Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-Finance 255T SMARAT ASHOK NAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹14.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹14.8 LAccepted-Finance | ₹14.8 L | L2 | Accepted-Finance L2 |
| 3 | L3₹14.8 LAccepted-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹14.8 L | L3 | Accepted-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ARTIST BRO L3 | M/S YAMUNA EARTH MOVERS L2 | M/S CHANDRAPAL SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting Jhunds and Moonj With Disposal away From Site | 9,000 | sqm | 6 ₹54,000 | 20.3 ₹1.8 L | 20.23 ₹1.8 L |
| 2.00 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. By Pocklin/equivalent capacity 60 cum/hour | 37,509 | cum | 38 ₹14.3 L | 34.52 ₹12.9 L | 34.39 ₹12.9 L |
Tender Value
Refer Docs
EMD Value
₹51,000
Closing Date
11 May 2026, 5:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT12
2026_UPIDC_1145472_12
01/EE/2026-27
Open Tender
Civil Works
25 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹51,000
Yes
8 Jun 2026
6 May 2026
12 May 2026
6 May 2026
11 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Jhunds and Moonj With Disposal away From Site | 9,000 | sqm | - | - |
| 2 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. By Pocklin/equivalent capacity 60 cum/hour | 37,509 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_2141654.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid