Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC E 602 HETTAGE MAX SECTOR 102 GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹13.8 L (9.35%)Rejected-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹1.6 Cr+₹13.8 L (9.35%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.6 Cr+₹14.7 L (9.98%)Rejected-AOC PLOT NO 844 PLOT NO 844 SECTOR 15 II URBAN ESTATE SUB TEHSIL WAZIRABAD GURGAON GURGAON HARYANA 122003 122003 | GURGAON | GURGAON | HARYANA | 122003 | ₹1.6 Cr+₹14.7 L (9.98%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.6 Cr+₹14.9 L (10.1%)Rejected-AOC | ₹1.6 Cr+₹14.9 L (10.1%) | L4 | Rejected-AOC L4 |
| 5 | L5₹2.0 Cr+₹49.7 L (33.7%)Rejected-AOC 159 SECTOR 5 GURUGRAM HARYANA 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹2.0 Cr+₹49.7 L (33.7%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Sat Parkash Contractor L6 | M/s Sant Kripa Infra Tec Pvt. Ltd. L4 | Mahender Kumar L5 | M/S B & P INFRATECH L1 | Tirupati Construction L2 | Suresh Kumar L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repairing water supply line/ leakage in 100 mm i/d pipe line with JCB breaker for depth upto 2 m | 20 | Nos. | 9,300 ₹1,86,000 | 2,500 ₹50,000 | 6,900 ₹1,38,000 | 1,000 ₹20,000 Lowest | 18,800 ₹3,76,000 | 2,800 ₹56,000 |
| 2.00 | Making rough surface of finishing surface | 4,070 | Sqm | 28 ₹1,13,960 | 200 ₹8,14,000 | 5 ₹20,350 | 1 ₹4,070 Lowest | 18.5 ₹75,295 | 100 ₹4,07,000 |
| 3.00 | Hiring of Sewerage submersible pump set 10 HP with and operator with Genset for diversion of sewerage water having head of 4`x6` and 20 mtr suction pipe and 50 mtr delivery pipe expenses regarding of repair of maintenance will be bear by the agency complete in all respect (Rs35000/month)=(Rs1166/day) | 270 | Per day | 1,800 ₹4,86,000 | 600 ₹1,62,000 | 1,500 ₹4,05,000 | 500 ₹1,35,000 Lowest | 1,850 ₹4,99,500 | 1,100 ₹2,97,000 |
| 4.00 | Providing and making saw cut transverse construction /contraction joint as per approved drawing provided at a maximum distance of 4.5 m including the cost of covering of dowel bars with the plastic sheath for at least 60% of the length from one end. Initially 3 to 4 mm wide cut shall be made after 1 to 2 days up to 1/3rd depth of slab and including cost of scaling
temporarily with a jute rope. At the time of sealing of the joint temporary seal shall be taken out and 5 mm wide grove shall be
make up to a depth of 5 mm. Before sealing the joint temporary with a jute rope. At the time of sealing temporarily seal shall be
taken out and 10 and 12 mm. Before sealing the joint 5 mm thick compressible de-boding strips with paper back shall be
inserted to the bottom of the groove. The groove shall be filled with poly sulphide/silicon sealant. The sealant shall be applied slightly at a lower level than the slab with a tolerance of 24 mm complete in all respect` | 1,050 | Metre | 160 ₹1,68,000 | 150 ₹1,57,500 | 70 ₹73,500 | 10 ₹10,500 Lowest | 560 ₹5,88,000 | 100 ₹1,05,000 |
| 5.00 | Repair of damaged household Sewer connection existing line (Including GST) | 40 | Each | 1,200 ₹48,000 | 400 ₹16,000 | 1,200 ₹48,000 | 300 ₹12,000 | 9,500 ₹3,80,000 | 10 ₹400 Lowest |
| 6.00 | Repair of damaged household Water Supply connection existing line (Including GST) | 50 | Each | 1,900 ₹95,000 | 400 ₹20,000 | 900 ₹45,000 | 300 ₹15,000 | 9,500 ₹4,75,000 | 10 ₹500 Lowest |
| 7.00 | Making sewer connection from proposed 300,400,500mm to 600mm existing sewer line complete in all respect including material, T and P , Plugging and Diversion of sewerline and labour | 1 | Each | 96,300 ₹96,300 | 5,000 ₹5,000 Lowest | 58,000 ₹58,000 | 35,000 ₹35,000 | 14,000 ₹14,000 | 40,000 ₹40,000 |
| 8.00 | Analysis of rate for providing of 600 mm i/d RCC NP-3 pipe sewer pipe by trenchless technology with 1000 mm i/d 12 mm thick mild steel (MS) casing including all machine and equipment complete in all respect | 65 | Per Metre | 96,000 ₹62,40,000 | 30,000 ₹19,50,000 | 62,000 ₹40,30,000 | 35,000 ₹22,75,000 | 18,500 ₹12,02,500 Lowest | 34,000 ₹22,10,000 |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
4 Dec 2025, 10:00 amClosed
SH SANDEEP SINGH
Municipal Corporation Gurugram
Providing and Laying 600mm dia Rcc Np3 Sewer Line and Road Reconstruction from H.No. 2707 to Paras Hospital Red Light, Including Trenchless Connection to GMDA Sewer Line in Sushant Lok Phase-I, Ward No. 24 under EE-4B, MCG
2025_HRY_485184_1
2025B5DEF32E 6185 44AF 8F81 653204F1A925285ULB
Open Tender
Civil Works
Works
250 days
Gurugram
2 documents required · 2 mandatory
₹15,000
₹3.5 L
Yes
30 Jan 2026
24 Nov 2025
4 Dec 2025
24 Nov 2025
4 Dec 2025
24 Nov 2025
Amount
Repairing water supply line/ leakage in 100 mm i/d pipe line with JCB breaker for depth upto 2 m
Making rough surface of finishing surface
Hiring of Sewerage submersible pump set 10 HP with and operator with Genset for diversion of sewerage water having head of 4`x6` and 20 mtr suction pipe and 50 mtr delivery pipe expenses regarding of repair of maintenance will be bear by the agency complete in all respect (Rs35000/month)=(Rs1166/day)
Providing and making saw cut transverse construction /contraction joint as per approved drawing provided at a maximum distance of 4.5 m including the cost of covering of dowel bars with the plastic sheath for at least 60% of the length from one end. Initially 3 to 4 mm wide cut shall be made after 1 to 2 days up to 1/3rd depth of slab and including cost of scaling temporarily with a jute rope. At the time of sealing of the joint temporary seal shall be taken out and 5 mm wide grove shall be make up to a depth of 5 mm. Before sealing the joint temporary with a jute rope. At the time of sealing temporarily seal shall be taken out and 10 and 12 mm. Before sealing the joint 5 mm thick compressible de-boding strips with paper back shall be inserted to the bottom of the groove. The groove shall be filled with poly sulphide/silicon sealant. The sealant shall be applied slightly at a lower level than the slab with a tolerance of 24 mm complete in all respect`
Repair of damaged household Sewer connection existing line (Including GST)
Repair of damaged household Water Supply connection existing line (Including GST)
Making sewer connection from proposed 300,400,500mm to 600mm existing sewer line complete in all respect including material, T and P , Plugging and Diversion of sewerline and labour
Analysis of rate for providing of 600 mm i/d RCC NP-3 pipe sewer pipe by trenchless technology with 1000 mm i/d 12 mm thick mild steel (MS) casing including all machine and equipment complete in all respect
Bidder Name
Amount
Sat Parkash Contractor (GSTN-NA) BID ID -1378927
M/s Sant Kripa Infra Tec Pvt. Ltd. (GSTN-06AAYCS4070P1ZF) BID ID -1379002
Mahender Kumar (GSTN-06CQDPS8932A1ZU) BID ID -1378918
M/S B & P INFRATECH (GSTN-NA) BID ID -1378680
Tirupati Construction (GSTN-NA) BID ID -1378982
Suresh Kumar (GSTN-NA) BID ID -1378913
Suresh Kumar (BID ID -1378913)
M/s Sant Kripa Infra Tec Pvt. Ltd. (BID ID -1379002)
Tirupati Construction (BID ID -1378982)
Mahender Kumar (BID ID -1378918)
Sat Parkash Contractor (BID ID -1378927)
Tirupati Construction (BID ID -1378982)
Suresh Kumar (BID ID -1378913)
M/s Sant Kripa Infra Tec Pvt. Ltd. (BID ID -1379002)
Mahender Kumar (BID ID -1378918)
Sat Parkash Contractor (BID ID -1378927)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_563212.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .