| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.6 LRejected-AOC | ₹1.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SELVARASU V L2 | SAKTHI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.01 | 1.Renovation of Arulmozhi PUM School Building in Karaikurichi Panchayat
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 30.5 | Sqm | 10 ₹305 | 9 ₹274.50 |
| 1.02 | Chipping of concrete and roughening the surface including all labour charges, etc., copmlete | 31.5 | Sqm | 45 ₹1,417.50 | 40 ₹1,260 |
| 1.03 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 30.5 | Sqm | 315 ₹9,607.50 | 308.8 ₹9,418.40 |
| 1.04 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 31.5 | Sqm | 1,650 ₹51,975 | 1,505 ₹47,407.50 |
| 2.01 | 2.Renovation of Kolaiyanur PUE School Building (Two Class room) in Ulliyakudi Panchayat (East Facing)
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 115.93 | Sqm | 11 ₹1,275.23 | 9 ₹1,043.37 |
| 2.02 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 115.93 | Sqm | 315 ₹36,517.95 | 308.8 ₹35,799.18 |
| 3.01 | 3.Renovation of Managethi PUM School Building (Two Class room) in Managethi Panchayat (East Facing)
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 115.93 | Sqm | 11 ₹1,275.23 | 9 ₹1,043.37 |
| 3.02 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 115.93 | Sqm | 310 ₹35,938.30 | 308.8 ₹35,799.18 |
| 4.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work} | 1 | GST Amount (in Rupees) | 24,896.11 ₹24,896.11 | 23,768.19 ₹23,768.19 |
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
26 Nov 2025, 3:00 pmClosed
Block Development Officer (BP)
Panchayat Union, T.Palur
Renovation of School Buildings 3 Nos in Karaikurichi, Ulliyakudi and Managethi Panchayats in T.Palur Block of Ariyalur District under PUGF 2025-26
2025_RDTN_625669_1
A3/1552/2025,Dated.17.11.202
Open Tender
Civil Works - Others
30 days
Panchayat Union, T.Palur
As per Tender Document
4 documents required · 4 mandatory
₹0
₹2,000
12 May 2026
22 Nov 2025
26 Nov 2025
22 Nov 2025
26 Nov 2025
22 Nov 2025
Amount
1.Renovation of Arulmozhi PUM School Building in Karaikurichi Panchayat Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Chipping of concrete and roughening the surface including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
2.Renovation of Kolaiyanur PUE School Building (Two Class room) in Ulliyakudi Panchayat (East Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
3.Renovation of Managethi PUM School Building (Two Class room) in Managethi Panchayat (East Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
SELVARASU V (BID ID -1521329)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.86 MB
PriceBid2.pdf
Tender Documents • 0.71 MB
TechnicalBid2.pdf
Tender Documents • 0.82 MB
BOQ_748176.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid