Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.6 LAccepted-Finance | ₹40.6 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹41.5 L+₹88,895.70 (2.19%)Accepted-Finance DASHMESH NAGAR FEROZEPUR CITY | FEROZEPUR | FEROZEPUR | PUNJAB | ₹41.5 L+₹88,895.70 (2.19%) | L2 | Accepted-Finance Responsive |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹42.3 L
EMD Value
₹84,662
Closing Date
21 Aug 2026, 12:00 pmClosed
XEN PROVL Divn PWD B and R Ferozepur
XEN PROVL Divn PWD B and R Ferozepur
Repair Renovation whie wash of Judicial Court Complex Zira Distt Ferozepur
2026_CEPW_173379_1
Tender Notice No 9 Dated 11.08.2026
Open Tender
Civil Works - Buildings
Percentage
90 days
XEN PROVL Divn PWD B and R Ferozepur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹84,662
21 Sept 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work
Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm. layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 9.06 | Cum | 191.74 | ₹1,737.16 |
| 2 | Cement concrete 1:5:10 with stone aggregates 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 1.5 | Cum | 4,057.33 | ₹6,086 |
| 3 | First class burnt brick work laid in cement sand mortar 1:5 in Foundation & Plinth. | 5.31 | Cum | 5,996.8 | ₹31,843.01 |
| 4 | First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level. | 11.47 | Cum | 6,142.18 | ₹70,450.8 |
| 5 | Scraping of Plaster | 1,001.58 | Sqm | 37.93 | ₹37,989.93 |
| 6 | 12.5mm thick cement plaster 1:5 | 1,075.16 | Sqm | 191.82 | ₹2,06,237.19 |
| 7 | 20mm thick cement plaster 1:5 in two coat work | 753.15 | Sqm | 261.92 | ₹1,97,265.05 |
| 8 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish | 1,836.45 | Sqm | 84.28 | ₹1,54,776.01 |
| 9 | Applying priming coat with cement primer in all shade on newly plastered or concrete exterior surface | 1,836.45 | Sqm | 22.12 | ₹40,622.27 |
| 10 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) two or more coats on old distempered work when shade is changed | 12,483.12 | Sqm | 52.68 | ₹6,57,610.76 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
nit.pdf
Tender Documents • 15.24 MB
BOQ_352840.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .