Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-AOC | ₹3.7 L | 1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | PIRAMANAYAGAM H1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton soil, hard red, earth mixed with 50% fair sized boulders and hard gravelly soil and depositing on bank with initialed and lift as per SS 20A inclusive of shoring strutting waling and bailing out water where ever necessary forming protective bunds, coffer dams and including refilling charges around and all other incidental charges etc., complete complying with standard specification for foundation SS. No. 23 SSRB. | 15 | Cum | 224 ₹3,360.05 |
| 2.00 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG Jelly including cost & conveyance of all material to site and all labors etc complete. | 3 | Cum | 4,841 ₹14,540.81 |
| 3.00 | Brick work in Cement Motor 1:5 using country bricks of size 8 3/4x 41/4x 21/4 including cost and conveyance of all materials to site from approved sources including cost of cement which will be supplied by the contractor own cost of stipulated under special condition, including the conveyance of cement from the departmental saction stores to work site and bandling charges for the same at both ends including labour charges for mixing cement mortor including safolding charges extra labour for working in heights and watering and curing with all leads for good soft potable water and including all other incidental charges etc.complete complying with standard specifications. | 14 | Cum | 5,696 ₹79,763.25 |
| 4.00 | Supply and fabrication of steel including cost and conveyance of steel and labour charges for cutting, bending, grilling, tying and fixing in position as per standard specification. | 500 | KG | 89 ₹44,500 |
| 5.00 | Centering for sides and soffiots including necessary supports and strutting as directed by the departmetal officers. Rate for 10m2 for the following items (RCC floor slab, Rectangular/ Square, Tee/ Ell beams. Lintels. | 52 | Sqm | 614 ₹31,924.93 |
| 6.00 | Rainforcement CC 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and favricative charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roofs | 5 | Cum | 8,574 ₹42,828.07 |
| 7.00 | Ceiling Plastering with cement mortor 1:3 mix to 10mm thick for RCC . Items including cost and conveyance of all materials to site and all labour charges etc completed | 15 | Sqm | 284 ₹4,261.33 |
| 8.00 | Plastering with C.M 1:5 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. | 79.99 | Sqm | 246 ₹19,678.77 |
| 9.00 | Finishing the top of roof with one course of machine pressed tiles 23 C.m x 23 C.m x 2 C.m size using cement mortor 1:3 mix mixed with 2% by weight of Crude Oil and pointing with Cement Mortor 1:3 mix Cost of all materials and labour charges and brick jelly concrete etc., complete as per standard specifications | 4 | Sqm | 1,097 ₹4,383.61 |
| 10.00 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm finished thickness with c.m 1:3-20mm Tk and polished with same color cement including all cost and convene of all materials etc.,complete | 5.99 | Sqm | 1,003 ₹6,012.98 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
23 Feb 2024, 3:00 pmClosed
Executive Officer Town Panchayat Cheranmahadevi
Executive Officer Town Panchayat Cheranmahadevi
Construction of Toilet at Compost Yard in Chernamahadevi Town Panchayat
2024_DTP_427005_1
420/2023
Open Tender
Civil Works
Executive Officer Town Panchayat Cheranmahadevi
As per Norms
2 documents required · 2 mandatory
₹0
₹5,000
Yes
7 Mar 2026
19 Feb 2024
23 Feb 2024
19 Feb 2024
23 Feb 2024
19 Feb 2024
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid