Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 CrAdmitted-Finance | ₹28.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹29.6 CrAdmitted-Finance CS 51 ANSAL PLAZA 1 FLOOR SEC 1 VAISHALI GHAZIABAD UTTAR PRADESH 201 010 | ₹29.6 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| Sl No | Description | Qty | Unit | JCC INFRAPROJECTS PVT. LTD. L1 | SNS INFRACON PVT. LTD. L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and fixing C.P. brass bib cock with automatic sensor discharge system | 70 | Nos | - | - |
| 2.00 | Providing & Fixing for 1 no.Stretcher elevator to be furnished and erected in accordance with the following details: (Including 1 year warranty)
LOAD: 884 Kg (13 Pass.)
TRAVEL: LG+G+4 = 06 stop
Control & operation: microprocessor base control systems+V3F
STOP & openings: 06 Stops & 03 Opening.
CAR DESIGN : S.S Cabin and false Ceiling with multi reflecting in direct lighting arrangement centrally placed motor type Blower with circular air diverter, integral car operating panel luminous button & PVC flooring
Car door : S.S automatic centre opening door.
Clear Inside shaft(Required) = 1500mm *2450 mm
Clear Inside shaft(Available) = 2000 mm * 4000 mm
Machine Position: Directly placed above the top of the hoist way
Special Features : a) Call Register type Micro push button, b) Blower switch in Car (automatic). c) Fireman Switch at Main Landing. d) Emergency Alarm. VV3F Motor Sharp 7.7 kw Speech System. ARD System
Make with schindler/Otis/escon or equivalaent | 1 | Nos | - | - |
| 3.00 | Providing & Fixing for 1 no. Passenger elevator to be furnished and erected in accordance with the following details: (Including 1 year warranty)
LOAD: 650 Kg (8 Pass.)
TRAVEL: LG+G+2= 04 stop
OPERATION:Single Push Button
CAR DESIGN: S.S Cabin and false Ceiling with multi reflecting in direct lighting arrangement centrally placed motor type Blower with circular air diverter, integral car operating panel luminous button & PVC Flooring.
POWER SUPPLY:415 Volts, 3 Phase, 50 Cycles 5%
Special Features: a) Call Register type Micro push button, b) Blower switch in Car (automatic). c) Fireman Switch at Main Landing. d) Emergency Alarm.(e) V3F Fuzi (f) Motor Sharp 7.5 HP (g) Rope 10 mm. make Usha Martin 3 Nos. (h) Speech System. (i) A.R.D.System | 1 | Nos | - | - |
| 4.00MEDICAL GAS PIPELINE SYSTEM | |||||
| 4.01 | Supply, Installation, Testing and Commissioning of fully Oxygen Manifold as per technical specifications. The cylinders shall not be included in the quoted price. Make- Aktiv/PSPL/NSP 15+15 Cylinder | 1 | Set | - | - |
| 4.02 | supply, Installation testing and commissioning of Fully Automatic Oxygen Control System as technical specifications. as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.Make- Beacon Medaes/ Delta P/ Greggerson | 1 | Set | - | - |
| 4.03 | Supply, Installation, testing and commissioning of Emergency Oxygen Supply System as per technical specifications. The cylinders shall not be included in the quoted price. Make- Aktiv/PSPL/NSP, 8+8 Cylinder | 1 | Set | - | - |
| 4.04 | Supply installation, testing and commissioning of oxygen flow meter with humidifier bottle 0-15Litres, and CE marked under Medical Directive 93/42/EEC Make- Aktiv/PSPL/NSP | 332 | No. | - | - |
| 4.05 | Supply,Installation, testing and commissioning of Gas outlet points with Probe for Oxygen, Nitrous Oxide, Air, & Vacuum as per technical specification as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.Make- Beacon Medaes/ Delta P/ Greggerson, for Oxygen | 552 | No. | - | - |
| 4.06 | Supply,Installation, testing and commissioning of Gas outlet points with Probe for Oxygen, Nitrous Oxide, Air, & Vacuum as per technical specification as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.Make- Beacon Medaes/ Delta P/ Greggerson, for Compressed Air ( 4 Bar ) | 220 | No. | - | - |
