| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹2.4 L+₹30,554 (14.4%)Rejected-AOC | ₹2.4 L+₹30,554 (14.4%) | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | D RAJENDRAN L2 | PNAT CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 46 | m3 | 128 ₹5,888 | 112 ₹5,152 Lowest |
| 2.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 46 | m3 | 104 ₹4,784 | 90 ₹4,140 Lowest |
| 3.00 | Flooring with bed of cement concrete 1:4:8 (One part of cement, four parts of sand and eight parts of stone jelly by volume) using 40 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 5 | m3 | 5,962 ₹29,810 | 5,211 ₹26,055 Lowest |
| 3.01 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as Plain cement concrete walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 120 | m2 | 356 ₹42,720 | 311 ₹37,320 Lowest |
| 3.02 | Drain walls with of cement concrete 1:3:6 (One part of cement, three parts of sand and six parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to the specified thickness including all labour charges for concreting, ramming, curing etc, complete complying with relevant standard specifications | 18 | m3 | 6,721 ₹1,20,978 | 5,876 ₹1,05,768 Lowest |
| 4.00 | Flooring with bed of cement concrete 1:2:4 (One part of cement, two parts of sand and four parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 1 | m2 | 7,266 ₹7,266 | 6,352 ₹6,352 Lowest |
| 5.00 | Plastering with C.M.1:5 mix with 12mm thick etc., complete as per the direction of departmental officers. | 26 | m2 | 309 ₹8,034 | 270 ₹7,020 Lowest |
| 6.00 | Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC Slabs, Rectangular beams, TEE or ELL beams, Lintels, Bed blocks, Staircase waist, Landing slab, Landing beam and Canopy etc., in all floors to centre etc., complete and as directed. | 5 | m2 | 712 ₹3,560 | 622 ₹3,110 Lowest |
| 7.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for all RCC items of work excluding centering, shuttering and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete | 1 | m3 | 9,744 ₹9,744 | 8,516 ₹8,516 Lowest |
| 8.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 1 | qtl | 9,542 ₹9,542 | 8,339 ₹8,339 Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
29 Jun 2026, 3:00 pmClosed
Asst Commissioner
East Zone Singanallur-641005
Construction of Storm Water Drain with culvert at Andiappar Lay out in W.No 5 East zone
2026_MAWS_681272_32
E3/2026/EZ
Open Tender
Civil Works - Roads
Item Rate
East Zone Singanallur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
Yes
19 Sept 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 46 | m3 | - | - |
| 2 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 46 | m3 | - | - |
| 3 | Flooring with bed of cement concrete 1:4:8 (One part of cement, four parts of sand and eight parts of stone jelly by volume) using 40 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 5 | m3 | - | - |
| 3.01 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as Plain cement concrete walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 120 | m2 | - | - |
| 3.02 | Drain walls with of cement concrete 1:3:6 (One part of cement, three parts of sand and six parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to the specified thickness including all labour charges for concreting, ramming, curing etc, complete complying with relevant standard specifications | 18 | m3 | - | - |
| 4 | Flooring with bed of cement concrete 1:2:4 (One part of cement, two parts of sand and four parts of stone jelly by volume) using 20 mm thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 1 | m2 | - | - |
| 5 | Plastering with C.M.1:5 mix with 12mm thick etc., complete as per the direction of departmental officers. | 26 | m2 | - | - |
| 6 | Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC Slabs, Rectangular beams, TEE or ELL beams, Lintels, Bed blocks, Staircase waist, Landing slab, Landing beam and Canopy etc., in all floors to centre etc., complete and as directed. | 5 | m2 | - | - |
| 7 | Reinforced Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for all RCC items of work excluding centering, shuttering and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete | 1 | m3 | - | - |
| 8 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 1 | qtl | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.10 MB
SWD.pdf
Tender Documents • 0.51 MB
BOQ_818789.xls
BOQ • 0.30 MB
Extension.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .