| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹3.6 Cr+₹7.8 L (2.23%)Rejected-AOC | ₹3.6 Cr+₹7.8 L (2.23%) | L2 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | Sri Ekho Das L2 | Sri Prasanta Kumar Deka L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in grabbing the seat of the embankment up-to 0.3 m depth by mechanical means and depositing the soils outside the country side toe of the proposed structures, etc. complete as directed. | 1.26 | Hec | 34,506.8 ₹43,478.57 | 32,667 ₹41,160.42 Lowest |
| 2.00 | Earth work in embankment by tractor trailer carriage by Mechanical means with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4cm cube, dressing as per design section and compaction with three wheel static roller of 80-100 KN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500m distance, etc. complete as directed.
For initial lead up to 1 Km and for all lifts
For beyond initial 1 Km & up to 10.00 Km & for all lifts. (total lead 3 Km including initial lead) | 52,533 | Cum | 330 ₹1,73,35,890 | 323.5 ₹1,69,94,425.5 Lowest |
| 3.00 | Turfing with grass sods of largest possible rectangles of 12cm minimum thickness placed closely including dressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts, etc. complete as directed. | 44,670 | Sqm | 35 ₹15,63,450 | 30 ₹13,40,100 Lowest |
| 4.00 | Supply of geo-textile Tube (Mega containers) with minimum properties as mentioned below.
i. Polymer : PP of 400 GSM or above
ii. Tube Circumference : 10m + 5%
iii. Fill Port (diameter): 30 to 45 Cm
iv. Tensile Strength (MD) : > 100 Kn/m
v. Tensile Strength (CD) : > 100 Kn/m
vi. Elongation - MD < 25%
vii. AOS: < 0.180 mm
viii. Permittivity: > 0.40 S - 1
ix. Length : 25m | 112 | Tube | 1,09,950 ₹1,23,14,400 | 1,08,080 ₹1,21,04,960 Lowest |
| 5.00 | Filling of geo-tubes (25m long and 10m circumference) with sand/silt of volume 176 cum by using mud pump not below the fill height of 1.60m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed @ 5m c/c along both sides of the tube to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 250m, etc. including setting up of the tube laying platform, complete as directed. | 112 | Tube | 39,815 ₹44,59,280 | 39,784.01 ₹44,55,809.12 Lowest |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
21 Nov 2025, 2:00 pmClosed
Chief Engineer, W.R. Department
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Construction of new embankment on both bank of river Pohumara and Anglisiga along with protection work at different reaches, Package 4.
2025_DoWR_47556_2
BAKSA/2025-26/RIDF/III
Open Tender
Civil Works
Works
365 days
Baksa
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹7.0 L
Yes
7 Mar 2026
10 Nov 2025
21 Nov 2025
10 Nov 2025
21 Nov 2025
14 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
pohumara_4_bid.pdf
Tender Documents • 0.72 MB
BOQ_77081.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .