| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC AT APARNA NAGAR CHAULAGANJ P O NAYABAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹4.3 L Quoted ₹5.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.3 L−₹1.2 L (22.0%)Rejected-AOC | ₹4.3 L−₹1.2 L (22.0%) | L2 | Rejected-AOC Rejected |
| 3 | L2₹5.6 L+₹15,062.33 (2.75%)Rejected-AOC | ₹5.6 L+₹15,062.33 (2.75%) | L2 | Rejected-AOC Rejected |
Tender Value
₹5.0 L
EMD Value
₹5,100
Closing Date
6 Dec 2025, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of paver block road at Sachi Choudhury lane andfixing of RCC slabs over the drain Denatl Clinic lane in Ward No.43.
2025_ORULB_121300_5
MC(CMC)CTC_Div-IIINo.24/25-26
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹5,100
Yes
8 Apr 2026
26 Nov 2025
10 Dec 2025
26 Nov 2025
6 Dec 2025
26 Nov 2025
Dismantling and removing old cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead.
Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of all labour, T&P etc. as per the direction of engineer in charge.
Providing & laying cement concrete of prop (1:4:8) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. Complete. To the required levels including cost, conveyance, royality and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer in charge
Providing & laying cement concrete of prop. (1:2:4) using 12mm size, screened, washed hard black crusher broken granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge.
Providing and laying 80mm thick factory made cement concrete interlocking faver block of M-40 grade bade by block making machine with strong vibratory compaction of approved size design & shape laid in required colur and pattern over and including 50mm thick thick compacted bed of coarse sand filling the joints with fine sand etc all complete as per direction of Enginer in charge.
R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour .
Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate).
Rigid smooth centering and shuttering for R.C.C work including false work and dismantling after casting including cost of all labour, materials, T&P required etc. as per the direction of Engineer in charge.
Remove excaveted earth from the site by mechanical means with loading and unloading the same within 5 kms lead as per direction of enginner in charge .
Labour engagement for placing of new pre cast RCC slab over the drain as per the direction of EIC.
Supplying fitting & Fixing of man hole chamber ring including cost of labour material T&P etc all complete as per the direction of EIC.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_567213.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_567213.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .