Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹28.3 L
EMD Value
₹29,000
Closing Date
6 Oct 2023, 5:00 pmClosed
se edc
sonbhadra
Construction of New 11/0.4 KV Sub-station
2023_PVVNV_825922_2
57/edc(so)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹29,000
25 Oct 2023
9 Sept 2023
7 Oct 2023
9 Sept 2023
6 Oct 2023
9 Sept 2023
Amount
Supply of following materials as per RESSPO/PuVVNL norms at the work site.
ST pole 11 Mtr Long
PCC Pole 805 Mtr Long
Top Channel MS 125x65x2240 mm Long
M.S. Channel 125x65x1300 mm (T-off)
M.S.Channel Dropper100x50x6mm 2028mm Long
MS Angle 75x75x6,2080mm.with Clamp & bolt and Nut (TF Base)
ACSR Weasel conductor
ACSR Dog conductor
11 K.V. Disc Insulator T&C Type 4500Kg. With Fitting
11 K.V. Pin Insulator With pin
LT ABC Cable 3 X 50 + 1 X 35 + 1 X 16 Sq mm
LT ABC Cable 3 X 95 + 1 X 70 + 1 X 16 Sq mm
11 KV V-Type Cross Arm
LT PVC Cable Al. 1X240 sq.mm
LT PVC Cable Al. 1X400 sq.mm
LT XLPE Cable Al. 1X1000 sq.mm.
11 KV XLPE Cable Al.3X70 sq.mm.
11 KV XLPE Cable 3 Core 120 sq.mm.
Stay Complete
Earthing Complete
10 KVA Three Phase T/F, 11/0.4 KV
25 KVA Three Phase T/F, 11/0.4 KV
63 KVA Three Phase T/F, 11/0.4 KV
100 KVA Three Phase T/F, 11/0.4 KV
250 KVA Three Phase T/F, 11/0.4 KV
400 KVA Three Phase T/F, 11/0.4 KV
GI Wire for Guarding 10 Swg
LT Shackle Insulator
Supply of DE-CENTRALIZED MATERIALS (Provided By Contactor)
Cross Arm Holding Clamp With Nut & Bolt
Danger Board With Nut & Botlts
Stone Pade (300x300x75)mm
F- Bracket With Nut & Bolt
Barbed Wire
Top, T-Off & Cross Brassing Asngle Clamp With Nut & Bolt
T/F holding clamp
Al. Lug 250 sq.mm
Al. Lug 400 sq.mm
Al. Lug 120 sq.mm
LT clamp with Nut & Bolt
I hook dead end dauly insulated
I hook dead with Suspension clamp dauly Insulated
I hook with Nut & Bolt
Pole Clamp with Nut & Bolt
PG Clamp 70/35 & 95/50 mm
Piercing connector 16 sq.mm.
Piercing connector 120-50 sq.mm.
Piercing connector 95-95 sq.mm.
3 phase Distribution Box
Al. Crimping Clamp
Trolly
Coper L.Piece (50X225X10 mm)
Al. Lug Crimping Type 170 sq.mm.
MS Nut & Bolt
Guarding Angle Clamp
Guarding Angle With Nut & Bolt
Various Type Nut Bolt
Chemical Earthing of T/F
Outdoor Cable Jointing Kit 3X120 sq.mm
Construction of Plinth
Cable Jointing Kit 3X70 11 KV
Work of following materials as per RESSPO/PuVVNL norms at the work site.
Shifting, loading, carriage & Erection of Single pole structure on 8.5 mtr. PCC Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, T-off with all accessories, 'F' bracket, composite polymar pin, insulator, danger board with clamp, earthing,Pole no. painting, barbed wire etc. complete).
Shifting, loading, carriage & Erection of Double Pole structure on 8.5 mtr. PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (MS Angle 75x75x6,2080mm.with Clampe & boltand Nut (TF Base), Top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
Shifting, loading, carriage & Erection of Single pole structure on 11 mtr. ST Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket, composite polymer pin, insulator, danger board with clamp, Pole no. painting,earthing, barbed wire, painting of pole with painr, making of plinth around ST Pole etc. complete)
Shifting, loading, carriage & Erection of Double Pole structure on 11 mtr. ST Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (MS Angle 75x75x6,2080mm.with Clampe & boltand Nut (TF Base), Top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
Shifting, loading, carriage & Laying, spreading, lifting and final sagging of 3 phases 3 wire 11 KV Line and 3 phase 4 wire 0.440 KV Line of ACSR Weasal conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos./04 Nos. conductor in parallel.
Shifting, loading, carriage & Laying, spreading, lifting and final sagging of 3 phases 3 wire 11 KV Line and 3 phase 4 wire 0.440 KV Line of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos./04 Nos. conductor in parallel.
LT ABC Cable 3 X 50 + 1 X 35 + 1 X 16 Sq mm Shifting, loading, carriage & Hanging the cable on the pole with the help of eye hook, end clamp, suspension clamp and get proper sagging.
LT ABC Cable 3 X 95 + 1 X 70 + 1 X 16 Sq mm Shifting, loading, carriage & Hanging the cable on the pole with the help of eye hook, end clamp, suspension clamp and get proper sagging.
11 KV 3x120 Sq.mm. Laying of XLPE Cable Digging a trench of size 0.75x75 m and filling the bottom with a layer of sand and laying cables covering the trench from the top by laying bricks and covering it with soil. With the help of GI pipe, the cable should be pulled towards the top of the pole.
11 KV 3x70 Sq.mm. Laying of XLPE Cable Digging a trench of size 0.75x75 m and filling the bottom with a layer of sand and laying cables covering the trench from the top by laying bricks and covering it with soil. With the help of GI pipe, the cable should be pulled towards the top of the pole.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT PVC Cable Al. 1X240 sq.mm with the crimping lugs.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT PVC Cable Al. 1X400 sq.mm with the crimping lugs.
To connect the overhead line to the transformer's all phases by lugging both the ends of the LT XLPE Cable Al. 1X1000 sq.mm with the crimping lugs.
Grouting of Stay Rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
Shifting, loading, carriage & Erection to make proper Earthing Neutral and body of Transformers and poles with help of GI wire.
Guarding between two poles (Span) like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, 10 SWG including supply, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing.
Shifting, loading, carriage of Materials & carriage and resetting on new single pole with the help of 2 no. T/F holding clamp including complete work for Establishment of 10 KVA Single Phase T/F, 11/0.230 KV
Shifting, loading, carriage of Materials & Making of Double Pole carriage and resetting on new Double Pole including complete work for Establishment of 25 KVA Three Phase T/F, 11/0.4 KV
Shifting, loading, carriage of Materials & Making of Double Pole carriage and resetting on new Double Pole including complete work for Establishment of 63 KVA Three Phase T/F, 11/0.4 KV
Shifting, loading, carriage of Materials & Making of Double Pole carriage and resetting on new Double Pole including complete work for Establishment of 100 KVA Three Phase T/F, 11/0.4 KV
Shifting, loading, carriage of Materials & Making of Plinth, carriage and resetting on new plinth including complete work for Establishment of 250 KVA T/F .
Shifting, loading, carriage of Materials & Making of Plinth, carriage and resetting on new plinth including complete work for Establishment of 400 KVA T/F .
Trolly size 3658X1829X2300 cu.mm by made stainless steel with 04 no. wheels.
To bound the three phase Distribution Box on poles and to make connection from LT ABC cable with the help of connecting cable and Piercing connector 16 sqmm, 50-95 sq.mm and 95-120 sq.mm.
Fixing of Coper L.Piece 50X225X10 Sq.mm
Making 11 KV XLPE Cable 3 Core 120 sq.mm. Outdoor Termination Kit
Making 11 KV XLPE Cable 3 Core 70 sq.mm. Outdoor Termination Kit
Shifting, loading, carriage & Erection to make proper Earthing of Neutral by Chemical Earthing and body of Transformers and poles with help of GI wire.
Shifting, loading, carriage of Materials & Making of Plinth, carriage and resetting on new plinth including complete work for Establishment of 400 KVA T/F .
M/s ANITA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .