Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance H O 13 320 KAMARAJ NAGAR GONUR PO METTUR DAM SALEM 636 404 | METTUR DAM | SALEM | TAMIL NADU | 636404 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹5,930
Closing Date
19 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (VP)
BDO, Office Kolathur Block
Salem District - Kolathur Block - Providing Drainage at Perumpallam Colony to Perumal House Navapatti Panchayat at AGAMT-II-2023-2024 Work No.07
2023_RDTN_334191_7
Roc.No.728/2023/T4
Open Tender
Civil Works
Item Wise
120 days
BDO, Office Kolathur Block
As per tender Document
3 documents required · 3 mandatory
₹0
₹5,930
21 Jul 2023
1 Jul 2023
19 Jul 2023
1 Jul 2023
19 Jul 2023
1 Jul 2023
Amount
Construction of CC Drainage With Soakpit at Perumpallam colony bhavani main road to perumal house H/o Navapatti
Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,. complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement Mortar 1:5(One cement and five M.sand ),20mm thick in all floors including curing etc .complete complying with standard specification
Cement concrete 1:1-1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Supplying and fabrication and placing in position of ribbed steel rods for reinforcement to all RCC Works
Provision for Soakpit
Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
Supplying and fabrication and placing in position of ribbed steel rods for reinforcement to all RCC Works
Reinforced cement concrete 1 : 1:5 : 3 mix using 20mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Supplying and Fixing of Rcc ready made ring 1.20m Dia & 0.30m height including cost and conveyance of all materials to site and all labour charges for fixing charges etc complete
Supplying and Fixing of Pvc pipe 180mm Dia of all materials to site and all labour charges for fixing charges etc complete
Supplying and cost of steel frame with weld mesh for drain vent trap including all charges etc
collection and supply of rough boulders from appd quarry including cost
collection and supply of 40mm metal from appd quarry including cost
collection and supply of 20mm metal from appd quarry including cost (Chamber Floor)
Plastering with CM 1:3, mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum (Chamber Floor)
Vertical Soakpit Side Lining wallalround
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
HARYTAMIL & CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .