| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC | ₹2.4 Cr | 1 | Accepted-AOC the rate quoted by the bidder is less than put tender value |
| 2 | 2₹2.4 Cr+₹2.3 L (0.95%)Rejected-AOC | ₹2.4 Cr+₹2.3 L (0.95%) | 2 | Rejected-AOC the rate quoted by the bidder is higher than put tender value |
| Sl No | Description | Qty | Unit | V RAJAVELU L1 | R.NIKESH L2 |
|---|---|---|---|---|---|
| 1.00 | Carefully dismantling the existing damaged lime concrete (weathering course) which was already laid without disturbing the existing structure of the temple and incluidng charges for removing all debris from the site of work | 375 | cum | 442 ₹1,65,750 Lowest | 445 ₹1,66,875 |
| 2.00 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the pavukkal in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | 375 | cum | 3,957.5 ₹14,84,062.5 Lowest | 3,960 ₹14,85,000 |
| 3.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in lime mortar 1:1.5 (one part of lime and one point five part of sand) 12mm thick mixed with water proofing compound conforming to ISS at two percent by weight of lime used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 1,317 | sqm | 1,225 ₹16,13,325 Lowest | 1,235 ₹16,26,495 |
| 4.00 | Cleaning the stone surfaces by water washing the stone elements like wall, piller, uthiram, pothiyal, pavukkal and etc., including cost of material and labour charges etc,. | 4,388 | sqm | 43 ₹1,88,684 Lowest | 44 ₹1,93,072 |
| 5.00 | Pointing the cut stone joints with cement mortar 1:3 (one part of cement and three part of sand) 10mm deep including cost of special tiles such brush and watering, curing etc complete, as per standard specifications | 1,916 | sqm | 267 ₹5,11,572 Lowest | 271 ₹5,19,236 |
| 6.00 | Removing the undulated and dislodged stone flooring from sannathi and stacking it for refixing including cost and conveyance labor, handling and etc., all complete complying with standard specification. | 1,528 | sqm | 640 ₹9,77,920 Lowest | 650 ₹9,93,200 |
| 7.00 | Refixing the removed stone flooring with single line dressing and lime mortar 1:1.5 (one part of lime and one point five part of sand) pointing as same as it exists that including labour charges for fixing, handling and etc., all complete complying with standard specification. | 1,528 | sqm | 1,706 ₹26,06,768 Lowest | 1,725 ₹26,35,800 |
| 8.00Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft. | |||||
| 8.10 | Vimanam/ Gopuram upto 15'-00" ht | 521 | sqm | 281 ₹1,46,401 Lowest | 299 ₹1,55,779 |
| 8.20 | Vimanam/ Gopuram upto 25'-00" ht | 1,200 | sqm | 377 ₹4,52,400 Lowest | 389 ₹4,66,800 |
Tender Value
₹2.4 Cr
EMD Value
₹1.3 L
Closing Date
13 Mar 2025, 2:00 pmClosed
Assitant commissioner/Executive officer
A/m Sanjeevirayar Temple at iyangarkulam village kancheepuram taluk and district
Renovation works in A/m Sanjeevirayar Temple at iyangarkulam village kancheepuram taluk and district
2025_HRCE_521551_2
01/2025
Open Tender
Civil Works - Others
Lump-sum
365 days
Iyangarkulam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.3 L
Yes
2 Sept 2025
27 Feb 2025
13 Mar 2025
27 Feb 2025
13 Mar 2025
27 Feb 2025
Amount
Carefully dismantling the existing damaged lime concrete (weathering course) which was already laid without disturbing the existing structure of the temple and incluidng charges for removing all debris from the site of work
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the pavukkal in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in lime mortar 1:1.5 (one part of lime and one point five part of sand) 12mm thick mixed with water proofing compound conforming to ISS at two percent by weight of lime used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Cleaning the stone surfaces by water washing the stone elements like wall, piller, uthiram, pothiyal, pavukkal and etc., including cost of material and labour charges etc,.
Pointing the cut stone joints with cement mortar 1:3 (one part of cement and three part of sand) 10mm deep including cost of special tiles such brush and watering, curing etc complete, as per standard specifications
Removing the undulated and dislodged stone flooring from sannathi and stacking it for refixing including cost and conveyance labor, handling and etc., all complete complying with standard specification.
Refixing the removed stone flooring with single line dressing and lime mortar 1:1.5 (one part of lime and one point five part of sand) pointing as same as it exists that including labour charges for fixing, handling and etc., all complete complying with standard specification.
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
Vimanam/ Gopuram upto 15'-00" ht
Vimanam/ Gopuram upto 25'-00" ht
Brick masonry lime mortar 1:2 (one part of lime and two part of sand) using Second class ground moulded Chamber bricks size 9" x 43/8" x 23/4" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
Vimanam / Gopuram of height up to 15' 0" (excluding kalkaram)
Vimanam / Gopuram of height up to 50' 0" (excluding kalkaram)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortar1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
Vimanam / gopuram of ht. Up to 15'0" excluding Kalkaram
Vimanam / gopuram of ht. Up to 50'0" excluding Kalkaram
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds complete compyling standard specifications
Painting two coat with approved water based exterior emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface, curing in all floors including brushes etc., complete compyling as per standard specification.
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete complying with standard specifications.
Door size - 1.34 x 1.96m
Door size - 1.54 x 1.96m
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:5:10 (One part of cement five part of M-sand and ten part of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete as per Std, Specification and as directed by the Dept, Officers
Brick work in lime mortar 1:2 (one part of lime and two part of sand) using sHerritage bricks size 6-3/4" x 4-1/4" x 1-4/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Flooring with cut stone slab of size 600mm x 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With lime mortar 1:1.5 (one part of lime and one point five part of sand) & lime mortar 1:1.5 etc complete.
Supplying and fixing mild steel grill gate for windows, ventilators, etc., including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications. including one coat of zinc chloride primer coat
sub total
R.NIKESH (BID ID -1269892)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_629304.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .