Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-AOC | ₹33.6 L Quoted ₹39.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹39.9 LRejected-AOC TUTICORIN | VIRUDHUNAGAR | TAMIL NADU | 626202 | ₹39.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BANUMATHI ENTERPRISES L1 | ARASU CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for Clearing the spilled and accumulated coal then & there in the conveyor floor, tail and head end area, deck sheet, walkways, below the return belt area of conveyor 49 (Except coal yard area between rail stoppers), 63, BFD 10B and BFD 6 - including cost of required consumables, hire charges for T&P's, lead & lift etc. complete. | 350 | Activity | 14,42,350 ₹17.0 L | 14,70,000 ₹17.3 L |
| 2.00 | Charges for Round the clock monitoring of the equipments of running conveyors 49, BFD 10B, 63 and BFD 6 like belt train up, condition of conveyor belt joint, oil level checking in gear boxes & fluid couplings, counter weight position, chute deflector and liner plate and noticing defects if any in the above conveyors - Attending daily routine preventive maintenance work during idle time of conveyors like, renewal defective / worn out idler, frames, damaged skirt rubbers, patch up welding works in the chutes, deck sheets, minor patch up on belt store drawal and devolution works - Including cost of all kind of required consumables, hire charges for T & P’s lead & lift etc complete. | 350 | Activity | 17,27,950 ₹20.4 L | 17,50,000 ₹20.6 L |
| 3.00 | Charges for assisting works for belt joint in slope conveyor 49, BFD 10B, 63 and BFD 6 including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler framesand skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete. | 4 | No. | 2,39,060 ₹2.8 L | 2,40,000 ₹2.8 L |
| 4.00 | Charges for assisting works for pulley lagging works in conveyor 49, BFD 10B, 63 and BFD 6 including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trail operation including T&P hire charges cost of consumables etc., complete. | 2 | No. | 1,19,530 ₹1.4 L | 1,20,000 ₹1.4 L |
| 5.00 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley / bend pulley and take up moveable pulley in conveyor 49, BFD 10B, 63 and BFD 6 including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete. | 2 | Operation | 1,89,976 ₹2.2 L | 1,92,000 ₹2.3 L |
| 6.00 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley / drive pulley in conveyor 49, BFD 10B, 63 and BFD 6 including arresting the conveyor belt lifting the counter weight and normalizing the system after completing bearing overhauling, trial operation including T&P hire charges and cost of consumables etc., complete. | 2 | Operation | 2,13,640 ₹2.5 L | 2,16,000 ₹2.5 L |
Tender Value
Refer Docs
EMD Value
₹27,800
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
CHP- Attending preventive maintenance and monitoring works to avoid breakdown in Conveyors-49, BFD-10B, 63 BFD-6
2025_EB_633180_1
CE/SE/MI/TTPS/27/2026-2027
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹27,800
Yes
23 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Charges for Clearing the spilled and accumulated coal then & there in the conveyor floor, tail and head end area, deck sheet, walkways, below the return belt area of conveyor 49 (Except coal yard area between rail stoppers), 63, BFD 10B and BFD 6 - including cost of required consumables, hire charges for T&P's, lead & lift etc. complete.
Charges for Round the clock monitoring of the equipments of running conveyors 49, BFD 10B, 63 and BFD 6 like belt train up, condition of conveyor belt joint, oil level checking in gear boxes & fluid couplings, counter weight position, chute deflector and liner plate and noticing defects if any in the above conveyors - Attending daily routine preventive maintenance work during idle time of conveyors like, renewal defective / worn out idler, frames, damaged skirt rubbers, patch up welding works in the chutes, deck sheets, minor patch up on belt store drawal and devolution works - Including cost of all kind of required consumables, hire charges for T & P’s lead & lift etc complete.
Charges for assisting works for belt joint in slope conveyor 49, BFD 10B, 63 and BFD 6 including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler framesand skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete.
Charges for assisting works for pulley lagging works in conveyor 49, BFD 10B, 63 and BFD 6 including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trail operation including T&P hire charges cost of consumables etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley / bend pulley and take up moveable pulley in conveyor 49, BFD 10B, 63 and BFD 6 including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley / drive pulley in conveyor 49, BFD 10B, 63 and BFD 6 including arresting the conveyor belt lifting the counter weight and normalizing the system after completing bearing overhauling, trial operation including T&P hire charges and cost of consumables etc., complete.
ARASU CONTRACTOR (BID ID -1550753)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_757508.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid