Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹41.3 L+₹81,695.01 (2.02%)Rejected-AOC | L2 | Rejected-AOC Not Being L1 | |
| 3 | L3₹41.6 L+₹1.1 L (2.68%)Rejected-AOC 8TH WAD BCM ROAD BANDIKERI KAMALAPUR BELLARY KARNATAKA 583221 | VIJAYNAGAR | KARNATAKA | 583221 | L3 | Rejected-AOC Not Being L1 | |
| 4 | L4₹44.8 L+₹4.3 L (10.5%)Rejected-AOC | L4 | Rejected-AOC Not Being L1 | |
| 5 | L5₹45.2 L+₹4.7 L (11.6%)Rejected-AOC AKKAMAHADEVI ROAD VIJAYAPURA 586101 | VIJAYAPURA | VIJAYAPURA | KARNATAKA | 586101 | L5 | Rejected-AOC Not Being L1 |
Tender Value
₹43.1 L
EMD Value
₹1.1 L
Closing Date
1 Dec 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist, ASI, Dharwad Circle,
O/o Superintending Archaeologist, Archaeological Survey of India, Dharwad Circle, Behind Kannada Sahitya Bhavan, Near R N Shetty Stadium, Dharwad-580008
EXECUTION OF WORKUNDER, RESTORATION OF FORTIFICATION WALL AT FORT MIRJAN, DIST. UTTAR KANNADA, UNDER MW (CONS), FOR THE YEAR 2022-23
2022_ASI_722744_1
Sout/Dhar/Bhat/21 F/12549922
Open Tender
Civil Works
Works
120 days
Fort Mirjan Dsit.Uttar Kannada
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.1 L
Yes
25 Jan 2023
10 Nov 2022
2 Dec 2022
10 Nov 2022
1 Dec 2022
10 Nov 2022
Amount
EXECUTION OF WORKUNDER, RESTORATION OF FORTIFICATION WALL AT FORT MIRJAN, DIST. UTTAR KANNADA, UNDER MW (CONS), FOR THE YEAR 2022-23
Earth work excavation in hard soil up to a depth of 30 cm for providing the laterite stone flooring in upper moat (North western Part) in the missing portion during the excavation care should be taken to avoid any damage to the structures and disposing the soil away from the site etc; complete as per the instruction of the Site in charge.
Providing the lime concrete to the base for providing laterite stone flooring using Lime Surkhi Mortar 1:1:1 and 20 mm down size brick aggregatesincluding, cost of materials, conveyance, loading, unloading charges, labour charges for mixing, laying, leveling, compacting, curing etc. complete as per the instruction of the Site in-charge.
Providing the laterite stone flooring in upper moat area in the missing portion using new laterite Stone of size 0.35 x0.20 X 0.17m in Lime Surkhi Mortar 1:1:1 as per technical specifications including, cost of materials, conveyance, loading, unloading charges, labour charges, mixing, laying, leveling, curing etc. complete as per the instruction of the Engineer in charge.
Providing the missing moat wall (parapet wall) using new laterite Stones of size 0.45x0.25x0.20 in Lime Surkhi mortar 1:1:1 as per drawing, technical specifications and matching original existing structural evidences including cost of materials, conveyance, loading, unloading charges,labour chargesfor preparation of mortar, masonry work, curing etc. complete as per the instruction of the Engineer in charge.
Providing the Coping with Laterite stone over the moat parapet wall of width 0.45m using Laterite stones of size 0.45x0.25x0.20, in Lime Surkhi Mortar 1:1:1 as per drawing, technical specifications and matching the original available evidences, cost of materials, conveyance, loading and unloading charges, labour charges forpreparation of mortar, masonry works, curing etc. complete as per the instruction of the Engineer in charge.
Carefully dismantling, removing the dislodged/ out of plumb/ sunken/ fallen portions of fortification walls and merlons, collecting useful materials for reuse, numbering and stacking nearby work site, erecting and dismantling of scaffolding, disposing the unwanted debris away from the site by head load and then by tractor to disposing area away from the monument. etc., complete. Necessary numbering with documentation and photo documentation should be carried out as per the direction of the Engineer in charge.
Restoration of fortification wall in missing portions with Laterite stone masonry using 100 % new laterite stones of size 0.45 X 0.25 X 0.20m in Lime Surkhi mortar 1:1:1 including erecting and dismantling of scaffolding wherever necessary, cost of materials, conveyance, loading, unloading charges, labour charges for preparation of mortar, masonry works, curing etc. complete as per the instruction of the Engineer in charge.
Conservation/ restoration of missing/ dismantled / removed portions of fortification walls and merlons using 70% old and 30 % new laterite stone in lime surki mortar 1:1:1 matching the original evidences including erecting and dismantling of scaffolding wherever necessary, cost of materials, conveyance, loading and unloading charges, labour charges for preparation of mortar, masonry works, curing etc. complete as per the instruction of the Engineer in charge.
Recess pointing to the flooring, parapet wall and fortification walls matching original including erecting and dismantling of scaffolding wherever necessary, cost of materials, conveyance, loading and unloading charges, labour charges for preparation of mortar, curing etc. complete as per the instruction of the Engineer in charge.
S V NIMBALAGUNDI
G MURALI
GURAYYA V NIMBALAGUNDI
DHARMENDRA P JADHAV
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .