Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.4 CrAccepted-Finance | 1 | Accepted-Finance lowest quoted rate | |
| 2 | 2₹27.7 Cr+₹22.1 L (0.80%)Rejected-Finance | 2 | Rejected-Finance highest quoted rate |
| Sl No | Description | Qty | Unit | S B Infrastructure L1 | ARUN KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Cutting and clearance of jungle,bushes,shrubs Ankra/Pomoea,Julicflora type etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instruction of the Engineer-in -charge.Cost of wood has been deducted from rates and thus will be property of contractor after cutting .(For thick) | 5,02,730 | Sqm | 3 ₹15,08,190 Lowest | 3.5 ₹17,59,555 |
| 2.00 | Cutting and uprooting of trees including removing of roots and filling of hole, cutting/up rooted would be property of the department (b)Over 15 cms to 30 cms. Girth | 8,100 | Each | 50 ₹4,05,000 Lowest | 115 ₹9,31,500 |
| 3.00 | Earthwork in Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area, dewatering wherever required complete in all respect (b)Hard / dense soil | 29,342.64 | Cum | 45 ₹13,20,418.67 Lowest | 71 ₹20,83,327.23 |
| 4.00 | Earth work in rough ( borrow area ) excavation for embankments in hard soil, morrum of highly weathered strata dry of moist, including laying in 20 cm layers ( before compaction ) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with intial lead of 250 m and lift ap to 1.5 m (Excluding charges for compaction and watering ) including loading and un-loading wherever required complete in all respect. | 2,99,121.99 | Cum | 61 ₹1,82,46,441.15 Lowest | 92 ₹2,75,19,222.71 |
| 5.00 | Compaction of earth or highly weathered strata (b)By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.(ii) at least 95% of Standard Proctor's density. | 2,99,121.99 | Cum | 15 ₹44,86,829.79 Lowest | 33 ₹98,71,025.54 |
| 6.00 | Watering of earth including cost of carriage of water when source of water is up to 1 km | 2,99,121.99 | Cum | 3 ₹8,97,365.96 Lowest | 10 ₹29,91,219.86 |
| 7.00 | Benching base and depositing the excavated material including dressing etc. Complete with in initial lead up to 50 M and fift up to 1.5 M | 8,064.79 | CUM | 20 ₹1,61,295.8 Lowest | 71 ₹5,72,600.09 |
| 8.00 | Lip cutting and final dressing as per designed section including rehandling and disposal of excavated earth in layer 20 cm on embankments etc. with cost of dewatering wherever required ,and complete in all respect. | 1,07,530.53 | Sqm | 15 ₹16,12,957.94 Lowest | 30 ₹32,25,915.87 |
| 9.00 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. (b)In cement mortar | 700.81 | Cum | 50 ₹35,040.6 Lowest | 410 ₹2,87,332.92 |
| 10.00Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and and kankar & murrum for. | |||||
Tender Value
₹24.4 Cr
EMD Value
₹48.8 L
Closing Date
21 May 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE WR Zone Jaipur
O/o Additional Chief Engineer Water Resources Zone Jaipur, Sinchai Bhawan JLN Marg Jaipur
Rehabilitation of Bharatpur Feeder system District Bharatpur RWSLIP
2024_WRDAS_389034_1
ACE NIT 31/2023-24_Bharatpur Feeder_RWSLIP
Open Tender
Civil Works
Item Rate
1095 days
under jurisdiction of Bharatpur Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per NIT and tender document
₹48.8 L
Jaipur
25 Jun 2024
18 Mar 2024
22 May 2024
18 Mar 2024
21 May 2024
18 Mar 2024
27 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearance of jungle,bushes,shrubs Ankra/Pomoea,Julicflora type etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instruction of the Engineer-in -charge.Cost of wood has been deducted from rates and thus will be property of contractor after cutting .(For thick) | 5,02,730 | Sqm | 100 | ₹5,02,73,000 |
| 2 | Cutting and uprooting of trees including removing of roots and filling of hole, cutting/up rooted would be property of the department (b)Over 15 cms to 30 cms. Girth | 8,100 | Each | 100 | ₹8,10,000 |
| 3 | Earthwork in Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area, dewatering wherever required complete in all respect (b)Hard / dense soil | 29,342.64 | Cum | 10 | ₹2,93,426.37 |
| 4 | Earth work in rough ( borrow area ) excavation for embankments in hard soil, morrum of highly weathered strata dry of moist, including laying in 20 cm layers ( before compaction ) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with intial lead of 250 m and lift ap to 1.5 m (Excluding charges for compaction and watering ) including loading and un-loading wherever required complete in all respect. | 2,99,121.99 | Cum | 10 | ₹29,91,219.86 |
| 5 | Compaction of earth or highly weathered strata (b)By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.(ii) at least 95% of Standard Proctor's density. | 2,99,121.99 | Cum | 10 | ₹29,91,219.86 |
| 6 | Watering of earth including cost of carriage of water when source of water is up to 1 km | 2,99,121.99 | Cum | 10 | ₹29,91,219.86 |
| 7 | Benching base and depositing the excavated material including dressing etc. Complete with in initial lead up to 50 M and fift up to 1.5 M | 8,064.79 | CUM | 10 | ₹80,647.9 |
| 8 | Lip cutting and final dressing as per designed section including rehandling and disposal of excavated earth in layer 20 cm on embankments etc. with cost of dewatering wherever required ,and complete in all respect. | 1,07,530.53 | Sqm | 10 | ₹10,75,305.29 |
| 9 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. (b)In cement mortar | 700.81 | Cum | 10 | ₹7,008.12 |
| 10Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and and kankar & murrum for. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_693335.xls
BOQ Document • 0.35 MB
142243982.pdf
Tender Document • 0.78 MB
BidDocumentBharatpurFeeder.pdf
Tender Document • 4.56 MB
142243984.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .