Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13 LAccepted-AOC | ₹13 L Quoted ₹13.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.0 LRejected-Finance | ₹13.0 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | B.Muttharasan L2 | MATHA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00EXTENSION FOR NEW PIPE THIRUTHURAIPOONDI KOOTU KUDINEER THITTAM TANK TO VELUR PANCHAYAT OFFICE NEAR TANK IN VELUR PANCHYAT | |||||
| 2.00 | Earth work excavation of and depositing on bank with intital leadof 10mtr. & initial liftof 2mtr inhard stiff clay stiff black cotton soils, stiff re earth, shales murrams, gravel stoney earathand darth mixed with 50% fair sized boulders and hard gravelly soils. | 1,877.4 | m2 | 329.73 ₹6.2 L | 329.73 ₹6.2 L |
| 3.00 | Supply & Devliery of PVC rigid pipes for potable water supply as per IS 4935/1988 and aa amended fro time to time with ISI marking of othe following sizes with necessary couplers or bel ended pipes as specified in ISI and the required quantity of solvent cement having the required woring pressure and for delivery at site of works including loading, unloading stacking and transit insurance charges etc.,complete (6kgs) 75MM | 2,980 | m3 | 101.7 ₹3.0 L | 101.7 ₹3.0 L |
| 4.00 | Refilling with excavated earth (other than sand complying with standard specification for filling in trenches. | 2,006.03 | m4 | 45.85 ₹91,976.48 | 45.85 ₹91,976.48 |
| 5.00 | Conveyance of PVC rigid pipes and lowering into the trenchlaying to proper gradian and alignment, jointing PVC couplers with solvent cement and testing to required pressure including conveyance of water into one k.m. lead for filling in the pipes excluding cost of materials which will be supplied. | 2,980 | m3 | 23.53 ₹70,119.40 | 23.53 ₹70,119.40 |
| 6.00 | provision for Gi pipe charges | 16 | m3 | 605.7 ₹9,691.20 | 605.7 ₹9,691.20 |
| 7.00 | Provision for GI Pipe fixing charges | 1 | m3 | 5,000 ₹5,000 | 2,500 ₹2,500 |
| 8.00 | Provision for Name board charges | 1 | LS | 5,000 ₹5,000 | 4,000 ₹4,000 |
| 9.00 | Photographic charges | 1 | m13 | 1,500 ₹1,500 | 500 ₹500 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,98,970 ₹2.0 L | 1,98,160 ₹2.0 L |
Tender Value
₹13.2 L
EMD Value
₹13,200
Closing Date
10 Feb 2026, 4:00 pmClosed
Block Development Officer(B.Pt) Thiruthuraipoondi
Block Development Officer(B.Pt) Thiruthuraipoondi
Extension of New Pipeline to Velur Panchayat OHT
2026_RDTN_650834_1
801/2024/A2
Open Tender
Civil Works - Buildings
90 days
Block Development Office Thiruthuraipoondi
sdper tender documents
3 documents required · 3 mandatory
₹0
₹13,200
Yes
13 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
EXTENSION FOR NEW PIPE THIRUTHURAIPOONDI KOOTU KUDINEER THITTAM TANK TO VELUR PANCHAYAT OFFICE NEAR TANK IN VELUR PANCHYAT
Earth work excavation of and depositing on bank with intital leadof 10mtr. & initial liftof 2mtr inhard stiff clay stiff black cotton soils, stiff re earth, shales murrams, gravel stoney earathand darth mixed with 50% fair sized boulders and hard gravelly soils.
Supply & Devliery of PVC rigid pipes for potable water supply as per IS 4935/1988 and aa amended fro time to time with ISI marking of othe following sizes with necessary couplers or bel ended pipes as specified in ISI and the required quantity of solvent cement having the required woring pressure and for delivery at site of works including loading, unloading stacking and transit insurance charges etc.,complete (6kgs) 75MM
Refilling with excavated earth (other than sand complying with standard specification for filling in trenches.
Conveyance of PVC rigid pipes and lowering into the trenchlaying to proper gradian and alignment, jointing PVC couplers with solvent cement and testing to required pressure including conveyance of water into one k.m. lead for filling in the pipes excluding cost of materials which will be supplied.
provision for Gi pipe charges
Provision for GI Pipe fixing charges
Provision for Name board charges
Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_780397.xls
BOQ • 0.31 MB
velurtechbid.pdf
Tender Documents • 1.24 MB
Download all tender documents and submit your bid