Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 4 13 B PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | Accepted-Technical Technical Bid satisfied |
| 2 | Accepted-Technical 72 133 THOTTILPATTY SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | Accepted-Technical Technical bid satisfied |
| 3 | Rejected-Technical 13 1 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | Rejected-Technical Technical Bid not satisfied |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
26 Oct 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/MTPS-II
O/o CE MTPS II
Erection of Temporary maintenance platform and operation of Sky climber applying refractory around the burners OFA area and its allied works
2026_EB_712866_1
OT 16 Erection of Temporary maintenance platform and operation of Sky climber
Open Tender
Maintenance Works
Works
30 days
SE/M-I/MTPS-II
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,700
Yes
7 Nov 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
26 Oct 2026
12 Oct 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for transportation, Assembling and dismantling of Temporary maintenance platform / Sky climber for Shut down Maintenance works. | 2 | Nos | - | - |
| 2 | Operation of Temporary maintenance platform / Sky climber as per the requirements to assist various overhauling works such as Boiler cleaning, tube thickness survey etc., | 30 | Nos of climber operation | - | - |
| 3 | Shifting the Temporary maintenance platform / Sky climber inside the furnace for access of LHS / RHS side. | 6 | Nos | - | - |
| 4 | Shifting the Temporary maintenance platform / Sky climber inside the furnace for access of Front/ Rear side. | 12 | nos | - | - |
| 5 | Transporting of refractory, unloading at site, leading, lifting, stacking at 9m elevation of Boiler, chipping removal of old defective refractory, cleaning, surface preparation, mixing the refractory with water application, transporting to the burner elevations through sky climber, applying refractory in burner at various elevation and OFA area. | 50 | nos | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_856280.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .