| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
10 Jun 2025, 3:00 pmClosed
Block Development Officer,Kottur Block.
Block Development Office,Kottur Block.
.Construcytion of A D cremation shed at Appiyanthiruvasal Habitation in 83,Kulamanikkam Panchayat.
2025_RDTN_564144_1
RC7302025B1date27052025 P2 83Kulamanikkam
Open Tender
Civil Works - Roads
Item Rate
180 days
Kottur Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹4,000
Yes
18 Jun 2025
2 Jun 2025
10 Jun 2025
2 Jun 2025
10 Jun 2025
2 Jun 2025
Amount
1.Construcytion of A D cremation shed at Appiyanthiruvasal Habitation in 83,Kulamanikkam Panchayat.
Providing 250mm dia RCC pile hole using hand bore drill and RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Earthwork excavation in hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete Coloumn
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete, Sunshade,Roof Slab
RCC 1:11/2:3 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete For Tiebeam
Cement concrete 1:3:6 mix using 40mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials and all labour charges etc.,complete
Cement concrete 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Cost and supply and fabrication steel including cost and conveyance of all materials to site and all labour charges etc.,complete
Plastering in CM 1:3 mix using 10mm thick including cost and conveyance of all materials and all labour charges etc.,complete
Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials and all labour charges etc.,complete
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Provision for Chimney
Provision for Name Borad
GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S.Saker,Kottur (BID ID -1362227)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .