Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹9.7 L+₹82,906.98 (9.36%)Rejected-AOC | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | G Murali L1 | Raveendra g L2 |
|---|---|---|---|---|---|
| 1.00Construction of New 10000 Litter OHT at Kuttaikilanur Irular Colony in Vediyangadu Panchayat | |||||
| 2.00 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B | 33.29 | Cum | 845.13 ₹28,134.38 Lowest | 945 ₹31,459.05 |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand,watering,ramming and consolidation etc complete as directed by TWAD Bord officers | 1.23 | Cum | 1,722.03 ₹2,118.1 Lowest | 1,822 ₹2,241.06 |
| 4.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | 1.84 | Cum | 6,304.25 ₹11,599.82 Lowest | 6,404 ₹11,783.36 |
| 5.00 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete Raft | 3.68 | Cum | 10,799.81 ₹39,743.3 Lowest | 11,899 ₹43,788.32 |
| 6.00 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete Below 1.5m from GL | 2.48 | Cum | 10,984.39 ₹27,241.29 Lowest | 11,104 ₹27,537.92 |
| 7.00 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete 0m to 1.50m below GL | 1.08 | Cum | 10,984.39 ₹11,863.14 Lowest | 11,104 ₹11,992.32 |
| 8.00 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete 0m to 4.50m above GL | 2.16 | Cum | 11,074.29 ₹23,920.47 Lowest | 11,175 ₹24,138 |
| 9.00 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete 4.50 m to 7.32 m above GL | 2.85 | Cum | 11,251.29 ₹32,066.18 Lowest | 12,261 ₹34,943.85 |
| 10.00 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete 7.32 m to 10.98 m above GL | 4.72 | Cum | 11,428.29 ₹53,941.53 Lowest | 12,428 ₹58,660.16 |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
15 Sept 2025, 3:00 pmClosed
Project Director/Joint Director
DRDA Tiruvallur
Construction of 10000 liters OHT at Kuttai Keelanur Irular colony in Vediyangadu Panchayat of R.K.Pet Block Pac.22
2025_RDTN_597767_1
2974/2024/A3
Open Tender
Civil Works
Item Rate
120 days
RK.Pet Blcok
Refer Tender Document
5 documents required · 5 mandatory
₹0
₹9,000
Yes
DRDA Tiruvallur
8 Nov 2025
29 Aug 2025
15 Sept 2025
29 Aug 2025
15 Sept 2025
3 Sept 2025
3 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .