Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.3 LAdmitted-Finance | -1.00% | ₹41.3 L | L1 | Admitted-Finance |
| 2 | L2₹41.8 LAdmitted-Finance | -0.01% | ₹41.8 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical As per Doduments |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical As per Doduments |
Tender Value
₹40.4 L
EMD Value
₹81,000
Closing Date
7 May 2026, 3:00 pmClosed
Executive Engineer
Construction Division Lucknow-10, Neelgiri Complex, Indira Nagar, Lucknow.
Construction of Boundary Wall For Kasturba Gandhi Vidyalaya Sidhauli at District-Sitapur.(U.P.)
2026_UPHDB_1138523_1
442/AC-8/260 dated 06.04.2026
Open Tender
Civil Works
120 days
Sitapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,770
Executive Engineer, C.D. Lucknow-10
₹81,000
Yes
13 May 2026
17 Apr 2026
7 May 2026
17 Apr 2026
7 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil 0.30 m & Avobe (DSR -2.6.1) | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation (DSR -4.1.8) | - | CUM | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position specfied grade of reinforcement cement concrete, excluding the cost of centering, shuttering, finishing & reinforcement. All work up to plinth level. 1:1.5:3 (1 cement,1.5 coarse sand zone-iii,3 graded stone aggregate 20mm. (Nominal size) (DSR -5.1.2) | - | CUM | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(DSR -5.3) | - | CUM | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR -5.2.2) | - | CUM | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Centering,shuttering inluding strutting,proping etc. & removal of form for.-Foundations, footings, bases of columns, etc. for mass concrete.(DSR -5.9.1) | - | SQM | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Centering,shuttering inluding strutting,proping etc. & removal of form for.-Lintels, beams, plinth beams, girders, bressumers and cantilevers.(DSR -5.9.5) | - | SQM | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Centering,shuttering inluding strutting,proping etc. & removal of form for.-Columns, Pillars, Piers, Abutments, Posts and Struts.(DSR -5.9.6) | - | SQM | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class-75 in foundation & plinth in. Cement morter 1:4 (1 cement:4 coarse sand) (DSR -6.1.1) | - | CUM | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Brick work with common burnt clay (non modular) bricks of class-75 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR -6.4.1) | - | CUM | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2125715.xls
BOQ • 0.48 MB
2FinBW12.pdf
Tender Documents • 10.25 MB
1TechBW12.pdf
Tender Documents • 9.14 MB
Download all tender documents and submit your bid