Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance 0 DHARAMBUGH KRALPORA BAGI MEHTAB B K PORA BUDGAM JAMMU KASHMIR 190019 | SRINAGAR | JAMMU AND KASHMIR | 190019 | ₹7.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.9 L+₹4,392 (0.56%)Admitted-Finance | ₹7.9 L+₹4,392 (0.56%) | L2 | Admitted-Finance |
| 3 | L3₹7.9 L+₹6,154 (0.79%)Admitted-Finance | ₹7.9 L+₹6,154 (0.79%) | L3 | Admitted-Finance |
| 4 | L4₹8.1 L+₹25,120 (3.21%)Admitted-Finance | ₹8.1 L+₹25,120 (3.21%) | L4 | Admitted-Finance |
| 5 | L5₹8.4 L+₹59,538 (7.62%)Admitted-Finance | ₹8.4 L+₹59,538 (7.62%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AYMAN ELECTRIC SUPPLIERS L7 | M/S QADRI ELECTRICALS L3 | M/S KHAN ENTERPRISES L5 | MIR IRFAN ELECTRICAL/SUPPLIERS L1 | M/S HIBBA ELECTRICALS L4 | Wani Engineers (Prop. Zuhaib Ashraf Wani) L6 | M/S K PLUS ELECTRICAL SOLUTIONS L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Supply and fixing of 9 Mtr. Long Pole(ST-410 SP33) | 16 | No | 2,87,984 ₹2,87,984 | 2,53,600 ₹2,53,600 Lowest | 3,05,600 ₹3,05,600 | 3,05,600 ₹3,05,600 | 2,72,000 ₹2,72,000 | 4,00,000 ₹4,00,000 | 2,88,000 ₹2,88,000 |
| 1.02 | Supply and fixing of 8 Mtr. Long ST pole SP-15 | 10 | No | 1,40,000 ₹1,40,000 | 1,15,200 ₹1,15,200 Lowest | 1,59,000 ₹1,59,000 | 1,62,000 ₹1,62,000 | 1,30,000 ₹1,30,000 | 1,95,000 ₹1,95,000 | 1,48,000 ₹1,48,000 |
| 1.03 | Supply and laying of 100 mm² ACSR Conductor | 1.2 | Km | 1,44,000 ₹1,44,000 | 1,44,000 ₹1,44,000 | 1,18,800 ₹1,18,800 | 96,000 ₹96,000 | 1,44,000 ₹1,44,000 | 50,400 ₹50,400 Lowest | 1,08,192 ₹1,08,192 |
| 1.04 | Supply and laying of 0.05 ACSR Conductor | 1 | Km | 80,000 ₹80,000 | 65,000 ₹65,000 | 49,000 ₹49,000 | 50,000 ₹50,000 | 80,000 ₹80,000 | 38,000 ₹38,000 Lowest | 60,000 ₹60,000 |
| 1.05 | Supply and fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 86 | No | 24,940 ₹24,940 | 24,510 ₹24,510 | 19,092 ₹19,092 | 14,620 ₹14,620 Lowest | 14,620 ₹14,620 Lowest | 15,480 ₹15,480 | 16,340 ₹16,340 |
| 1.06 | Supply and fixing of LT Shackle with D Clamp | 72 | No | 10,800 ₹10,800 | 10,800 ₹10,800 | 3,960 ₹3,960 Lowest | 14,400 ₹14,400 | 7,200 ₹7,200 | 18,000 ₹18,000 | 6,120 ₹6,120 |
| 1.07 | Supply and fixing of GI channel, V-Cross Arm with F-Top and back clamps of sizes | 220 | Kg | 32,780 ₹32,780 | 30,800 ₹30,800 | 27,940 ₹27,940 | 28,160 ₹28,160 | 28,600 ₹28,600 | 25,300 ₹25,300 Lowest | 29,700 ₹29,700 |
| 1.08 | Painting of poles of Al Paint | 20 | Ltr | 9,000 ₹9,000 | 6,000 ₹6,000 | 1,760 ₹1,760 Lowest | 2,000 ₹2,000 | 2,000 ₹2,000 | 7,000 ₹7,000 | 3,000 ₹3,000 |
| 1.09 | Painting of poles with Red Oxide Primer | 20 | Ltr | 4,000 ₹4,000 | 2,000 ₹2,000 | 180 ₹180 Lowest | 600 ₹600 | 1,000 ₹1,000 | 7,000 ₹7,000 | 1,800 ₹1,800 |
| 1.10 | Providing Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm | 42 | No | 46,200 ₹46,200 | 35,784 ₹35,784 | 32,634 ₹32,634 | 25,200 ₹25,200 Lowest | 42,000 ₹42,000 | 42,000 ₹42,000 | 27,300 ₹27,300 |
Tender Value
₹9.7 L
EMD Value
₹19,400
Closing Date
25 Aug 2026, 4:00 pmClosed
Executive Engineer EDI
Office of Executive Engineer EDI
Improvement of HT LT network under the jurisdiction of ED-I
2026_PDD_319585_1
E-NIT No 028/EDI
Open Tender
Electrical Works
Lump-sum
30 days
Office of Executive Engineer EDI
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
Executive Engineer EDI
₹19,400
Yes
7 Sept 2026
5 Aug 2026
26 Aug 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
5 Aug 2026 - 25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply and fixing of 9 Mtr. Long Pole(ST-410 SP33) | 16 | No | - | - |
| 1.02 | Supply and fixing of 8 Mtr. Long ST pole SP-15 | 10 | No | - | - |
| 1.03 | Supply and laying of 100 mm² ACSR Conductor | 0.9 | Km | - | - |
| 1.04 | Supply and laying of 0.05 ACSR Conductor | - | Km | - | - |
| 1.05 | Supply and fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 86 | No | - | - |
| 1.06 | Supply and fixing of LT Shackle with D Clamp | 72 | No | - | - |
| 1.07 | Supply and fixing of GI channel, V-Cross Arm with F-Top and back clamps of sizes | 220 | Kg | - | - |
| 1.08 | Painting of poles of Al Paint | 20 | Ltr | - | - |
| 1.09 | Painting of poles with Red Oxide Primer | 20 | Ltr | - | - |
| 1.1 | Providing Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm | 42 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
SBD028.pdf
Other Document • 0.72 MB
TECSPE028.pdf
Other Document • 17.37 MB
BOQ_1059079.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .