SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 24 25 BM Dn Unit III ESP Outlet duct A B Pass Patch up welding work for damaged flue gas duct portions from ESP Outlet to before ID fan inlet during annual overhaul for the year 2024 25
2024_EB_453376_1
CE SE MI NCTPS I 60 24 25
Open Tender
Power/Energy Projects/Products
Works
20 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,000
Yes
16 Apr 2025
12 Jun 2024
27 Jun 2024
12 Jun 2024
26 Jun 2024
12 Jun 2024
Amount
MS Plate 6 mm thick, sail Hard / equivalent Including Loading, transportation & Unloading. Manufacture test certificate shall be furnished.(Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of LRB wool, Iron & steel material and as per the direction of Engineer in charge the materials will be supplied by TANGEDCO available at stores during execution of works)
Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from ESP Outlet to before ID fan inlet area. Including cost of consumables and T&P’s.
Cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate, transporting & devoluting scrap to Central Stores. Including consumables and T&P’s.
Transporting of 6 mm M.S / Checkered plates from central stores to boiler area cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout plates above 1.5 meter level and welding the same at ESP Outlet to before ID fan inlet. Including cost of consumables and T&P’s. (The Required Iron & Steel material is under Contractor Scope)
Welding eroded initial welding joints in the flue gas duct at ESP Outlet to before ID fan inlet area. Including cost of consumables and T&P’s.
Removing the existing eroded duct supports, supports for FG duct area and transporting of new pipes/Angles from Central Stores / NCTPS, cutting into required size leading, lifting, positioning and welding at ESP Outlet to before ID fan inlet. Including cost of consumables and T&P’s. (The Required Materials will be supplied by TANGEDCO)
ATHMIKA ENTERPRISES (BID ID -1069894)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .