Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.9 L+₹32,757.61 (4.35%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance INDUSTRIAL ESTATE PHASE III KHONMOH KHONMOH SRINAGAR JAMMU KASHMIR 191104 | 191104 | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.1 L
EMD Value
₹18,200
Closing Date
20 Jul 2026, 4:00 pmClosed
Executive Engineer RNB Division Pulwama
Executive Engineer RNB Division Pulwama
Construction of prefabricated hut with toilet at Kalampora Shadimarg.
2026_PWDJK_315125_1
59 /EEP/RNB/of 2026-2027/ 3173-83 Dated.08 /07/2026
Open Tender
Civil Works
Percentage
60 days
Pulwama
as per nit
3 documents required · 3 mandatory
₹600
Bearing No 0470010200000099
₹18,200
24 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, etc including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and its disposal All kinds of soil. | 1 | cum | - | - |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | 1 | cum | - | - |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 1 | cum | 1 | ₹1 |
| 4 | Providing and laying in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size | - | cum | - | - |
| 5 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:2:4 coarse sand 20mm nominal size crushed stone agg.) | - | cum | - | - |
| 6 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:3:6 coarse sand 20mm nominal size crushed stone agg.) | - | cum | 1 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | kg | 1 | ₹1 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 1 | sqm | - | - |
| 9 | Providing and fixing of wall panel 60mm thick (puff panel) and width 1 mtr or more insulated thick panel with 0.50mm PPGI sheet both sides with density of 40 kg/cbmtr, fixing on steel frame work with necessary flashings,screws, and all carriages of material upto site complete job all as per directions of EIC | - | sqm | - | - |
| 10 | Providing and fixing of wall panel 40mm thick (puff panel) and width 1 mtr or more insulated thick panel with 0.50mm PPGI sheet both sides with density of 40 kg/cbmtr, fixing on steel frame work with necessary flashings,screws, and all carriages of material upto site complete job all as per directions of EIC | 1 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_1021219.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .