Tender Value
Refer Docs
EMD Value
₹23.6 L
Closing Date
6 Oct 2026, 3:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
62 conditions · 8 needing a document upload
Mandatory in case Bid security amount is prescribed in STD Para 5.1.2 - The Bid Security shall be deposited in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure-XXXII and shall be valid for a period of 90days beyond the bid validity period. ( Click here to download Format)
In case the tenderer is (i)Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' - shall be exempted from payment of Bid security deposit and shall submit certified copy of the registration/ Valid document issued by DIPP (mandatory if applicable)
In case the tenderer is (iii) Labour Cooperative Societies - shall deposit only 50% of the Earnest Money Deposit and shall submit certified copy of the registration/ Valid document issued by the relevant Ministry/ Labour commission (mandatory if applicable).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall comply with the provisions of the Contract Labour (Regulation and Abolition) Act 1970 and the Contract Labour (Regulation and Abolition) Central Rules 1971 as modifed from time to time, wherever applicable and shall also indemnify the Railway from and against any claims under the aforesaid Act and Rules.
Provision of RUB of size 2x4.00m x2.50m at LC no. 140 (Kote Gate Phatak) and pedestrian Subway of size 4m x 2.5m at LC No. 141 (Sankhla Phatak) with covering and other ancillary Work in Bikaner-Lalgarh section over Bikaner division.
NWR-SC-BKN-3-2026-27~NWR
NWR-SC-BKN-3-2026-27
Open
Works - General
18 Months
Bikaner, Rajasthan
₹0
₹23.6 L
4 Sept 2026
4 Sept 2026
22 Sept 2026
184 items across 22 schedules · ₹11,91,45,351.5 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Provision of barricading with contractor's bamboos / ballies vertical post 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution the work and shall be removed in workman like manner on completion of work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be property of the Contractor. | of of the the | — | — | — | |
| 1 | Joining with strong nylon rope in one cross and one horizontal pattern minimum 5mm dia. | of RM | 860.00 | 97.13 | 83,531.8 |
| 2 | Shoring with 'Z' section MS sheet piles side by side in all kinds of mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the work as directed by engineer in-charge Note: Payment be made as per actual driven length of pile. | soil Sqm will | 8070.00 | 1,056.13 | 85,22,969.1 |
| Schedule total | ₹86,06,500.9 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
STDfinalNIT.pdf
ATTACHMENT
ApprovedlistofMakesBrands.pdf
ATTACHMENT
ActiontobetakenduringforConstructionofRUBsLHSsSubwaysandCareotbetakenduringAirPushingofRCCBox_compressed.pdf
ATTACHMENT
ConstructionofRUBbyAirPushingPullingMethodwithRHGirderJointlessConstruction.pdf
ATTACHMENT
CoreTestPermeabilityTestNDTinBridgeConcretework.pdf
ATTACHMENT
Ensuringthatsafetyfencingforconstructionworksisnotusedasobstructiontotrackbymiscreants11.03.2026.pdf
ATTACHMENT
GCC2022April.pdf
ATTACHMENT
GCCCorrectionSlipNo1.pdf
ATTACHMENT
GCCCorrectionSlipNo2.pdf
ATTACHMENT
GCCCorrectionSlipNo3.pdf
ATTACHMENT
GCCCorrectionSlipNo4.pdf
ATTACHMENT
GCCCorrectionSlipNo5.pdf
ATTACHMENT
GCCCorrectionSlipNo6.pdf
ATTACHMENT
GCCCorrectionSlipNo7.pdf
ATTACHMENT
GCCCorrectionSlipNo8.pdf
ATTACHMENT
GCCCorrectionSlipNo9.pdf
ATTACHMENT
GCCCorrectionSlipNo10.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo11_compressed.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf
ATTACHMENT
Correctedcompendiumofinstructiononsafetyatworkssite31.3.14.pdf
ATTACHMENT
SpecialConditionsofContractSCC.pdf
ATTACHMENT
AdditionalSpecialConditionsandConditionsofNSitems.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .