Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹19.9 Laccepted-aoc | ₹19.9 L | accepted-aoc |
Tender Value
₹24.2 L
EMD Value
₹25,000
Closing Date
16 Mar 2026, 9:30 pmClosed
Public Works Department
Construction of C.C road and C.C drain S.T Colony of Hedigonda village in byadgi taluk of Byadgi constituency. (RESERVED FOR SC CATEGORY)
273061
PWD/2025-26/RD/WORK_INDENT34076
Reserved
Roads
PWD Division Office Haveri
8 documents required · 8 mandatory
₹610
₹25,000
16 Mar 2026
5 Mar 2026
13 Mar 2026
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Concrete Works - Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay...
For Drin and CD Work
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Appendix I Additionalities for Formwork, Centering and Scaffolding Foundation, Sub structure of Cross drainages (SR 2023-24 V-I , P.No -111 I.No: 3)
---- including equipments and all other inciden...
Qty as per I. No-17 ( Percentage on finished rate of concrete per m3
---- including equipments and all other incidental charges
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
LOC Format Letter.pdf
Others - LOC Format • 1.75 MB
KW2 INo 34076 SC.doc
Tender Document • 0.24 MB
Tender Notification.pdf
Others - Tender Notification • 2.13 MB
Download all tender documents and submit your bid