| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance AT PO DADPUR BHAWANIPATNA DIST KALAHANDI | BHAWANIPATNA | KALAHANDI | ODISHA | -30.66% | ₹4.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.5 L+₹91,223.05 (19.7%)Admitted-Fee/PreQual/Technical/Finance AT PRATAPPUR PO BADKARLAKOTE P S JAIPATNA DIST KALAHANDI ODISHA | KALAHANDI | ODISHA | -16.99% | ₹5.5 L+₹91,223.05 (19.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.7 L+₹1.0 L (22.6%)Admitted-Fee/PreQual/Technical/Finance AT PO KESINGA BAGAD WARD NO 01 DIST KALAHANDI | KALAHANDI | ODISHA | 766001 | -14.99% | ₹5.7 L+₹1.0 L (22.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹5.8 L+₹1.2 L (26.0%)Admitted-Fee/PreQual/Technical/Finance AT CAPABANDHU NAGAR BADAPADA PO PS BHAWANIPATNA DIST KALAHANDI | BHAWANIPATNA | KALAHANDI | ODISHA | -12.60% | ₹5.8 L+₹1.2 L (26.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.0 L+₹1.4 L (29.8%)Admitted-Fee/PreQual/Technical/Finance | -9.99% | ₹6.0 L+₹1.4 L (29.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.7 L
EMD Value
₹6,673
Closing Date
22 Jul 2026, 4:00 pmClosed
Executive Engineer (Agriculture)
Kalahandi Division, Bhawanipatna
Construction of Roof Top Shed at FMDC, Bhawanipatna
2026_AGRIL_134647_1
E.E (A) K/D-02/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
BHawanipatna
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Executive Engineer (Agriculture) Kalahandi Div
₹6,673
Yes
5 Aug 2026
8 Jul 2026
27 Jul 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling etc. complete including cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | Cum | 280.08 | ₹279.8 |
| 2 | Filling foundation and plinth with sand well watered and rammed etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | Cum | 938.4 | ₹937.46 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | Cum | 6,100.62 | ₹6,094.52 |
| 4 | Cement concrete of proportion (1:2:4) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | - | cum | 7,757.52 | - |
| 5 | Brick work with Flyash Brick having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:6) in Superstructure etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | - | aaa | - | - |
| 6 | 1st Floor | - | cum | 5,923.69 | - |
| 7 | 16 mm thick cement plaster in cement mortar (1:6) with watering and curing etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction of the EIC. | - | aaa | - | - |
| 8 | 1st Floor | 1 | Sqm | 291.97 | ₹291.68 |
| 9 | Finishing walls with 1 coat water based Primer on new work to give an even Shade including cost of Primer complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction of the EIC. | - | aaa | - | - |
| 10 | Ground Floor | - | Sqm | 82.98 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
BOQ_600059.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .