GEMC-511687781222188
Awarded to DIPTIRANJAN ENTERPRISE
₹64.6 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Tilting of bath pallets | 639 / Tilting Of Bath Pallets | 8519 | 639 NO | 585.3 | 374,006.7 |
| Feeding of reject green and baked anode by forklift | 578 / Feeding Of Reject Green And Baked Anode By Forklift | 8519 | 578 NO | 292.65 | 169,151.7 |
| Operation Asst.in New bath system | 578 / Operation Asst. in New Bath System | 8519 | 578 NO | 809.68 | 467,995.04 |
| Deployment of Driver for operation of Tipper | 177 / Deployment Of Driver For Operation Of Tipper | 8519 | 177 NO | 1,170.61 | 207,197.97 |
| Feeding of bath by operating HPL | 639 / Feeding Of Bath By Operating HPL | 8519 | 639 NO | 292.65 | 187,003.35 |
| Miscellaneous jobs connected with butt system | 578 / Miscellaneous Jobs Connected With Butt System | 8519 | 578 NO | 877.97 | 507,466.66 |
| Housekeeping in New Bath system | 81542 / Housekepping | 8519 | 81,542 Meter | 3.76 | 306,597.92 |
| Deployment of Helper for tipper | 177 / Deployment Of Helper For Tipper | 8519 | 177 NO | 809.68 | 143,313.36 |
| Cleaning of waste material bin | 639 / Cleaning Of Waste Material Bin | 8519 | 639 NO | 585.3 | 374,006.7 |
| Transportation of loose debris | 204 / Transportation Of Loose Debris | 8519 | 204 Metric Tonne | 130.45 | 26,611.8 |
| Cleaning of Pits in New Bath system | 30 / Pit Cleaning | 8519 | 30 NO | 4,858.15 | 145,744.5 |
| Loosening of bath from spent anode | 7000 / Loosening Of Bath From Spent Anode | 8519 | 7,000 NO | 32.38 | 226,660 |
| Preparation of spent anode pallets | 639 / Preparation Of Spent Anode Pallets | 8519 | 639 NO | 292.65 | 187,003.35 |
| Transportation of bagged debris | 204 / Transportation Of Bagged Debris | 8519 | 204 Metric Tonne | 80.5 | 16,422 |
| Segregation, bagging and stacking | 578 / Segregation, Bagging And Stacking | 8519 | 578 NO | 1,619.37 | 935,995.86 |
| Cleaning of free space of Anode storage area | 164767 / Cleaning Of Free Space Of Anode Storage Area | 8519 | 164,767 Meter | 3.76 | 619,523.92 |
| Diesel or Lubricant filling | 639 / Diesel Or Lubricant Filling | 8519 | 639 NO | 219.49 | 140,254.11 |
| Bagging, stacking and shifting of carbon dust | 204 / Bagging, Stacking And Shifting Of Carbon Dust | 8519 | 204 Metric Tonne | 230.06 | 46,932.24 |
| Bath pallet preparation | 639 / Bath Pallet Preparation | 8519 | 639 NO | 438.97 | 280,501.83 |
| Cleaning and removal of bath from Tanker loading area | 10645 / Cleaning And Removal Of Bath From Tanker Loading Area | 8519 | 10,645 Meter | 3.76 | 40,025.2 |
| Operation of System from control room | 639 / Operation Of System From Control Room | 8519 | 639 NO | 877.97 | 561,022.83 |
| Operation of Additional Bath or Storage Mgm. | 426 / Operation Of Additional Bath Or Storage Mgm. | 8519 | 426 NO | 1,170.61 | 498,679.86 |