Tender Value
₹26.8 Cr
EMD Value
₹53.7 L
Closing Date
13 Jul 2020, 6:00 pmClosed
Chief Executive Officer, ASCL
ASCL Office, Ajmer
As per RFP
2020_ASCL_186033_1
ASCL/NIT43/2020-21/978_1
Open Tender
Civil Works
730 days
Ajmer
As per RFP
2 documents required · 2 mandatory
₹10,000
Yes
CEO, ASCL
₹53.7 L
ASCL Office, Ajmer
4 Aug 2020
11 Jun 2020
15 Jul 2020
11 Jun 2020
13 Jul 2020
11 Jun 2020
17 Jun 2020
Amount
Providing and fixing C.P. brass bib cock with automatic sensor discharge system
Providing & Fixing for 1 no.Stretcher elevator to be furnished and erected in accordance with the following details: (Including 1 year warranty) LOAD: 884 Kg (13 Pass.) TRAVEL: LG+G+4 = 06 stop Control & operation: microprocessor base control systems+V3F STOP & openings: 06 Stops & 03 Opening. CAR DESIGN : S.S Cabin and false Ceiling with multi reflecting in direct lighting arrangement centrally placed motor type Blower with circular air diverter, integral car operating panel luminous button & PVC flooring Car door : S.S automatic centre opening door. Clear Inside shaft(Required) = 1500mm *2450 mm Clear Inside shaft(Available) = 2000 mm * 4000 mm Machine Position: Directly placed above the top of the hoist way Special Features : a) Call Register type Micro push button, b) Blower switch in Car (automatic). c) Fireman Switch at Main Landing. d) Emergency Alarm. VV3F Motor Sharp 7.7 kw Speech System. ARD System Make with schindler/Otis/escon or equivalaent
Providing & Fixing for 1 no. Passenger elevator to be furnished and erected in accordance with the following details: (Including 1 year warranty) LOAD: 650 Kg (8 Pass.) TRAVEL: LG+G+2= 04 stop OPERATION:Single Push Button CAR DESIGN: S.S Cabin and false Ceiling with multi reflecting in direct lighting arrangement centrally placed motor type Blower with circular air diverter, integral car operating panel luminous button & PVC Flooring. POWER SUPPLY:415 Volts, 3 Phase, 50 Cycles 5% Special Features: a) Call Register type Micro push button, b) Blower switch in Car (automatic). c) Fireman Switch at Main Landing. d) Emergency Alarm.(e) V3F Fuzi (f) Motor Sharp 7.5 HP (g) Rope 10 mm. make Usha Martin 3 Nos. (h) Speech System. (i) A.R.D.System
MEDICAL GAS PIPELINE SYSTEM
Supply, Installation, Testing and Commissioning of fully Oxygen Manifold as per technical specifications. The cylinders shall not be included in the quoted price. Make- Aktiv/PSPL/NSP 15+15 Cylinder
supply, Installation testing and commissioning of Fully Automatic Oxygen Control System as technical specifications. as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.Make- Beacon Medaes/ Delta P/ Greggerson
Supply, Installation, testing and commissioning of Emergency Oxygen Supply System as per technical specifications. The cylinders shall not be included in the quoted price. Make- Aktiv/PSPL/NSP, 8+8 Cylinder
Supply installation, testing and commissioning of oxygen flow meter with humidifier bottle 0-15Litres, and CE marked under Medical Directive 93/42/EEC Make- Aktiv/PSPL/NSP
Supply,Installation, testing and commissioning of Gas outlet points with Probe for Oxygen, Nitrous Oxide, Air, & Vacuum as per technical specification as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.Make- Beacon Medaes/ Delta P/ Greggerson, for Oxygen
Supply,Installation, testing and commissioning of Gas outlet points with Probe for Oxygen, Nitrous Oxide, Air, & Vacuum as per technical specification as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.Make- Beacon Medaes/ Delta P/ Greggerson, for Compressed Air ( 4 Bar )
Supply,Installation, testing and commissioning of Gas outlet points with Probe for Oxygen, Nitrous Oxide, Air, & Vacuum as per technical specification as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.Make- Beacon Medaes/ Delta P/ Greggerson, For Vacuum
Supply installation testing and commissioning of High pressure tubes duly colour coded for oxygen , Nitrous Oxide Compressed air and vacuum as per technical specification and as per HTM/ ISO 7396/ NFPA-99 Standard and CE marked.Make- Aktiv/PSPL/NSP
Supply installation testing and commissioning of Low pressure tubes duly colour coded for vacuum as per technical specification and as per HTM/ ISO 7396/ NFPA-99 Standard and CE marked.Make- Aktiv/PSPL/NSP
Supply,Instllation testing and commissiong of Medical Grade Copper Piping BSEN : 13348 Lloyd's Certified as per technical specification Make- Rajo/ Mehta Tube, 76mm ODX1.5mm thick
Supply,Instllation testing and commissiong of Medical Grade Copper Piping BSEN : 13348 Lloyd's Certified as per technical specification Make- Rajo/ Mehta Tube, 54mmODX1.2mm thick
Supply,Instllation testing and commissiong of Medical Grade Copper Piping BSEN : 13348 Lloyd's Certified as per technical specification Make- Rajo/ Mehta Tube, 42mm ODX1.2mm thick
Supply,Instllation testing and commissiong of Medical Grade Copper Piping BSEN : 13348 Lloyd's Certified as per technical specification Make- Rajo/ Mehta Tube,28mmODX 0.9mm thick
Supply,Instllation testing and commissiong of Medical Grade Copper Piping BSEN : 13348 Lloyd's Certified as per technical specification Make- Rajo/ Mehta Tube, 22mmODX 0.9mm thick
Supply,Instllation testing and commissiong of Medical Grade Copper Piping BSEN : 13348 Lloyd's Certified as per technical specification Make- Rajo/ Mehta Tube, 15mm ODX0.9mm thick
Supply,Instllation testing and commissiong of Medical Grade Copper Piping BSEN : 13348 Lloyd's Certified as per technical specification Make- Rajo/ Mehta Tube, 12mm ODX0.7mm thick
Supply, installation, testing and commissioning of Medical Air System complete with all aspects(Make- Anesta Iwata/IR/ FSCurtis)
Supply, installation, testing and commissioning of Medical Vacuum System complete with all aspects(Make- Anesta Iwata/IR/ FSCurtis)
Ward Vacuum unit complete with vacuum regulator, jar for collection of 1000 ml and bracket for collection bottle. CE marked under Medical Directive 93/42/EEC Make- Aktiv/PSPL/NSP
Supply, Installation, testing and commissioning of Area Valve Service Unit (Alarms + Valve Box) as per Technical Specification. as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.The Isolation Valves used for the shall be degreased for oxygen use Make- Beacon Medaes/ Delta P/ Greggerson 2 Gas Services
Supply, Installation, testing and commissioning of Area Valve Service Unit (Alarms + Valve Box) as per Technical Specification. as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed.The Isolation Valves used for the shall be degreased for oxygen use Make- Beacon Medaes/ Delta P/ Greggerson 3 Gas Services
Supply, Installation, testing and commissioning of Medical Gas Master Alarm Panel as per tender specifications as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed. Make- Beacon Medaes/ Delta P/ Greggerson
supply installation testing and commissioning of Horizontal Bed Head Panels provision for Gas outlets duly CE marked under Medical Directive 93/42/EEC Make- Aktiv/PSPL/NSP 1200mm
supply installation testing and commissioning of Horizontal Bed Head Panels provision for Gas outlets duly CE marked under Medical Directive 93/42/EEC Make- Aktiv/PSPL/NSP 1800mm
Isolation Valve , Degreased for oxygen Use as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed. Make- Beacon Medaes/ Delta P/ Greggerson 54mm
Isolation Valve , Degreased for oxygen Use as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed. Make- Beacon Medaes/ Delta P/ Greggerson 42mm
Isolation Valve , Degreased for oxygen Use as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed. Make- Beacon Medaes/ Delta P/ Greggerson 28mm
Isolation Valve , Degreased for oxygen Use as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed. Make- Beacon Medaes/ Delta P/ Greggerson 22mm
Isolation Valve , Degreased for oxygen Use as per HTM/ ISO 7396/ NFPA-99 Standard and CE certified under Medical Directive Notified Body with 4 digit no or UL/ ATL listed. Make- Beacon Medaes/ Delta P/ Greggerson 15mm
Control Panel for Compressed Air System and Vacuum System Make- Indigenous
Supply, Installation, Integration, Testing, & Commissioning of 4 MP Fixed Lens Network IR Bullet Camera with SD Card as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Supply, Installation, Integration, Testing, & Commissioning of 4 MP Vari-focal Motorized Bullet camera with SD card as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Supply, Installation, Integration, Testing, & Commissioning of 4 MP Fixed Lens Network IR Dome Camera with SD Card as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Supply, Installation, Integration, Testing, & Commissioning of 64 Channel H.265 Network Video Recorder upto 8 SATA III as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Supply, Installation, Integration, Testing, & Commissioning of 16 Port Gigabit PoE Switch as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Supply, Installation, Integration, Testing, & Commissioning of 8 Port Gigabit POE Network Switch as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Supply, Installation, Integration, Testing, & Commissioning of 6 TB HDD for Video Recorder as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Supply, Installation, Integration, Testing, & Commissioning of 42"Led Monitor as per requirement, scope of work, technical specification & complete in all respect as per the satisfaction of Engineer in Charge with 3 years onsite OEM support.
Heating, ventilation, and air conditioning
Supply, Installation, testing and commissioning of variable refrigerant Flow ( VRF) system, suitableMaximumtemperature comprising of the following and complete as per Combination of hermetically sealed Scroll Inverter Compressor suitable for operation on R-410A complete with high/low pressure cut-outs, oil pressure failure switch, fan motor, safety thermostat, over current relay, fusible plugs, fuses etc. and suitable for operation on 380-440V, 3 phase, 50 Hz A.C. supply. Matching air cooled condenser with copper tubes and aluminum fins duly covered by anti-corrosion and ydrophilic resin film. Oil separator suitable for the long refrigerant piping. Lot - Accumulator, liquid and gas shut-off valves and solenoid valves/modulation valve with fittings to interconnect compressor, condenser and evaporator coils. Interconnecting refrigerant pipe work with (19mm/13 mm thick) closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room shall be properly supported with MS hanger. Wall thickness, supports spacing, jointing, testing of copper pipes as per ASHRAE/ISHRAENORMS. 1 No Each for suction line , 1 no each for liquid line ( = 1set ) if not included in machine. Providing and fixing ac drain rigid PVC piping complete with fittings, supports as per specifications and duly insulated with 6 mmthick closed cell nitrile rubber insulation. Acoustic Insulation Supply and installation of 10mm thick, Open Cell, Nitrile Rubber acoustic insulation of density 140-180Kg/m3, with Anti microbial properties as per specifications. SITC of Site Fecticated ducting made from GSS of class VIII & fabricated as per IS:655 and as per approved drawings & designs including the cost of hangers, supports , angle , expansion fasteners , closed cell neoprene gasket T&P etc. as required of following gauge: Thermal Insulation (Internal ducting): Supply and installation of 19mm thick, closed cell elastomeric nitrile rubber for supply air duct , complete with mechanical/UV protection and duct supports as per specifications. Complete supply and installation in each and every spects for required places.
Outdoor Units-Heat Pump (R410A): ODU - 14HP
Outdoor Units-Heat Pump (R410A): ODU - 16HP
Outdoor Units-Heat Pump (R410A): ODU - 18HP
Outdoor Units-Heat Pump (R410A): ODU - 20HP
Indoor Units Concealed Type 4.12 TR.
Indoor Units Concealed Type 4.6 TR.
Indoor Units Concealed Type 6.6 TR.
Indoor Units Concealed Type 8.25 TR.
Indoor Units Hi-Wall 1.3 TR.
Indoor Units Hi-Wall 1.65 TR.
Indoor Units Hi-Wall 2.08 TR.
REFNET JOINTS
REMOTE CONTROLLER
BHF JOINT
Supply & Labour Part (VRV) Installation, testing and commissioning of Indoor units and outdoor units fittings (imported Y -Joints & header etc.) remote controls of indoor units as per specifications and drawing. Outdoor Units-Heat Pump ODU - 14HP
Supply & Labour Part (VRV) Installation, testing and commissioning of Indoor units and outdoor units fittings (imported Y -Joints & header etc.) remote controls of indoor units as per specifications and drawing. Outdoor Units-Heat Pump ODU - 16HP
Supply & Labour Part (VRV) Installation, testing and commissioning of Indoor units and outdoor units fittings (imported Y -Joints & header etc.) remote controls of indoor units as per specifications and drawing. Outdoor Units-Heat Pump ODU - 18HP
Supply & Labour Part (VRV) Installation, testing and commissioning of Indoor units and outdoor units fittings (imported Y -Joints & header etc.) remote controls of indoor units as per specifications and drawing. Outdoor Units-Heat Pump ODU - 20HP
Indoor Units Concealed Type 4.12 TR.
Indoor Units Concealed Type 4.6 TR.
Indoor Units Concealed Type 6.6 TR.
Indoor Units Concealed Type 8.25 TR.
Indoor Units Hi-Wall 1.3 TR.
Indoor Units Hi-Wall 1.65 TR.
Indoor Units Hi-Wall 2.08 TR.
Supply of Refrigerant Gas for extra topping of VRV System: R410A Gas Charging in VRV System
Refrigerant Piping: Supply of interconnecting refrigerant pipe work with (19mm/13mm thick) close cell nitrile rubber tubular insulation between each set of indoor and outdoor units as per specifications, all piping inside the room shall be properly supported with MS hanger.
Drain Piping: Supply of rigid PVC piping complete with fittings, supports as per specifications and duly insulated with 6 mm thick closed cell nitrile rubber insulation. 25 mm dia
Drain Piping: Supply of rigid PVC piping complete with fittings, supports as per specifications and duly insulated with 6 mm thick closed cell nitrile rubber insulation. 32 mm dia
Control & Transmission Wiring: Supply of control cum transmission wiring of 2 core x 1.00 sqmm copper in suitable conduits between indoor and from outdoor units to centralized controller.
Outdoor Stand
24G (0 to 750mm)
22G (750mm to 1500mm)
Supply of insulation of ducting with 6 mm thick closed cells
Supply of Canvas connection cloth.
Grilles / Diffusers: Supply of powder coated Extruded Aluminium Grilles with the approved drawing and specification: Aluminium linear continuous Grilles
Duct Acoustic Lining: Supply of duct acoustic lining with Glass wool insulation, Covered with perforated Al 30 G, sheet, nuts, bolts etc complete as per specifications. 25 mm
REFNET JOINTS (Brazing)
BHF JOINTS (Brazing)
Bidder Name
Amount
JCC INFRAPROJECTS PVT. LTD.
SNS INFRACON PVT. LTD.
SNS INFRACON PVT. LTD.
SNS INFRACON PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
RFP_P.pdf
Tender Documents • 18.85 MB
BOQ_328871.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid