Wiring of relays in relay room/relay huts as per approved wiring diagrams. All material required will be supplied by contractor including indoor cables and wires of 1x1, 1x0.6, 3/.029, 16/0.2, 40x0.6, 40x1, 60x0.6, 60x1 dia.of copper conductor as per NR practice conforming to latest IRS S76/89 (Amd.3) or latest available specifications .This also includes soldering, dressing, bunching, lacing, fixing of relay bases etc. and provision of LED indication box of vital relays in relay room if required and provision of potential free contacts of all relays on tag block for data logger as per instruction of site Engineer. | — | — | — | 98,264 | |
| — | 12.00 | — | — | ||
| Casting, concreting and curing of foundation and erection of App. Case single as per Drg. No (NR/S&T/Con/2.7/97). A layer of 3mm of Bitumin compound has to be provided between foundation and location box to prevent ingress of water in the base of location box.All material such as cement, sand, aggregate & anchor bolts shall be supplied by the contractor. Contractor is required to execute all type of repair work of foundation if required during inserting the cable for termination. | — | — | — | 52,180.2 | |
| — | 12.00 | — | — | ||
| Preparation of App. Case single not involving wiring of relays: Preparation & fixing of bakelite hylum sheet 910x800x6mm and Backelite shelf 900x450x25mm duly fixed by angle iron piece of different size inside all the app. Cases. Hylum board shall be fixed on an angle iron frame of 25mmx25mmx3mm. Angle iron frame will be fixed in location boxes secured by nuts and bolts.This includes fixing of fuses, ARA terminal, fixing and jamming of cables with 2 inch thick salwood plank provided at the bottom. This will include opening, pasting and jamming armour of each cable in the hole drilled separately for each cable through the salwood plank and all cable entry points on location boxes, location huts, JBs relay room/battery room to be closed with suitable masonry Works covered with sand and plastering.Wiring description for terminal drawing of circuits, inside app. Case. Painting from out side as well inside with red oxide and aluminum paint is covered separately. Size of lettering will be 100mm or as per instructions of Engineer at site. All materials including Backelite shelf, hylum board, salwood plank, wire and wiring material, non deteriorating type HRC fuses with bases, catenary wires, nuts and bolts and other items shall be supplied by the contractor and shall be as per the RDSO specn.(as applicable). ARA terminals only shall be supplied by the Railways. | — | — | — | 55,375.8 | |
| — | 10.00 | — | — | ||
| Casting, concreting and curing of foundation and erection of app. Case half as per Drg, No (NR/S&T/ Con/2.8/97). A layer of 3mm of Bitumin compound has to be provided between foundation and location box to prevent ingress of water in the base of location box. All material such as cement, sand, aggregate & anchor bolts shall be supplied by the contractor.Contractor is required to execute all type of repair work of foundation if required during inserting the cable for termination. | — | — | — | 48,524 | |
| — | 10.00 | — | — | ||
| Preparation of App. Case half not involving wiring of relays: Preparation & fixing of bakelite hylum sheet 910x800x6mm and Backelite shelf 900x450x25mm duly fixed by angle iron piece of different size inside all the app. Cases. Hylum board shall be fixed on an angle iron frame of 25mmx25mmx3mm. Angle iron frame will be fixed in location boxes secured by nuts and bolts.This includes fixing of fuses, ARA terminal, fixing and jamming of cables with 2 inch thick salwood plank provided at the bottom. This will include opening, pasting and jamming armour of each cable in the hole drilled separately for each cable through the salwood plank and all cable entry points on location boxes, location huts, JBs relay room/battery room to be closed with suitable masonry Works covered with sand and plastering.Wiring description for terminal drawing of circuits, inside app. Case. Painting from out side as well inside with red oxide and aluminum paint is covered separately. Size of lettering will be 100mm or as per instructions of Engineer at site. All materials including Backelite shelf, hylum board, salwood plank, wire and wiring material, non deteriorating type HRC fuses with bases, catenary wires, nuts and bolts and other items shall be supplied by the contractor and shall be as per the RDSO specn. (as applicable). ARA terminals only shall be supplied by the Railways. | — | — | — | 34,520.1 | |
| — | 5.00 | — | — | ||
| Shifting of Apparatus case Single: It includes the Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringment as instructed by the railway repsentative at site. The work includes ensuring the safety of the signalling system, releasing the cables coils to give access for shifting/ turning the location boxes. Necessary masonary work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site, if the existing earth connection to the location boxes are disturbed the earth wires shall be the properly reconnected. (All materials required for the work shall be supplied by the contractor). | — | — | — | 23,777.2 | |
| — | 5.00 | — | — | ||
| Shifting of Apparatus case half: It includes the Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringment as instructed by the railway repsentative at site. The work includes ensuring the safety of the signalling system, releasing the cables coils to give access for shifting/ turning the location boxes. Necessary masonary work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site, if the existing earth connection to the location boxes are disturbed the earth wires shall be the properly reconnected. (All materials required for the work shall be supplied by the contractor | — | — | — | 15,736.5 | |
| — | 15.00 | — | — | ||
| Replacement of existing Location box duly removing existing equipments relays/Track feed chargers/batteries etc., disconnecting of cables, and re fixing the same after placing the new location box as per the instructions of Engineer in charge ( All the materials to be arranged by the contractor except LB, 6 way terminals, wire coils of all types and teak wood planks. a) Full Location Box | — | — | — | 33,145.35 | |
| — | 8.00 | — | — | ||
| Replacement of existing Location box duly removing existing equipments relays/Track feed chargers/batteries etc., disconnecting ofcables, and re fixing the same after placing the new location box as per the instructions of Engineer in charge ( All the materials to be arranged by the contractor except LB, 6 way terminals, wire coils of all types and teak wood planks. b) Half/Quarter Box. | — | — | — | 16,133.2 | |
| — | 300.00 | — | — | ||
| Painting of particulars of Glued Joint on rails/track circuit No. on TLJ boxes as per particulars issued by Engineer incharge. Before painting on surface of the Glued Joint Rails/TLJ boxes shall be cleaned throughly. Painting shall be done with approved quality of standed paints like Asian/Johnson/Nicholas /Berger etc., All the men and materials shall be arranged by the contractor the colours scheme shall be as per the instructions of Engineer incharge. | — | — | — | 32,532 | |
| — | 10.00 | — | — | ||
| Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This include supply of paints of Asian Paints/Nerolac / Dulux / Berger make. (Full Apparatus Case). Inspection:Consignee | — | — | — | 1,164.7 | |
| — | 20.00 | — | — | ||
| Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This include supply of paints of Asian Paints/Nerolac / Dulux / Berger make.(Half Apparatus Case) Inspection: Consignee. | — | — | — | 1,597.2 | |
| — | 10.00 | — | — | ||
| Concreting unschduled items in concrete of 1:3:6 ratio in cement, coarse sand and aggregate 25mm at different places in the yard and plastering top in fine plaster of 1:4 cement sand ratio. It also includes the excavation of earth as required at site and as per instruction of site incharge. The volume in cubic metres shall include the volume occupied by any CI foundation, trestle, MS angle or flat or GI pipe required to be embedded in the casting. Cement coarse sand and aggregate 25mm are to be supplied by the contractor. | — | — | — | 38,219.3 | |
| — | 200.00 | — | — | ||
| Earth work for excavation and refilling around location boxes and signals etc. where necessary including 50M lead and 1.5M lift. The lead is to be measured from centre of gravity of location to the centre of filling and lift from main ground level. The earth work should be well rammed including breaking of clods, levelling and dressing etc. as per instruction of Engineer at site. | — | — | — | 32,602 | |
| — | 10.00 | — | — | ||
| Brick work with well burnt bricks in foundations and plinths with cement and sand (ordinary) mixture of 1:4 ratio. All material is to be supplied by the contractor. (Inspection: Engg. representative.) | — | — | — | 26,444.4 | |
| — | 20000.00 | — | — | ||
| Loading, Leading & unloading of materials from store to another store as per instruction of consignee. All the material to be transported carefully without damage. Contractor have to do proper stacking of material and prepare list of material. | — | — | — | 1,11,400 | |
| — | 250.00 | — | — | ||
| Supply of insulation for 'L' bracket for IRS type point machine fitting Consisting of Insulation plate- 01 No., Ferrules- 2 Nos. Washers- 4 Nos. (Material Nylon 66).as per RDSO spec IRS- 23 and S-40 with latest amendment. Inspection by consignee | — | — | — | 72,660 | |
| — | 200.00 | — | — | ||
| Supply of insulation for 'P' bracket for IRS type point machine fitting consisting of Insulation plate- 01 No. , Ferrules- 2 Nos. Washers- 4 Nos. material nylon 66 as per RDSO spec IRS- 23 and S-40 with latest amendment. Inspection by Consignee. | — | — | — | 1,48,256 | |
| — | 350.00 | — | — | ||
| Supply of William stretcher bar insulation set suitable for ground connection RDSO Drg n. T-1.367, T-10368, T-10384 to IRS-23 and S-40 with latest amendment completed with nut bolts etc..The material should be procured from RDSO approved firm. Inspection by Consignee | — | — | — | 1,36,269 | |
| — | 250.00 | — | — | ||
| Supply of Gauge tie plate (GTP) insulation as per RDSO Drg.no. Plate T-10372/Alt or latest . 2,T-10371/Alt.2 ,T-10368/Alt. and to IRS S-23 and S-40.Inspection by Consignee. | — | — | — | 68,365 | |
| — | 10.00 | — | — | ||
| Supply and installation of 25 W Gate hooter as per spec. no-SDH 25 Ahuja make and as per the instructions of railways representative at site . It should be fitted inside MS Sheet box of min 20 gauge on suitable post. Inspection by Consignee. | — | — | — | 12,952 | |
| — | 200.00 | — | — | ||
| Provision of bonding with GI Wire/Cable pieces for track jumper & fish plate joint bonds. This will include drilling of 7.1 mm dia holes in rails (4 Nos.) and provision of two jumpers for each bond, clipping of bonds etc. as tool as per instruction of railway engineer at site including supply of GI wire and channel pin single grove, galvanized, 7mm suitable for 4mm dia bonding wire as per IRS Spec No.17 & 69/M with latest amendment. However cable piece will be provided by railways if required. | — | — | — | 12,536 | |
| — | 100.00 | — | — | ||
| Supply of FRP type TLJB as per drawing SA 20101/M made of FRP material (FRP material conforming to RDSO/SPN/151/97 or latest) complete with 450 mmlong 25 mm dia pipe. Inspection-Consignee | — | — | — | 1,11,067 | |
| — | 100.00 | — | — | ||
| Fixing of track lead junction box (TLJB) due to repositioning of old TC as per Drg. No. NR/S&T/CON/3.2/97. This also include erection of track lead junction box & terminating the cable. The concrete foundation for fixing angle iron of TLJB shall be casted in cement , aggregate and sand mixture of 1:3:6 ratio. This includes excavating ramming , curing and plastering of foundation with mixture of 1:4 ratio. Cement , sand , aggregate Iron angle , nuts & bolts are t be supplied by the contractor. | — | — | — | 30,819 | |
| — | 200.00 | — | — | ||
| Replacement of Jumper wire on each side existing double hole as per instruction of railway engineer at site. | — | — | — | 17,868 | |
| — | 200.00 | — | — | ||
| Painting of two coats of synthetic enamel paint over one coat of primer on the following after scraping & cleaning surface wherever necessary with contractor's own supply of paints.Wherever required contractor shall apply coating of epoxy paint alsoas per instructions of site-in-charge. Epoxy paint will be supplied by Railways.NOTE:- The paint and primer should be from Asian Paints/ Nerolac / Dulux /Berger. The primer / enamelpaints (Aluminum synthetic, blackenamel, brilliant white and yellow) will be as per (IS 5660 of 1970) /(IS 2932 of 1974). Apparatus Case Full Size. (Outside & inside) | — | — | — | 94,922 | |
| — | 100.00 | — | — | ||
| Painting of two coats of synthetic enamel paint over one coat of primer on the following after scraping & cleaning surface wherever necessary with contractor's own supply of paints.Wherever required contractor shall apply coating of epoxy paint also as per instructions of site-in-charge. Epoxy paint will be supplied by Railways. NOTE:- Thepaint and primer should be fromAsian Paints/ Nerolac / Dulux /Berger. The primer / enamelpaints (Aluminum synthetic, blackenamel, brilliant white and yellow) will be as per (IS 5660 of 1970) /(IS 2932 of 1974) Apparatus Case Half Size. (Outside & inside) | — | — | — | 35,072 | |
| — | 50.00 | — | — | ||
| Supply of Track feed resistance (with phenolic moulded base) 30 ohm to suit RDSO Drg no. SA-20161-66/M or latest. Inspection by- Consignee. | — | — | — | 38,082.5 | |
| — | 20.00 | — | — | ||
| Supply and Installation of VF tapping & termination transformers 2T/1120:470 Ohm as per IRS-TC-76/2021 or latest amendments (round type) (Inspection : Consignee) | — | — | — | 38,265 | |
| — | 285.00 | — | — | ||
| Supply of glass fuse 0.63A/1A/2A/4A/6A/10A/16A each suitable for jyoti control panel or similar. (Inspection: Consignee) | — | — | — | 8,384.7 | |
| — | 1000.00 | — | — | ||
| Supply of round head type non-deteriorating type low voltage cartridge fuse as per RDSO Specn.No.IRS:S-78/92 or latest and Capacity - 2/4/6/10A/16A/20A Amp. (material will be supplied only from approved vendors of RDSO).Inspection- RDSO | — | — | — | 57,160 | |
| — | 23.00 | — | — | ||
| Supply of GI boom as per RDSO Drg-S-11/600 2nd section confirming to RDSO/SPN/208/2012 (ver 2.0) or latest as per technical specification attached. Inspection- consignee | — | — | — | 1,24,525.22 | |
| — | 23.00 | — | — | ||
| Supply of GI boom as per RDSO Drg-S-11/600 3rd section confirming to RDSO/SPN/208/2012 (ver 2.0) or latest as per technical specification attached. Inspection- consignee | — | — | — | 1,17,971.37 | |
| — | 100.00 | — | — | ||
| Supply of PVC channels /Conduit pipes with fixing accessories of the following size :- PVC conduit pipe 1" dia, Inspection : Consignee | — | — | — | 3,205 | |
| — | 100.00 | — | — | ||
| Fixing of 1"/2" PVC channel/conduit pipe 1" dia on proper clamps and screws and indoor cable laying as per instruction by Site Engineer | — | — | — | 1,126 | |
| — | 50.00 | — | — | ||
| Fabrication, Supply and fixing of retro reflective P/G/C markers with complete fittings as per approved Drg. No. NR/S&T/CON/6.2/97 or latest. All material required for the job such as MS sheet, MS angle. Nut and bolts, paint and painting materials will be supplied by the Contractor. The P and G markers shall be as per Drg. No.S 23456(Adv) & SA 23477(Adv) or latest respectively. Inspection by- Consignee for supply portion. | — | — | — | 32,052.5 | |
| — | 50.00 | — | — | ||
| Refilling of CO2 type fire extinguisher, 4.5 k.g. cap. The extinguisher shall be filled with high purity CO2 gas conforming to IS:307 Including replacement of washer. The date of refilling & due date of expiry shall also be written on the fire extinguisher. | — | — | — | 38,060.5 | |
| — | 10.00 | — | — | ||
| Engaging mechanical excavators like JCB or other machineries for regarding and leveling the formation, Dismantling any infringing structures, clearing and removing debris etc., with all lead and lifts etc., complete and as per the instruction of railway representative at site. | — | — | — | 10,587.1 | |
| — | 5.00 | — | — | ||
| Supply & Installation of lightening & surge arrestors Indicative type of Class B & Class C suitable for single phase power supply in TT (Earth to earth) net work as per amdt 5 of RDSO Specification RDSO/ SPN/ 165/ 2012 (Ver.3) or latest & as recommended by RDSO vide letter No. STS/E/IPS/Genl dt. 27/1/2006. (RDSO Spec no.RDSO/TC/98/2011/Rev 0.0 ). Installation & commissionig of above Class B & Class C arrestors, These din rail mountable devices along with a 63 amp HRC fuse & fuse base shall be fixed in a wall mountable cabinet of minimumsize of 250mm (w) x 450mm (h) x 150mm (d). This box shall be made using Fire retardent fibre box/MS sheet steel of 20 gauge or better with IP 31 protection & powder coating. A door knob shall be provided to open the front door to asses the fuse. provision shall also be provided to view the working condition of class "C" arrestors from the front side of the cabinet. All the internal power wiring shall be made using aminimum of 10 sq mm pvc cable & termination shall be suitable for connecting 16 sq mm copper cable. The PF contact of Class C arrestor shall also be wired using aminimum cable of 2.5 sqmm & terminated on suitable terminal block. The Earth cable shall be connected to the equipottential bus bar using an insulated Cadmium bronze cable of 3/16 inch as per RDSO specification IRS-S:103-2004 using exothermic welding .All the material used for exothermic welding will be of RDSO approved/recommended make & all the tools & Tackles required shall be arranged by contractor only. Inspection : Consignee | — | — | — | 1,70,075.7 | |
| — | 200.00 | — | — | ||
| Maintenance of signalling gears required for the execution of track machines such as unimate , MP-2007, CSM, DUMETC,BCM, SRM and any other track maintenance machine work includes:-a) Proper dressing of Track Leads jumpers/removing & re-fixing of axle counter track devices as required by Railway representative at site before and after commencing of Unimate, MP- 2007, CSM, DUMETC, BCM, BRM & SRM etc machine.This includes replacement of defective jumpers.Bonding etc.Jumper/Bonding will be provided by Railway.b) Dismantling & Re-Fixing Turn out,Installation and testing of rodding set for point machines and point machine as per direction of railway representative at site.(c) All damaged cable due to unimate, MP-2007 CSM, DVO METIC, BCM SRM and any other Track maintenance machine work should be meggered properly and it required, should be replaced by the contractor as directed by railways representative at site.Cable will be supplied by railway. (Machine Days=Numbers) | — | — | — | 7,40,926 | |
| — | 2.00 | — | — | ||
| Supply ,Installation and commissioning of 4 Channel Voice Data Recording and Processing Unit (VDRPU). Inspection- RITES | — | — | — | 6,69,992.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC correction ACS 7 to 10
ATTACHMENT
GCC_April-2022_1.pdf
ATTACHMENT
ACSGCC22-231to6.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
Tender doc
ATTACHMENT
GCCAdvanceCorrectionSlipno7-10.pdf
ATTACHMENT
TD-10-2026-27CTR-TTRADSTE-AYC.pdf
ATTACHMENT
TD-10-2026-27CTR-TTRADSTE-AYC_1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .